Irrigation And Flood Control Department-IFCD has published Tender For Stage Contract For Providing Men, Machinery And Materials Etc For The Execution Of Emergent Unforeseen Works As Per Requirement Falling Under Jurisdiction Of Irrigation Sub.Division Rhl Tragpora For The Year 2024. Submission Date for this Tender is 25-03-2024. Earth Moving Machinery Tenders in baramulla Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil. |
2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, Cables etc. (not exceeding 1.5 mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 sq mtr. On plan, including dressing of sides and ramming of bottoms lift upto 1.5 mtr. including getting out excavated earth and disposal of surplus excavated earth as directed, all kinds of soils. |
5 | lead upto 1 meter from Cutting edge |
6 | lead 25 meter beyond 1 meter from Cutting edge |
7 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres, All kinds of soil. |
8 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil |
9 | Removal ofSilt (removal of blockages) from canals Inclusive of initial lead and lift ( 50m & 1.5m) respectively. |
10 | Slip clerance in soils; |
11 | In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
12 | In soils; mixed with moorum/Kankar/shingle/ boulders; disposal lead upto 50 m and lift upto 1.5 m. |
13 | Weed clearance: From canals(including extraction of roots) |
14 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. |
15 | Filling empty cement bags with sand/earth: including cost of sewing & strings; excluding cost of bags & earth/sand. |
16 | Supply of EC bags |
17 | Laying in position earth filled cement bags as per the direction of Engineer Incharge excluding the cost of EC Bags, supply of earth, filling excavated earth into bags, sewing, strings (L.M.R) |
18 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) |
19 | Providing and laying of polythene of specified weight of approved brand and colour incl. all carriages complete job. |
20 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
21 | Providing and laying in position specified grade of reinforced cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. |
22 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (Mild steel bars). |
23 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: |
24 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
25 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
26 | Centering and shuttering including strutting, propping etc. and removal of form work for; |
27 | Foundations, footings, Bases for Columns |
28 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. |
29 | Suspended floors, roofs, landings, balconies, and access platforms. |
30 | Columns, pillars, piers, abutments, posts and struts. |
31 | Dumping stone excluding cost of stones. in Horizontal on level |
32 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
33 | Supply of 4"x4" mesh 16"x16" size B.A wire knitted crates made of 4 mm dia wire including all carriages |
34 | Supply of Quarry Stones (2nd Class) |
35 | Supply of binding wire for lids/binding of crates @ 2kg/crate |
36 | Supply of stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%) |
37 | Repairing/Removing /Dismantling of winch machines from super structure, incl winch rods, connecting rods, casings etc andmaking good/operational by removing dents from winch rods and repair to winch machines by cleaning, greasing etccomplete job (As per rate analysis) |
38 | Removing/Refixing for making good of existing gate shutters of any size & providingdenting , welding,whereever necessary& repairs/denting/ greasing to guide channels wherever necessaryincl all carriages complete job. as per directions of Engr-in -charge (As per rate analysis |
39 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. |
40 | Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations. |
41 | Welded steel wire fabric fencing with posts of specified material and of standard design placed and embedded in cement concrete blocks 45x45x 60 cm of mix 1:5:10 (1 cement:5 fine sand : 10 graded stone aggregate 40 mm nominal size), every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in cement concrete blocks 70x45x50 cm of the same mix, provided with welded steel wire fabric fixed between the posts fitted and fixed with G.I. staples on wooden plugs or tied to 6 mm bar nibs with G.I. Binding wire (cost of posts, welded steel wire fabric, painting, earth work in excavation and concrete to be paid for separately). |
42 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. |
43 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Welded) |
44 | 12 mm cement plaster (1:4 mix) |
45 | Providing, fixing in positionflats upto 10 mm thickness including cutting, hoisting & welding. Complete Job. (L.M.R) |
46 | Engagement of labour / Beldar, Mazdoor |
47 | Fitter/Blacksmith |
48 | Mason |
49 | Carpenter |
50 | Hire charges of Tippers for disposal of unhygenic material/other depositions incl cost of fuel. |
51 | Hire charges of Tractors for disposal of unhygenic material/Other deposition incl. cost of fuel |
52 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
53 | Beyond 30cm girth upto and including 60cm girth. |
54 | Beyond 60cm girth upto and including 120cm girth |
55 | Providing and Laying PVC Polythene of special quality |
56 | Hire charges for Brush Cutter with operator including fuel charges |
57 | Supply of fuel(diesel) |
58 | Supply of Fuel (Petrol) |
59 | Engagement of vechile/Taxi for carrying staff to different sites during raids, Encroachment drives and flood like situations. |
60 | P/F of trash guard made of3 to 4 mm thick wire mesh having mesh size 50 mm x 50 mm or less , incl all other accessories (complete Job) |
61 | P/L of PVC pipes incl all carriages ( complete Job) |
62 | 200 mm dia |
63 | 250 mm dia |
64 | 300 mm dia |
65 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
66 | 1.60 mm thick with zinc coating not less than 350 gram/m2 |
67 | 1.25 mm thick with zinc coating not less than 350 gram/m2 |
68 | 1.00 mm thick with zinc coating not less than 275 gram/m2 |
69 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) |
70 | 15 mm dia. nominal bore |
71 | 20 mm dia. nominal bore |
72 | 25 mm dia. nominal bore |
73 | 32 mm dia. nominal bore |
74 | 40 mm dia. nominal bore |
75 | 50 mm dia. nominal bore |
76 | 100 mm dia nominal bore |
77 | 150 mm dia nominal bore |
78 | P/L of nallah muck of n/s 40 mm to 80 mm incl dressing incl all carriages (Complete job) |
79 | Hire charges of Chainsaw Machine with operator and fuel charges for demolishing drives ,cutting of trees etc |
80 | Hire charges of welding machine with operator and fuel charges |
81 | Engagement of boat along with boatman for removing of trash/ unhygenic material |
82 | Engagement of hydraulic excavator(Tyre mounted) including cost of fuel and hire chaghers of operator. |
83 | Engagement of hydraulic excavator(Chain mounted) including cost of fuel and hire charges of operator. |
84 | Hiring of platform for carrying of LNT from source upto site of work incl fuel charges one side trip only(No of trips) |
85 | hiring of dewatering pump set including fuel/operator charges |
86 | repairs to brush cutters wood cutters, and other tools andmachinery etc. |
87 | Carriage of materials by Mechanical Transport including loading, unloading and stacking |
88 | a) Earth upto 1 Km |
89 | 2 km |
90 | 3 Km |
91 | 4 km |
92 | 5 km |
93 | Beyond 5 Km upto 10 km /km |
94 | Beyond 10 Km upto 20 km /km |
95 | Beyond 20 km /everyadditional Km |
96 | b) Crates upto 1 km |
97 | 2 km |
98 | 3 Km |
99 | 4 km |
100 | 5 km |
101 | Beyond 5 Km upto 10 km /km |
102 | Beyond 10 Km upto 20 km /km |
103 | Beyond 20 km /everyadditional Km |
104 | c) Stone upto 1 km |
105 | 2 km |
106 | 3 Km |
107 | 4 km |
108 | 5 km |
109 | Beyond 5 Km upto 10 km /km |
110 | Beyond 10 Km upto 20 km /km |
111 | Beyond 20 km /everyadditional Km |
112 | d) EC bags 1 kms |
113 | 2 km |
114 | 3 Km |
115 | 4 km |
116 | 5 km |
117 | Beyond 5 Km upto 10 km /km |
118 | Beyond 10 Km upto 20 km /km |
119 | Beyond 20 km /everyadditional Km |
120 | e) Sand/ stone aggregate 20 mm nominal size upto 1 kms |
121 | 2 km |
122 | 3 Km |
123 | 4 km |
124 | 5 km |
125 | Beyond 5 Km upto 10 km /km |
126 | Beyond 10 Km upto 20 km /km |
127 | Beyond 20 km /everyadditional Km |
128 | f) Steel/ Cement upto 1 kms |
129 | 2 km |
130 | 3 Km |
131 | 4 km |
132 | 5 km |
133 | Beyond 5 Km upto 10 km /km |
134 | Beyond 10 Km upto 20 km /km |
135 | Beyond 20 km /everyadditional Km |
136 | g) Stone aggregates 40 mm upto 1 kms |
137 | 2 km |
138 | 3 Km |
139 | 4 km |
140 | 5 km |
141 | Beyond 5 Km upto 10 km /km |
142 | Beyond 10 Km upto 20 km /km |
143 | Beyond 20 km /everyadditional Km |
144 | Carriage of materials by Manual Labour including loading, unloading and stacking |
145 | a) Earth First 50 mtrs. |
146 | for every additional 50 mtrs |
147 | b) Crates First 50 mtrs. |
148 | for every additional 50 mtrs |
149 | C) Stones/ Boulders First 50 mtrs. |
150 | for every additional 50 mtrs |
151 | d) EC Bags First 50 mtrs. |
152 | for every additional 50 mtrs |
153 | e) Sand/ stone aggregate 20 mm nominal size First 50 mtrs. |
154 | for every additional 50 mtrs |
155 | f) Stone aggregates 40 mm First 50 mtrs. |
156 | for every additional 50 mtrs |
157 | g) Cement/Steel First 50 mtrs. |
158 | for every additional 50 mtrs |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy