}

The Temporary Electrical Installation Works In The Premises Of Raiganj Polytechnic College At Raiganj , Uttar Dinajpur For Ensuing Parliamentary General Election-2024- Evm Commissioning, Strong Room & Counting, raiganj-West Bengal

Public Works Department-PWD has published The Temporary Electrical Installation Works In The Premises Of Raiganj Polytechnic College At Raiganj , Uttar Dinajpur For Ensuing Parliamentary General Election-2024- Evm Commissioning, Strong Room & Counting. Submission Date for this Tender is 02-04-2024. clocks Tenders in raiganj West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

42846063
The Temporary Electrical Installation Works In The Premises Of Raiganj Polytechnic College At Raiganj , Uttar Dinajpur For Ensuing Parliamentary General Election-2024- Evm Commissioning, Strong Room & Counting
Open Tender
Indian
West Bengal
raiganj
02-04-2024

Tender Details

The Temporary Electrical Installation Works In The Premises Of Raiganj Polytechnic College At Raiganj , Uttar Dinajpur For Ensuing Parliamentary General Election-2024- Evm Commissioning, Strong Room & Counting- 1 Distribution Wiring In 3X1.5Sqmm Single Core Stranded Pvc Cu. Wire To Light Points In Pvc Rigid Conduit Pipe On Hire Basis & Dismantling The Same ( Without Individual Control Switch ) ( Avg. Run 8 Mtr ) 2 A. For First 3 Days. 3 B. Next 3 Days. 4 Supply & Providing On Hire Basis 4 Ft, 40 Watt Single Tube Light ( Commercial Type ) / 20 Watt Led Tube Light Fitings With Necessary Tube Lamp & Replacement Of Fuse Lamp. 5 A. For First 3 Days. 6 B. Next 3 Days. 7 S & Providing 250V, 1200 / 1400 Mm, Sweep A.C. Ceiling Fan With Down Rod As Required & Dismantling The Same. 8 A. For First 3 Days. 9 B. Next 3 Days. 10 S & Providing On Hire Basis 500V, 32A / 63A Main Switch On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 11 A. For First 3 Days. 12 B. Next 3 Days. 13 S & Providing On Hire Basis 250V, Proper Rating Mcb On Wooden Plank Board Or Suitable Angleframe Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 14 A. For First 3 Days. 15 B. Next 3 Days. 16 S & Providing 250V, Sweep Air Circulator Fan & Dismantling The Same. 17 A. For First 3 Days. 18 B. Next 3 Days. 19 S & Providing On Hire Basis 500V, 4 Way Tpnmcbdb On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 20 A. For First 3 Days. 21 B. Next 3 Days. 22 S & Providing On Hire Basis 500V, ( 2+8 ) Way Spnmcbdb On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 23 A. For First 3 Days. 24 B. Next 3 Days. 25 S & Installation On Hire Basis Main Switches, Busbar, Change Over Switches Etc. On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 26 A. For First 3 Days. 27 B. Next 3 Days. 28 S & Providing On Hire Basis1.1 Kv Grade Pvc / A Al Cable Of Following Sizes Incl. Laying In Trench / Wall With Shading Arrangement Dismantling The Same & Mending Good The Damage At The End Of The Function ( With Pwd Approve Materials ) . 29 I. 3.5 Core 50 Sq. Mm. Pvc / A Cable 30 A. For First 3 Days. 31 B. Next 3 Days. 32 Ii. 3.5 Core 25 Sq. Mm. Pvc / A Cable 33 A. For First 3 Days. 34 B. Next 3 Days. 35 Iii.2 Core 4 To10 Sq. Mm. Pvc / A Cable. 36 A. For First 3 Days. 37 B. Next 3 Days. 38 Finishing The Ends Of The Following Cable By Crimping Method As To G.S. 39 A. 3.5 Core 50 Sq. Mm. Pvc / A Cable 40 B. 3.5 Core 25 Sq. Mm. Pvc / A Cable 41 S & Drawing On Hire Basis Single Core 3 X 36 / 0.3 Pvc Cu. Wire Incl. Dismantling The Same At The End Of Function. 42 A. For First 3 Days. 43 B. Next 3 Days. 44 Earthing The Installation With 50 Mm. Dia G. I. Pipe 2.5 Mtr. To 3 Mtr. Long & 6 / 8 Swg G. I. Pipe With Galvanometer, Bolts, Nuts Etc.Below The Gl On Hire Basis & Dismantling The Same. 45 A. For First 3 Days. 46 B. Next 3 Days. 47 S & Providing On Hire Basis 125 Amp Change Over Switch. 48 A. For First 3 Days. 49 B. Next 3 Days. 50 S & Providing On Hire Basis Power Plug Board Comprising 1No 15 Amps Socket With 1No 15Amps Piano Key Type Switch . 51 A. For First 3 Days. 52 B. Next 3 Days. 53 S & Installation On Hire Basis Main Switches, Busbar, Change Over Switches Etc. On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 54 A. For First 3 Days. 55 B. Next 3 Days. 56 Supply & Fixing 240 V, 25 A, Modular Type Starter ( Brand Approved By Eic ) With 25A Modular Switch Type Dp Mcb ( Ccurve ) And 4 Module Gi Modular Type Switch Board With 4 Module Top Cover Plate Flushed In Wall 57 Charges For Running Maintenance Of Entire Installation By Engaging Licensed 2 Nos. Wireman, 2 Nos Helper Etc. Round The Clock & Providing Camp Arrangement. 58 S & Providing On Hire Basis Power Plug Board Comprising 3No 5 Amps Socket With 3Nos 5Amps Piano Key Type Switch And 1 No 15 Amps Socket With 1 No 15 Ampspiano Key Type Switch. 59 A. For First 3 Days. 60 B. Next 3 Days. 61 Evm Commissioning-Dg Set. 62 S & Providing On Hire Basis 3 Phase Following D. G. Set Incl. Temporary Suitable Installation Without Fuel Oil. 63 I ) 3 Phase, 62.5 Kva Amf Control D.G. Set ) -1 Set. 64 Cost Of Hsd Oil For Running Of Dg Set. Including Carrying Charge. 65 Strong Room- Ei Works. 66 Distribution Wiring In 3X1.5Sqmm Single Core Stranded Pvc Cu. Wire To Light Points In Pvc Rigid Conduit Pipe On Hire Basis & Dismantling The Same ( Without Individual Control Switch ) 67 A. For First 3 Days. 68 B. Next 2 Days. 69 C. Next 52 Days 70 Supply & Providing On Hire Basis 4 Ft, 40 Watt Single Tube Light ( Commercial Type ) / 20 Watt Led Tube Light Fitings With Necessary Tube Lamp & Replacement Of Fuse Lamp. 71 A. For First 3 Days. 72 B. Next 2 Days. 73 C. Next 52 Days 74 S & F 10 Watt Led Lamp. ( Havells ) 75 S & Providing On Hire Basis 500V, 32A / 63A Main Switch On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 76 A. For First 3 Days. 77 B. Next 2 Days. 78 C. Next 52 Days 79 S & Providing 250V, 1200 / 1400 Mm, Sweep A.C. Ceiling Fan With Down Rod As Required & Dismantling The Same. 80 A. For First 3 Days. 81 B. Next 2 Days. 82 C. Next 52 Days 83 S & Providing On Hire Basis 250V, Proper Rating Mcb On Wooden Plank Board Or Suitable Angleframe Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 84 A. For First 3 Days. 85 B. Next 2 Days. 86 C. Next 52 Days 87 S & Providing 250V, Sweep Air Circulator Fan & Dismantling The Same. 88 A. For First 3 Days. 89 B. Next 2 Days. 90 C. Next 52 Days 91 S & Providing On Hire Basis 500V, 4 Way Tpnmcbdb On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 92 A. For First 3 Days. 93 B. Next 2 Days. 94 C. Next 52 Days 95 S & Providing On Hire Basis 500V, ( 2+8 ) Way Spnmcbdb On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 96 A. For First 3 Days. 97 B. Next 2 Days. 98 C. Next 52 Days 99 S & Installation On Hire Basis Industrial Type Panel Having Following Switches Etc. On Suitable Angle Iron Frame Incl. Providing Inter Coonection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) .Incoming: - ( A ) 500 Volt, 125 Amp. Tpnic Main Switch With Hrc Fuse - 1 ( One ) No. ( B ) 500 Volt, 200 Amp. Capacity Bus Bar Chamber With 4 Nos. Cu / Al Bar - 1 No.Outgoing: - ( A ) 500 Volt, 63 Amp. Tpnic Main Switch With Hrc Fuse - 4 ( Four ) No. ( B ) 500 Volt, 32 Amp. Tpnic Main Switch With Rewireable Type Fuses- 2 Nos. ( C ) Ryb Indicating Lamp - 3 Nos. ( D ) E. I. Danger Board - 1 No. ( E ) Volt Meter ( 0 - 600 Volt. ) With Selector Switch - 1 No. 100 A. For First 3 Days. 101 B. Next 2 Days. 102 C. Next 52 Days 103 Incoming: - ( A ) 500 Volt, 250 Amp. Tpnic Main Switch With Hrc Fuse - 1 ( One ) No. ( B ) 500 Volt, 250 Amp. Fp Change Over Switch- 1 ( One ) No. ( C ) 500 Volt, 400 Amp. Capacity Bus Bar Chamber With 4 Nos. Cu / Al Bar - 1 No.Outgoing: - ( A ) 500 Volt, 100 Amp. Tpnic Main Switch With Hrc Fuse - 3 ( One ) No. ( B ) 500 Volt, 63 Amp. Tpnic Main Switch With Rewireable Type Fuses- 4 Nos. ( C ) Ryb Indicating Lamp - 3 Nos. ( D ) E. I. Danger Board - 1 No. ( E ) Volt Meter ( 0 - 600 Volt. ) With Selector Switch - 1 No. 104 A. For First 3 Days. 105 B. Next 2 Days. 106 C. Next 52 Days 107 S & Providing On Hire Basis1.1 Kv Grade Pvc / A Al Cable Of Following Sizes Incl. Laying In Trench / Wall With Shading Arrangement Dismantling The Same & Mending Good The Damage At The End Of The Function ( With Pwd Approve Materials ) . 108 I. 3.5 Core 50 Sq. Mm. Pvc / A Cable 109 A. For First 3 Days. 110 B. Next 2 Days. 111 C. Next 52 Days 112 Ii. 3.5 Core 25 Sq. Mm. Pvc / A Cable 113 A. For First 3 Days. 114 B. Next 2 Days. 115 C. Next 52 Days 116 Iii.2 Core 4 To10 Sq. Mm. Pvc / A Cable. 117 A. For First 3 Days. 118 B. Next 2 Days. 119 C. Next 52 Days 120 Finishing The Ends Of The Following Cable By Crimping Method As To G.S. 121 A. 3.5 Core 50 Sq. Mm. Pvc / A Cable 122 B. 3.5 Core 25 Sq. Mm. Pvc / A Cable 123 C. For 2 Core 6 / 10 Sqmm. 124 S & Providing On Hire Basis 400 / 250 Watt Metal Hallide Fittings With Necessary Clamping Arrangement To Be Fixed On St Pole / Wall Incl. Gear Box & Replacement Of Fuse Lamp. 125 A. For First 3 Days. 126 B. Next 2 Days. 127 C. Next 52 Days 128 S & Providing On Hire Basis 1000 / 500 Watt Halogen Fittings With Necessary Clamping Arrangement To Be Fixed On St Pole / Wall & Replacement Of Fuse Lamp. 129 A. For First 3 Days. 130 B. Next 2 Days. 131 C. Next 52 Days 132 S & Drawing On Hire Basis Single Core 3 X 36 / 0.3 Pvc Cu. Wire Incl. Dismantling The Same At The End Of Function. 133 A. For First 3 Days. 134 B. Next 2 Days. 135 C. Next 52 Days 136 Earthing The Installation With 50 Mm. Dia G. I. Pipe 2.5 Mtr. To 3 Mtr. Long & 6 / 8 Swg G. I. Pipe With Galvanometer, Bolts, Nuts Etc.Below The Gl On Hire Basis & Dismantling The Same. 137 A. For First 3 Days. 138 B. Next 2 Days. 139 C. Next 52 Days 140 S & Providing On Hire Basis 125 Amp Change Over Switch. 141 A. For First 3 Days. 142 B. Next 2 Days. 143 C. Next 52 Days 144 S & Providing On Hire Basis Power Plug Board Comprising 1No 15 Amps Socket With 1No 15Amps Piano Key Type Switch . 145 A. For First 3 Days. 146 B. Next 2 Days. 147 C. Next 52 Days 148 S & Providing 240 Volt, 900Va Digital Display Inverter ( Make-Microtek ) With 200 Ah Battery ( Make-Exide ) . 149 Charges For Running Maintenance Of Entire Installation By Engaging Licensed 2 Nos. Wireman, 2 Nos Helper Etc. Round The Clock & Providing Camp Arrangement. 150 S & Providing On Hire Basis Power Plug Board Comprising 3No 5 Amps Socket With 3Nos 5Amps Piano Key Type Switch And 1 No 15 Amps Socket With 1 No 15 Ampspiano Key Type Switch. 151 A. For First 3 Days. 152 B. Next 2 Days. 153 C. Next 52 Days 154 Strong Room- Dg Set. 155 S & Providing On Hire Basis 3 Phase Following D. G. Set Incl. Temporary Suitable Installation Without Fuel Oil. 156 I ) 3 Phase, 40 Kva Amf Control D.G. Set -1 Set. 157 Cost Of Hsd Oil For Running Of Dg Set. Including Carrying Charge. 158 Transportation Charges, Incl. Loading & Unloading Of D.G Set & Providing Operator For Smooth Running Of The Same As Per Direction Of Eic ( 1 Nos. D.G Sets Of Capacity In Separate Truck ) . 159 Counting- Ei Works. 160 Distribution Wiring In 3X1.5Sqmm Single Core Stranded Pvc Cu. Wire To Light Points In Pvc Rigid Conduit Pipe On Hire Basis & Dismantling The Same ( Without Individual Control Switch ) ( Avg. Run 8 Mtr ) 161 A. For First 3 Days. 162 Supply & Providing On Hire Basis 4 Ft, 40 Watt Single Tube Light ( Commercial Type ) / 20 Watt Led Tube Light Fitings With Necessary Tube Lamp & Replacement Of Fuse Lamp. 163 A. For First 3 Days. 164 S & Providing 250V, 1200 / 1400 Mm, Sweep A.C. Ceiling Fan With Down Rod As Required & Dismantling The Same. 165 A. For First 3 Days. 166 S & Providing On Hire Basis 500V, 32A / 63A Main Switch On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 167 A. For First 3 Days. 168 S & Providing On Hire Basis 250V, Proper Rating Mcb On Wooden Plank Board Or Suitable Angleframe Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 169 A. For First 3 Days. 170 S & Providing 250V, Sweep Air Circulator Fan & Dismantling The Same. 171 A. For First 3 Days. 172 S & Providing On Hire Basis 500V, 4 Way Tpnmcbdb On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 173 A. For First 3 Days. 174 S & Providing On Hire Basis 500V, ( 2+8 ) Way Spnmcbdb On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 175 A. For First 3 Days. 176 S & Installation On Hire Basis Main Switches, Busbar, Change Over Switches Etc. On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 177 A. For First 3 Days. 178 S & Providing On Hire Basis1.1 Kv Grade Pvc / A Al Cable Of Following Sizes Incl. Laying In Trench / Wall With Shading Arrangement Dismantling The Same & Mending Good The Damage At The End Of The Function ( With Pwd Approve Materials ) . 179 I. 3.5 Core 50 Sq. Mm. Pvc / A Cable 180 A. For First 3 Days. 181 Ii. 3.5 Core 25 Sq. Mm. Pvc / A Cable 182 A. For First 3 Days. 183 Iii.2 Core 4 To10 Sq. Mm. Pvc / A Cable. 184 A. For First 3 Days. 185 Finishing The Ends Of The Following Cable By Crimping Method As To G.S. 186 A. 3.5 Core 50 Sq. Mm. Pvc / A Cable 187 B. 3.5 Core 25 Sq. Mm. Pvc / A Cable 188 S & Drawing On Hire Basis Single Core 3 X 36 / 0.3 Pvc Cu. Wire Incl. Dismantling The Same At The End Of Function. 189 A. For First 3 Days. 190 Earthing The Installation With 50 Mm. Dia G. I. Pipe 2.5 Mtr. To 3 Mtr. Long & 6 / 8 Swg G. I. Pipe With Galvanometer, Bolts, Nuts Etc.Below The Gl On Hire Basis & Dismantling The Same. 191 A. For First 3 Days. 192 S & Providing On Hire Basis 125 Amp Change Over Switch. 193 A. For First 3 Days. 194 S & Providing On Hire Basis Power Plug Board Comprising 1No 15 Amps Socket With 1No 15Amps Piano Key Type Switch . 195 A. For First 3 Days. 196 S & Installation On Hire Basis Main Switches, Busbar, Change Over Switches Etc. On Wooden Plank Board Or Suitable Angle Iron Frame Incl. Providing Inter Connection, Socketing, Earthing Attachment Etc. & Dismantling The Same At The End Of The Function ( With Pwd Approve Materials ) . 197 A. For First 3 Days. 198 Charges For Running Maintenance Of Entire Installation By Engaging Licensed 2 Nos. Wireman, 2 Nos Helper Etc. Round The Clock & Providing Camp Arrangement. 199 S & Providing On Hire Basis Power Plug Board Comprising 3No 5 Amps Socket With 3Nos 5Amps Piano Key Type Switch And 1 No 15 Amps Socket With 1 No 15 Ampspiano Key Type Switch. 200 A. For First 3 Days. 201 Counting- Dg Set. 202 S & Providing On Hire Basis 3 Phase Following D. G. Set Incl. Temporary Suitable Installation Without Fuel Oil. 203 I ) 3 Phase, 62.5 Kva Amf Control D.G. Set ) -1 Set. 204 Transportation Charges, Incl. Loading & Unloading Of D.G Set & Providing Operator For Smooth Running Of The Same As Per Direction Of Eic ( 1 Nos. D.G Sets Of Capacity In Separate Truck ) 205 Cost Of Hsd Oil For Running Of Dg Set. Including Carrying Charge. 206 The Rates To Be Quoted By All The Bidders Should Be Inclusive Of All Taxes And Duties Including Gst And Lwc.

Key Value

Document Fees
Refer document
EMD
INR 28640.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail