Irrigation And Flood Control Department-IFCD has published Tender For Providing Men Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches Floods Clamity Etc Of Qazigund Sub Division For The Year 2024-25 Stage Contract. Submission Date for this Tender is 20-03-2024. Uniform Tenders in qazigund Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | earthwork |
2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : |
3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : |
4 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.1 All kinds of soil : |
5 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : 2.10.1 All kinds of soil : |
6 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) wet |
7 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry |
8 | Slip clearance in ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
9 | Slip clearance in soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m |
10 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand |
11 | Supply of EC Bags Jute |
12 | Laying in position earth filled cement bags as per the direction of Engineer Incharge excluding the cost of EC Bags supply of earth filling excavated earth into bags, sewin, Strings (LMR) |
13 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) |
14 | providing and laying polythene of specified weight of approved brand and colour including all carriages complete job |
15 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
16 | CAST-IN-SITU Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
17 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
18 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 11.3.1 25mm thick with 12.5 mm nominal size stone aggregate. |
19 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate. |
20 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. |
21 | Centering and shuttering incl strutting , propping etc and removal of formwork for retaining walls return walls walls (any thickness) including attached pilasters, buttresses, plinth and string course fillets, kerbs and steps etc |
22 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns |
23 | Dumping stones excluding cost of stones in horizontal on level |
24 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
25 | Supply of 4” x 4” and 16’ x 16’ B A Wire mesh should be of 4mm dia confirming to IS280 in tensile strength and otherdetails should be confirming to relevant IS specifications (IS Code). |
26 | supply of binding wire for lids/ binding of crates @ 2.0 kgs per crate |
27 | supply of stone boulders (Nallah) nominal size 225 mm (stack measurement reduced by 15%) |
28 | Dismentling of winch machines from super structure, including winch rod, connecting rods, casings, etc and making good / operational by removing dents, from winch rods and repair to winch machines by cleaning, greasing etc complete job |
29 | Removing / refixing for making good of existing gate shutters of any size and providing denting, welding wherever necessary and repair / denting to guide channels wherever necessary including all carriage complete job as per directions of engineer in charge |
30 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. |
31 | Supply of High Quality brush cutter 52CC 2 stroke Petrol engine of approved brand |
32 | Supply of fuel (petrol) |
33 | Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations. |
34 | Providing of PVC pipes of 0.15 mtr dia of standard quality including carriage |
35 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 2.27.1 Beyond 30 cm girth upto and including 60 cm girth. |
36 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth. |
37 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth. |
38 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Above 240 CM girth |
39 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. welded |
40 | Engagement of hydraulic excavator for different nature of works including fuel charges (Complete Job) |
41 | CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 13.1.1 1 : 4 ( 1 cement : 4 fine sand) |
42 | Providing long type safty shoes |
43 | Providing of tools and equipments ie. Spades pickles axes Panjas Big Axex Helment Hand Saw Uniform pruning saw steel rod |
44 | carriage of material |
45 | Carriage of cement from average 05km |
46 | Carriage of sand from average 5Km |
47 | Carriage of aggregates 20mm from average 05 km |
48 | Carriage of soling from average 05 km by mechanical transport |
49 | Earth by MT 05KM |
50 | EC Bags avg lead 5KM |
51 | steelavg lead 5KM |
52 | Extra for every additional lead of 1km beyond 5km upto 10 km my MT |
53 | cement |
54 | sand |
55 | aggregate |
56 | soling |
57 | earth |
58 | EC Bag |
59 | Steel |
60 | Extra for every additional lead of 1km beyond 10 km upto 20 km my MT |
61 | cement |
62 | sand |
63 | aggregate |
64 | soling |
65 | earth |
66 | EC Bag |
67 | Steel |
68 | Carriage of meterials by an average Head load of 50mtrs |
69 | cement |
70 | sand |
71 | aggregate |
72 | Stone solling |
73 | earth |
74 | EC Bags |
75 | Steel |
76 | Extra for every additional leadof 50mtrsby HL beyond first 50 mtrts |
77 | cement |
78 | sand |
79 | aggregate |
80 | Stone solling |
81 | earth |
82 | EC Bags |
83 | Steel |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail