}

Tender For Term Contract For Artificer Works In Certain Md Accommodations Under Age B/R East At Af Stn Jalahalli, jalahalli-Karnataka

Military Engineer Services-MES has published Tender For Term Contract For Artificer Works In Certain Md Accommodations Under Age B/R East At Af Stn Jalahalli. Submission Date for this Tender is 09-04-2024. Civil Work Tenders in jalahalli Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

42859373
Corrigendum : Tender For Term Contract For Artificer Works In Certain Md Accommodations Under Age B/R East At Af Stn Jalahalli
Open Tender
Indian
Karnataka
jalahalli
09-04-2024

Tender Details

Tender For Term Contract For Artificer Works In Certain Md Accommodations Under Age B / R East At Af Stn Jalahalli; 1 Laying And Jointing Pvc Pipe. Heading 2 The Term Contract Is To Cover For Carrying Out Any Number Of Work Orders Which May Be Ordered On Him During The Fixed Term Such As Minor Works, Repair And Maintenance Of Existing Buildings / Structures And Allied Services As Per Ssr Part Ii Within The Specified Area. The Work Will Be Ordered As And When Necessity Arises And Will Be Measured Against Items Listed In Ssr ( Mes Standard Schedule Of Rates ) Priced At Rates Given In Ssr-2020 ( Part-Ii ) Including All Amendments Issuedtillreceipt Of Tender Adjusted By The Percentage Quoted By The Contractor. The Contract Shall Be For A Period Of 12 ( Twelve ) Months. The Percentage Shall Be Quoted Accordingly.Note - ( I ) Tenderer Shall Insert Percentage At The Appropriate Cell Of This Boq Excel Sheet ( Ii ) Tenderer Shall Refer And Select The Option Excess ( + ) Or Less ( - ) To Quote The Percentage Above Or Below Ssr Part-Ii - 2020 ( Rates ) , If 0 % Quoted The Same Shall Be Treated At Par With Ssr Part-Ii 2020 ( Rates ) . ( Iii ) Amount Inserted By Mes In Respective Column And The Total Amount Reflected In This Page Is Approximate And For Reference Only.Being Term Contract, Work Orders Shall Be Priced At Rates Given In Ssr2020 Part Ii And Adjusted By The Percentage Quoted By The Contractor Upto The Estimated Cost Indicated In The Nit / Tender Documents. Irrespective Of Amount Shown In Under Column 6, Total Amount Of This Boq On This Page. 3 Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete 4 Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete 5 Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In 6 B ) Ci Bend 22.5° ( 250Mm Dia ) 7 Construction Of Chamber For 100Mm Sluice Plates 8 Construction Of Chamber For 100Mm Sluices Valve 9 Supplying, Conveying And Fixing Spls. Including Ea 10 Supplying, Conveying And Fixing Spls. Including Eart 11 Construction Of Chamber For 100Mm Sluice Plates 12 Construction Of Chamber For 100Mm Sluices Valve 13 Laying And Jointing Pvc Pipe. Heading 14 Plain Cement Concrete 1:4:8 ( One Cement Four Fine Aggregates And Eight Coarse Aggregates ) Using 15 Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost 16 Construction Of Chamber For 100Mm Sluices Valve 17 The Total Value Of Schedule1 18 The Total Value Of Schedule4

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 02-Apr-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 09-04-2024

Key Value

Document Fees
INR 500 /-
EMD
INR 98000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: TERM CONTRACT FOR ARTIFICER WORKS IN CERTAIN MD ACCNS UNDER AGE B/R EAST AT AF STN JALAHALLI
Sl. No. Item Description
1Laying and Jointing PVC Pipe. Heading
2The term contract is to cover for carrying out any number of work orders which may be ordered on him during the fixed term such as minor works, repair and maintenance of existing buildings/ structures and allied services as per SSR part II within the specified area. The work will be ordered as and when necessity arises and will be measured against items listed in SSR (MES standard schedule of rates) priced at rates given in SSR-2020 (part-II) including all amendments issuedtillreceipt of tender adjusted by the percentage quoted by the contractor. The contract shall be for a period of 12 (twelve) months. The percentage shall be quoted accordingly. Note - (i) Tenderer shall insert percentage at the appropriate cell of this BOQ excel sheet (ii) Tenderer shall refer and select the option Excess (+) or less (-) to quote the percentage above or below SSR Part-II - 2020 (Rates), if "0" % quoted the same shall be treated at par with SSR Part-II 2020 (Rates). (iii) Amount inserted by MES in respective column and the total amount reflected in this page is approximate and for reference only.Being Term Contract, work orders shall be priced at rates given in SSR2020 Part II and adjusted by the percentage quoted by the contractor upto the estimated cost indicated in the NIT/ tender documents. irrespective of amount shown in under column "6", " Total Amount" of this BOQ on this page.
3Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete
4Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete
5Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in
6b)CI bend 22.5° (250mm dia)
7Construction of chamber for 100mm sluice plates
8Construction of chamber for 100mm sluices valve
9Supplying, Conveying and fixing spls. Including ea
10Supplying, Conveying and fixing spls. Including eart
11Construction of chamber for 100mm sluice plates
12Construction of chamber for 100mm sluices valve
13Laying and Jointing PVC Pipe. Heading
14Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using
15Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost
16Construction of chamber for 100mm sluices valve
17The Total value of Schedule1
18The Total value of Schedule4
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail