}

Tender For Design, Construction, Erection, Testing And Commissioning Of 4.00 Mld Sewage Treatment Plant Based On Sequential Batch Reactor (Sbr) Technology Complete In All Respect Including Mps With Peak Factor 3, Landscaping, All Civil, Electrical, Mechan, Fatehabad-Haryana

Public Health Engineering Department-PHED has published Tender For Design, Construction, Erection, Testing And Commissioning Of 4.00 Mld Sewage Treatment Plant Based On Sequential Batch Reactor (Sbr) Technology Complete In All Respect Including Mps With Peak Factor 3, Landscaping, All Civil, Electrical, Mechan. Submission Date for this Tender is 04-04-2024. Sewage Treatment Plant Tenders in Fatehabad Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

42857963
Tender For Design, Construction, Erection, Testing And Commissioning Of 4.00 Mld Sewage Treatment Plant Based On Sequential Batch Reactor (Sbr) Technology Complete In All Respect Including Mps With Peak Factor 3, Landscaping, All Civil, Electrical, Mechan
Open Tender
Indian
Haryana
Fatehabad
04-04-2024

Tender Details

Tender For Design, Construction, Erection, Testing And Commissioning Of 4.00 Mld Sewage Treatment Plant Based On Sequential Batch Reactor ( Sbr ) Technology Complete In All Respect Including Mps With Peak Factor 3, Landscaping, All Civil, Electrical, Mechanical Work, Piping And Instrumentation Work With Plc And Scada Arrangement For Sbr Unit Of Stp And Mps, Laying The D.I. Rising Main Line As Described In Scope Of Work Of Dnit Including O And M For 12 Months During Defect Liability Period After Trial Run Of 3 Months And 5 Years Thereafter And All Other Works Contingent Thereto Distt. Fatehabad

Key Value

Document Fees
INR 20000 /-
EMD
INR 6453900.0 /-
Tender Value
INR 32.26 Crore /-

BOQ Items

Bhattu Kalan MAHAGRAM (STP 4.00 MLD): DNIT for Design, construction, erection, testing and commissioning of 4.00 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including MPS with peak factor 3, landscaping, all civil, Electrical, Mechanical work, Piping and Instrumentation work With PLC and SCADA Arrangement for SBR unit of STP and MPS, laying the D.I. rising main line as described in scope of work of DNIT including O and M for 12 months during defect liability period after trial run of 3 months and 5 years thereafter and all other works contingent thereto Distt. FatehabadDNIT cost Rs. 3226.93 lakhs
Sl. No. Item Description
1N.S. Item
2SEWAGE TREATMENT PLANT “Design, construction, erection, testing and commissioning of 4.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology with tertiary Treatment (T.T.) disc filter and disinfection arrangments including all electrical , machinical equipments DGset and Transformareof required capacity entire campus complete in all respect including, Landscaping, construction of 3 Nos. staff quarter each area 41 Sqm, construction of plinth protection 1 mtr wide around the all civil structureand car parking shed ,development of lawn, Construction of HT/LT Panel room,PLC room, Centrifuge house, blower room and Lab cum office building including doors, window and fitting with toilet block including sanitary fittings etc. as per approvedDNIT, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, covered area as per DNIT complete in all respect. and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device on inlet and outlet, Real Time water quality monitoring with Data collection system (ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH:- Supply, erection, testing and commissioning operation and maintenance of effluent quality monitoring system at 4.00 MLD STP for online (Continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-/20mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data in CPCB, HSPCB and PHED. TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluent and as contained in scope of work complete in all respect. (a) Multi-parameter measuring converter, for connecting upto 18 intelligent sensors Scope including 8 analog inputs/ Outputs (4 inputs and 4 outputs) (o/4-20 Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement in the outlet/ effluent of plant of 4.00 MLD STP with integrated with automatic cleaning. (b) Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature compensation (ATC) cable length 100 Meter (minimum) (c) Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (minimum) (d) Data Transfer to CPCB, HSPCB and PHED Servers during year of OandM after commissioning after 3 months trial period (including 1 year of defect liability period) (e) Providing GSM 5G, 4G Modem with mobile network connectivity including network charges.) Piping and Instrumentation works with PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other and all the IPSs including furniture and laboratory equipments. (i) (2 No. High Mast of 9 mtr. GI Octagonal pole of 4 mm thickness (T=100 MM, B= 200 MM, Base Plate-320x320x20mm), window at 500 mm from Base Plate) 12 Nos. Providing and fixing of Solar light 30 watt with dark and motion sensor, 2 level intelligent dimming after 3 and 6 hours of operation, IEC certified solar panel, LM80 certified LED, IP 65 complaint design to protect from rain and dust and UL certified lituimion battery with 2 year system warranty of 6 Mtr. GI pole complete in all respect, along the road and path complete in all respect. (ii) Providing and installing 2 No. centrifuges (1working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentation`s, electric panel board etc. as per design complete in all respect, including packing dry sludge in 20 kg Bag and supplying the same in Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT (iii) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work.
3CC TV CAMERA: Providing and Installing 20 CCTV Cameras (8 Cameras for STP and 4 IPS x 3 Nos Camerasfor each IPS = 12 Nos.) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen 5 Nos., 16 Channel DVR at STP Site and 8 Channel DVR at each MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. IPS and STP shall be synchronized at STP site including O and M for during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. i) At STP Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12 mm lens size, 1 Nos. 3.6mm lens size. Make: - CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode 2.4.2 12 mm very focal with extra IR. CCTV Cameras should be installed and commissioned before starting of the work. at 4.00 MLD STP
4Providing and fixing Stainless steel SS 304 mechanical coarse screen suitable size as per design complete in all respect.
5Sluice gate: Providing and fixing of suitable size CI sluice gate including pen stock to control the incoming sewage at MPS including all fixing complete in all respect to the entire satisfaction of Engineer-in-charge.
6Supply and Errection of 12 W LED Based Solar Light Street Light and pole of 5 mtr with RMS above ground level complete in all respect.
7Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 35.00 m as per the indicated requirements of discharge 600 LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect for 600 LPM x 35 mtr Head
8Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 50.00 m as per the indicated requirements of discharge 2800LPM and power capacity in BHP as per IS marked including all accessories (like S Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend)etc.complete in all respect for 2800 LPM X 50 MTR HEAD FOR TRATED EFFULENT 1 DWF
9Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 35.00 m as per the indicated requirements of discharge 1800 LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect for 1800 LPM x 35 mtr Head
10Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 35.00 m as per the indicated requirements of discharge 300 LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect for 300 LPM x 35 Mtr Head
11Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 50.00 m as per the indicated requirements of discharge 1400 LPM and power capacity in BHP as per IS marked including all accessories (like S Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend)etc. complete in all respect for 1400 LPM x 50 Mtr Head FOR TREATED EFFULENT 1/2 DWF
12Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 50.00 m as per the indicated requirements of discharge 8400 LPM and power capacity in BHP as per IS marked including all accessories (like S Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend)etc. complete in all respect. for 8400 LPM x 50 Mtr head FOR TREATED EFFULENT (3DWF)
13Supplying erection, testing of fully automatic electric control panel board for following pump set complete in all respect : - 1. 1000 LPM, 30 Mtr head= 2 Nos., 2. 500 LPM, 30 Mtr head = 2 Nos. 3. 3000 LPM, 30 Mtr Head= 1 No. for Panel for 5 Nos. pump sets
14Supplying erection, testing of fully automatic electric control panel board for following pump set complete in all respect : - 1. 200 LPM, 30 Mtr head= 2 Nos. 2. 400 LPM, 30 Mtr head = 2 Nos. 3. 1200 LPM, 30 Mtr Head= 1 No. Panel board for 5 nos pump set
15Supplying erection, testing of fully automatic electric control panel board for following pump set complete in all respect : - 1. 300 LPM, 35 Mtr head= 2 Nos. 2. 600 LPM, 35 Mtr head = 2 Nos. 3. 1800 LPM, 35 Mtr Head= 1 No. for Panel board for 5 Nos pump Set
16Supplying erection, testing of fully automatic electric control panel board for following pump set complete in all respect : -1. 2800 LPM, 50 Mtr head= 2 Nos. 2. 1400 LPM, 50 Mtr head = 2 Nos. 3. 8400 LPM, 50 Mtr Head= 1 No. for Panal board for Treated effluent pump sets
17Supplying erection, testing of fully automatic electric control panel board for following pump set complete in all respect : -1. 300 LPM, 15 Mtr head= 2 Nos. 2. 600 LPM, 15 Mtr head = 2 Nos. 3. 1800 LPM, 15 Mtr Head= 1 No. For Panel board for Raw water Pump Sets
18Category: Erection charges for 100 to 200KVA pole mounting substation without poles.; Sub Category: Erection Item-Erection of T/F Earthing -2 nos.
19Provision for Dewatering of Sub Soil Water during laying of sewer line complete in all respect As per analysis of rate attached (Laying of Sewer (0.-1 Mtrs depth) In Zone-3 Node 9-10,10-11,11- 12, 12-13, 13 IPS and 38 IPS (418 Mtrs) and In zone 5 Node 6 MPS = 210 Mtrs)
20Provision for Dewatering of Sub Soil Water during execution of work at Intermediate Pumping Station Near BDandPO Office complete in all respect As per analysis of rate attached
21Provision for Dewatering of Sub Soil Water during execution of work at Intermediate Pumping Station Near Devi Lal Park complete in all respect As per analysis of rate attached for IPS at Devi Lal Park
22Provision for Dewatering of Sub Soil Water during execution of work at Intermediate Pumping Station Near Power House DHBVNL complete in all respect As per analysis of rate attached for IPS near Power House
23Provision for Dewatering of Sub Soil Water during execution of work at Intermediate Pumping Station Near Vegetable Market Mandi complete in all respect As per analysis of rate attached for IPS Near Vegetable
24Provision for Dewatering of Sub Soil Water during execution of work at MPS/STP complete in all respect As per analysis of rate attached for Dewatering AT STP (Zone -5) and Dewatering AT treated effulent sump well
25Operation and Maintenance of4.00 MLD STP, 5 Nos. IPS/MPS, Complete sewrage network of village Bhattu Kalan and Bhattu Mandi and Rising Main lines of raw sewage, treated effluent and all other works contingent thereto as per complete scope of this Agreement, (as per OandM Manual attached in Additional Document of NIT) for a period of 6 years (72 months) including One year defect libility period after three months of succesful trial run. (will be charged to the A/Mtc. Estimate.) [Oand M for Defectliabilty period (operation only)]Defect liability period @ 1.00 % of
26Operation & maintenance during 1st. year.
27Operation & maintenance during 2nd year.
28Operation & maintenance during 3rd year.
29Operation & maintenance during 4th year.
30Operation & maintenance during 5th year.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail