}

Tender For Providing Men Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches Floods Clamity Etc Of Banimullah Sub Division For The Year 2024-25 Stage Contract., Kulgam-Jammu And Kashmir

Irrigation And Flood Control Department-IFCD has published Tender For Providing Men Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches Floods Clamity Etc Of Banimullah Sub Division For The Year 2024-25 Stage Contract.. Submission Date for this Tender is 20-03-2024. Uniform Tenders in Kulgam Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

42897607
Tender For Providing Men Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches Floods Clamity Etc Of Banimullah Sub Division For The Year 2024-25 Stage Contract.
Open Tender
Indian
Jammu And Kashmir
Kulgam
20-03-2024

Tender Details

Providing Men Machinery And Materials For Execution Of Emergent Works At Site As Per Requirement Due To Breaches Floods Clamity Etc Of Banimullah Sub Division For The Year 2024-25 Stage Contract.-2 Earth Work In Surface Excavation Not Exceeding 30 Cm In Depth But Exceeding 1.5 M In Width As Well As10 Sqm On Plan Including Disposal Of Excavated Earth, Leadupto50meterand Lift Upto 1.5M, As Directed By Engineer-In-Charge.All Kinds Of Soil : 3 Earth Work In Bulk Excavation By Manual Means Over Areas ( Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 M2 On Plan ) Including Disposal Of Excavated Earthlead Upto 50 Meters And Lift Upto 1.5 M, As Directed By Engineer-In-Charge.2.6.1 All Kinds Of Soil : 4 Earth Work In Bulk Excavation By Mechanical Means ( Hydraulic Excavator ) Over Areas ( Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 M2 On Plan ) Including Disposal Of Excavated Earth Lead Upto 50 Meters And Lift Upto 1.5 M, As Directed By Engineer-In-Charge.2.7.1 All Kinds Of Soil : 5 Extra For Every Additional Lift Of 1.5 M Or Part Thereof In Excavation / Banking Excavated Or Stacked Material :2.10.1 All Kinds Of Soil : 6 Silt Clearance From Canals. Inclusive Of Initial Lead And Lift ( 50M & 1.5M Respectively ) Wet 7 Silt Clearance From Canals. Inclusive Of Initial Lead And Lift ( 50M & 1.5M Respectively ) Dry 8 Slip Clearance In Ordinary Soils Disposal Lead Upto 50 M And Lift Upto 1.5 M. 9 Slip Clearance In Soils; Mixed With Moorum / Kankar / Shingle / Boulders; Disposal Lead Upto 50 M And Lift Upto 1.5 M 10 Filling Empty Cement Bags With Sand / Earth; Including Cost Of Sewing And Strings; Excluding Cost Of Bags And Earth / Sand 11 Supply Of Ec Bags Jute 12 Laying In Position Earth Filled Cement Bags As Per The Direction Of Engineer Incharge Excluding The Cost Of Ec Bags Supply Of Earth Filling Excavated Earth Into Bags, Sewin, Strings ( Lmr ) 13 Supplying And Stacking Of Good Earth At Site Including Royalty ( Earth Measured In Stacks Will Be Reduced By 20% For Payment ) 14 Providing And Laying Polythene Of Specified Weight Of Approved Brand And Colour Including All Carriages Complete Job 15 Cement Concrete ( Cast-In-Situ ) Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing Butexcluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With:1:3:6 ( 1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size ) 16 Cast-In-Situ Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete Includingcuring But Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement. Allworks Upto Plinth Level1:2:4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 20 Mm Nominal Size ) 17 Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Level Thermo-Mechanically Treated Bars Of Grade Fe-500D Or More. 18 Cement Concrete Flooring 1:2:4 ( 1Cement: 2 Coarse Sand: 4 Graded Stone Aggregate ) Finished With A Floating Coat Of Neat Cement Including Cement Slurry And Curing Complete, But Excluding The Cost Of Nosing Of Steps Etc. Complete.11.3.1 25Mm Thick With 12.5 Mm Nominal Size Stone Aggregate. 19 Cement Concrete Flooring 1:2:4 ( 1Cement: 2 Coarse Sand: 4 Graded Stone Aggregate ) Finished With A Floating Coat Of Neat Cement Including Cement Slurry And Curing Complete, But Excluding The Cost Of Nosing Of Steps Etc. Complete. 40Mm Thick With 20 Mm Nominal Size Stone Aggregate. 20 Cement Concrete Flooring 1:2:4 ( 1Cement: 2 Coarse Sand: 4 Graded Stone Aggregate ) Finished With A Floating Coat Of Neat Cement Including Cement Slurry And Curing Complete, But Excluding The Cost Of Nosing Of Steps Etc. Complete. 50 Mm Thick With 20Mm Nominal Size Stone Aggregate. 21 Centering And Shuttering Incl Strutting , Propping Etc And Removal Of Formwork For Retaining Walls Return Walls Walls ( Any Thickness ) Including Attached Pilasters, Buttresses, Plinth And String Course Fillets, Kerbs And Steps Etc 22 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form Work For:4.6.1 Foundations, Footings, Bases For Columns 23 Dumping Stones Excluding Cost Of Stones In Horizontal On Level 24 Hand-Packing Stones In Wire-Crates; Excluding Cost Of Crates And Stones 25 Supply Of 4” X 4” And 16’ X 16’ B A Wire Mesh Should Be Of 4Mm Dia Confirming To Is280 In Tensile Strength And Otherdetails Should Be Confirming To Relevant Is Specifications ( Is Code ) . 26 Supply Of Binding Wire For Lids / Binding Of Crates @ 2.0 Kgs Per Crate 27 Supply Of Stone Boulders ( Nallah ) Nominal Size 225 Mm ( Stack Measurement Reduced By 15% ) 28 Dismentling Of Winch Machines From Super Structure, Including Winch Rod, Connecting Rods, Casings, Etc And Making Good / Operational By Removing Dents, From Winch Rods And Repair To Winch Machines By Cleaning, Greasing Etc Complete Job 29 Removing / Refixing For Making Good Of Existing Gate Shutters Of Any Size And Providing Denting, Welding Wherever Necessary And Repair / Denting To Guide Channels Wherever Necessary Including All Carriage Complete Job As Per Directions Of Engineer In Charge 30 Surface Dressing Of The Ground Including Removing Vegetation And In-Equalities Not Exceeding 15 Cm Deep And Disposal Of Rubbish, Lead Upto 50 M And Lift Upto1.5 M In -All Kinds Of Soil. 31 Supply Of High Quality Brush Cutter 52Cc 2 Stroke Petrol Engine Of Approved Brand 32 Supply Of Fuel ( Petrol ) 33 Constructing Muthu Bunds, Comprising Boulders And Wood Bushes In Alternate Layers; Including Working In Water Situations. 34 Providing Of Pvc Pipes Of 0.15 Mtr Dia Of Standard Quality Including Carriage 35 Felling Trees Of The Girth ( Measured At A Height Of 1 M Above Ground Level ) Including Cutting Of Trunk And Branches, Removing The Roots And Stacking Of Serviceable Material And Disposal Of Unserviceable Material. 2.27.1 Beyond 30 Cm Girth Upto And Including 60 Cm Girth. 36 Felling Trees Of The Girth ( Measured At A Height Of 1 M Above Ground Level ) Including Cutting Of Trunk And Branches, Removing The Roots And Stacking Of Serviceable Material And Disposal Of Unserviceable Material. Beyond 60 Cm Girth Upto And Including 120 Cm Girth. 37 Felling Trees Of The Girth ( Measured At A Height Of 1 M Above Ground Level ) Including Cutting Of Trunk And Branches, Removing The Roots And Stacking Of Serviceable Material And Disposal Of Unserviceable Material. Beyond 120 Cm Girth Upto And Including 240 Cm Girth. 38 Felling Trees Of The Girth ( Measured At A Height Of 1 M Above Ground Level ) Including Cutting Of Trunk And Branches, Removing The Roots And Stacking Of Serviceable Material And Disposal Of Unserviceable Material. Above 240 Cm Girth 39 Structural Steel Work In Built Up Sections, Trusses And Framed Work, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete. Welded 40 Engagement Of Hydraulic Excavator For Different Nature Of Works Including Fuel Charges ( Complete Job ) 41 Cement Plaster ( In Fine Sand ) 12Mm Cement Plaster Of Mix:13.1.1 1 : 4 ( 1 Cement : 4 Fine Sand ) 42 Providing Long Type Safty Shoes 43 Providing Of Tools And Equipments Ie. Spades Pickles Axes Panjas Big Axex Helment Hand Saw Uniform Pruning Saw Steel Rod 44 6 Providing And Fixing G.I. Pipes Complete With G.I. Fittings Excluding Trenching And Refilling Etc. ( External Work ) Medium 45 C.I. Sluice Valves, Fire Hydrants And Fixturesproviding And Fixing C.I. Sluice Valves ( With Cap ) Complete With Bolts, Nuts, Rubber Insertions Etc. ( The Tail Pieces If Required Will Be Paid ( Class Ii ) 46 Providing Fixing In Position Flats Upto 10Mm Thickness Including Cutting Hoisting And Welding Complete Job 47 Random Rubble Masonryrandom Rubble Masonry With Hard Stone In Foundation And Plinthincluding Leveling Up With Cement Concrete 1:6:12 ( 1 Cement : 6 Coarsesand : 12 Graded Stone Aggregate 20Mm Nominal Size ) Upto Plinth Level And Curing Complete With: 7.1.1 Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) Nallah 48 Random Rubble Masonry With Hard Stone In Superstructure Above Plinth Level And Upto Floor Five Level, Including Levelling Up With Cement Concrete 1:6:12 ( 1 Cement : 6 Coarse Sand : 12 Graded Stone Aggregate 20Mm Nominal Size ) And Curing Complete At Window Sills, Ceiling Level And The Like:7.2.1 Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) Nallah 49 Carriage Of Material 50 Carriage Of Cement From Average 05Km 51 Carriage Of Sand From Average 5Km 52 Carriage Of Aggregates 20Mm From Average 05 Km 53 Carriage Of Soling From Average 05 Km By Mechanical Transport 54 Earth By Mt 05Km 55 Ec Bags Avg Lead 5Km 56 Steelavg Lead 5Km 57 Gi Pipesavg Lead 5Km 58 Extra For Every Additional Lead Of 1Km Beyond 5Km Upto 10 Km My Mt 59 Cement 60 Sand 61 Aggregate 62 Soling 63 Earth 64 Ec Bag 65 Steel 66 Gi Pipes 67 Extra For Every Additional Lead Of 1Km Beyond 10 Km Upto 20 Km My Mt 68 Cement 69 Sand 70 Aggregate 71 Soling 72 Earth 73 Ec Bag 74 Steel 75 Gi Pipes 76 Carriage Of Meterials By An Average Head Load Of 50Mtrs 77 Cement 78 Sand 79 Aggregate 80 Stone Solling 81 Earth 82 Ec Bags 83 Steel 84 Gi Pipes 85 Extra For Every Additional Leadof 50Mtrsby Hl Beyond First 50 Mtrts 86 Cement 87 Sand 88 Aggregate 89 Stone Solling 90 Earth 91 Ec Bags 92 Gi Pipes 93 Steel

Key Value

Document Fees
INR 300 /-
EMD
INR 7200.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Providing men, machinery, materials for execution of emegent works at site as per requirement due to breaches/ floods/ calamity etc for irrigation canals of Banimullah Sub Divisionfor the year 2024-25 (Rs.2.40 lacs)
Sl. No. Item Description
1earthwork
2Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil :
3Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil :
4Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.1 All kinds of soil :
5Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : 2.10.1 All kinds of soil :
6Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) wet
7Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry
8Slip clearance in ordinary soils disposal lead upto 50 m and lift upto 1.5 m.
9Slip clearance in soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m
10Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand
11Supply of EC Bags Jute
12Laying in position earth filled cement bags as per the direction of Engineer Incharge excluding the cost of EC Bags supply of earth filling excavated earth into bags, sewin, Strings (LMR)
13Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)
14providing and laying polythene of specified weight of approved brand and colour including all carriages complete job
15CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
16CAST-IN-SITU Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
17Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
18Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 11.3.1 25mm thick with 12.5 mm nominal size stone aggregate.
19Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate.
20Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.
21Centering and shuttering incl strutting , propping etc and removal of formwork for retaining walls return walls walls (any thickness) including attached pilasters, buttresses, plinth and string course fillets, kerbs and steps etc
22Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns
23Dumping stones excluding cost of stones in horizontal on level
24Hand-packing stones in wire-crates; excluding cost of crates and stones
25Supply of 4” x 4” and 16’ x 16’ B A Wire mesh should be of 4mm dia confirming to IS280 in tensile strength and otherdetails should be confirming to relevant IS specifications (IS Code).
26supply of binding wire for lids/ binding of crates @ 2.0 kgs per crate
27supply of stone boulders (Nallah) nominal size 225 mm (stack measurement reduced by 15%)
28Dismentling of winch machines from super structure, including winch rod, connecting rods, casings, etc and making good / operational by removing dents, from winch rods and repair to winch machines by cleaning, greasing etc complete job
29Removing / refixing for making good of existing gate shutters of any size and providing denting, welding wherever necessary and repair / denting to guide channels wherever necessary including all carriage complete job as per directions of engineer in charge
30Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
31Supply of High Quality brush cutter 52CC 2 stroke Petrol engine of approved brand
32Supply of fuel (petrol)
33Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
34Providing of PVC pipes of 0.15 mtr dia of standard quality including carriage
35Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 2.27.1 Beyond 30 cm girth upto and including 60 cm girth.
36Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth.
37Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth.
38Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Above 240 CM girth
39Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. welded
40Engagement of hydraulic excavator for different nature of works including fuel charges (Complete Job)
41CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 13.1.1 1 : 4 ( 1 cement : 4 fine sand)
42Providing long type safty shoes
43Providing of tools and equipments ie. Spades pickles axes Panjas Big Axex Helment Hand Saw Uniform pruning saw steel rod
446 Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) Medium
45C.I. SLUICE VALVES, FIRE HYDRANTS AND FIXTURES Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid (Class II)
46Providing fixing in position flats upto 10mm thickness including cutting hoisting and welding complete job
47RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
48Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like:7.2.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
49carriage of material
50Carriage of cement from average 05km
51Carriage of sand from average 5Km
52Carriage of aggregates 20mm from average 05 km
53Carriage of soling from average 05 km by mechanical transport
54Earth by MT 05KM
55EC Bags avg lead 5KM
56steelavg lead 5KM
57GI Pipesavg lead 5KM
58Extra for every additional lead of 1km beyond 5km upto 10 km my MT
59cement
60sand
61aggregate
62soling
63earth
64EC Bag
65Steel
66GI Pipes
67Extra for every additional lead of 1km beyond 10 km upto 20 km my MT
68cement
69sand
70aggregate
71soling
72earth
73EC Bag
74Steel
75GI Pipes
76Carriage of meterials by an average Head load of 50mtrs
77cement
78sand
79aggregate
80Stone solling
81earth
82EC Bags
83Steel
84GI Pipes
85Extra for every additional leadof 50mtrsby HL beyond first 50 mtrts
86cement
87sand
88aggregate
89Stone solling
90earth
91EC Bags
92GI Pipes
93Steel
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail