}

Surveying, Soil Investigation, Design And Supply Of All Materials, Labour, T&P Etc. Complete Required For Completion Of Following Works Of “Nagar Palika Parishad Kasganj Water Supply Scheme”:I) Construction Of Over Head Tank,Pump House, Boundary Wall With, kasganj-Uttar Pradesh

Uttar Pradesh Jal Nigam-UPJN has published Surveying, Soil Investigation, Design And Supply Of All Materials, Labour, T&P Etc. Complete Required For Completion Of Following Works Of “Nagar Palika Parishad Kasganj Water Supply Scheme”:I) Construction Of Over Head Tank,Pump House, Boundary Wall With. Submission Date for this Tender is 30-04-2024. Tube Well Tenders in kasganj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42843793
Corrigendum : Surveying, Soil Investigation, Design And Supply Of All Materials, Labour, T&P Etc. Complete Required For Completion Of Following Works Of “Nagar Palika Parishad Kasganj Water Supply Scheme”:I) Construction Of Over Head Tank,Pump House, Boundary Wall With
Open Tender
Indian
Uttar Pradesh
kasganj
30-04-2024

Tender Details

Surveying, Soil Investigation, Design And Supply Of All Materials, Labour, T&P Etc. Complete Required For Completion Of Following Works Of “Nagar Palika Parishad Kasganj Water Supply Scheme”:I ) Construction Of Over Head Tank, Pump House, Boundary Wall With Gate, Staff Quarter, Lcs Room, Site Development, Approach Road, Repairing Of Over Head Tank & Cwr Cum Pump House.Ii ) Laying & Jointing Of Rising Main, Water Supply Distribution Network, House Connections.Iii ) Construction Of Tube Wells Including Plc Scada And Automation Of All Tube Wells & Oht As Per Specifications In Tender Document Complete In All Respectthe Scope Of Work Includes Commissioning, Testing, Trial & Run, Defect Liabilities And Handing Over The Complete Works Of “Nagar Palika Parishad Kasganj Water Supply Scheme” With Its Appurtenant Works To Nagar Palika Parishad Kasganj, Distt. Kasganj, ( U.P. )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Mar-2024 CORRIGENDUM FOR DATE EXTENSION Date 02-04-2024
2 03-Apr-2024 REVISE DATE AND TIME OF SUBMISSION OF E BID Date 15-04-2024
3 15-Apr-2024 REVISED DATE AND TIME OF SUBMISSION OF BID Date 22-04-2024
4 22-Apr-2024 REVISED DATE AND TIME OF BID SUBMISSION Date 30-04-2024

Key Value

Document Fees
INR 23600 /-
EMD
INR 2216000.0 /-
Tender Value
INR 22.15 Crore /-

BOQ Items

NSurveying, Soil investigation, Design and Supply of all materials, labour, T&P etc. complete required for completion of following works of “Nagar Palika Parishad Kasganj Water Supply Scheme”: i) Construction of Over Head Tank,Pump house, Boundary wall with gate, Staff quarter, LCS Room, Site Development, Approach Road, Repairing of Over Head Tank & CWR Cum Pump House. ii) Laying & Jointing of Rising Main, Water Supply Distribution Network, House Connections. iii) Construction of Tube Wells including PLC SCADA and automation of all Tube Wells & OHT as per specifications in tender document complete in all respect The scope of work includes commissioning, testing, trial & run, defect liabilities and handing over the complete works of “Nagar Palika Parishad Kasganj Water Supply Scheme” with its appurtenant works to Nagar Palika Parishad Kasganj, Distt. Kasganj, (U.P.)
Sl. No. Item Description
1CIVIL WORKS
2ESTIMATE  FOR PUMP HOUSE IN ZONE
3Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (1.8x1.2x3.0)m as per departmental type design and drawing (drawingno-D-2)andasperthe specificationsforcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in - charge.
4Rebore tubewell platform and existing pump house plaster, painting & Pointing etc. completed.
5Rising Main
6Supply of ISI mark DI K-7/K-9 S&S pipes & specials (push on joints) of following class and diameters inclusive of jointing material (Rubber gasket of EPDM Quality) including supply & fiing of specials with all statutory duties and taxes, third party inspection charges, transit insurance, freight, transportation to store / site of work, unloading. stacking etc. complete as directed by Engineer-in-charge.
7150mm dia D.I Class- k9
8200mm dia D.I Class- k7
9200mm dia D.I Class- k9
10250mm dia D.I Class- k7
11Excavation Work
12Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer -in -charge.
13ordinary soil
14Valve Chamber
15Supply of following size of D.I.. D/F sluice valves as per I.S. 780-1960 tested to 10 Kg/Sq.m fixing in pipe line trenches, jointing and testing complete.
16150mm dia D.I Class- k9
17200 MM dia D.I CLASS- K9
18250 mm dia D.I Class- k9
19Supply of all materials, labour T&P and construct masonary type sluice valve chamber.
20Carting, laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials, labour and T&P testing etc. complete.
21150mm dia D.I Class- k9
22200mm dia D.I Class- k7
23200mm dia D.I Class- k9
24250mm dia D.I Class- k7
25Carting, laying and jointing of the following sizes of sluice valveinto the trenches including cost of all jointing materials, labour and T&P testing etc. complete.
26150mm dia D.I Class- k9
27200mm dia D.I Class -k9
28250mm dia D.I Class- k9
29Dismantling and reinstatement of following type of road surfaces for laying of pipe line including sorting out of serviceable material and disposal of unserviceable materials.
30Dismantling of Interlocking Road
31Reinstatment of Interlocking Road (with 40% new tiles and 60% used old tiles)
32Dismantling of C.C. Road
33Reinstatment of C.C. Road
34Dismantling Bituminous surface
35Reinstatement Bituminous surface
36Dismantling of BOE Road
37Reinstatement of BOE road
38R.C.C Overhead Tank
39Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging min 0.6m above ground level with main components, soil testing and assuming bearingcapacity of soil as 8 MT, including cost of supply of design and drawings. All the water retaining components of OHT shall be casted in M-30 grade cement concrete and minimum grade of concrete of foundation and staging should be M-25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456 Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure and including 1M wide RCC doglegged staircase with separate coloumns, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia,Ultra Sonic Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309-1969 and ISS 3013-1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet(300mm), outlet(300mm), overflow and washout as per latest / relevant I.S. specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.- 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats.
401200 Kl /18M Staging
411200 Kl /16M Staging
421100 Kl /20M Staging
43Testing Bearing Capicity of soil.
44Repairing of 750 kl /19 m staging over head tank
45Repairing of 2100 kl cwr cum pump house
46Distribution System
47Supply of High Density Polyethylene Pipes & electro-fusion specials (HDPE (PN-6)/PE-100), confirming to IS 4984 / 14151 / 12786 / 13488 (and other related I.S. codes) in coils / standard lengths with necessary jointing material like electro-fusioncoupler for Joints/Junctions , flanged joint, including all statutory duties and taxes, third party inspection charges, transit insurance, freight, transportation to store / site of work, unloading & stacking the same in covered shade duly protecting from sunrays & rains etc. complete as directed by Engineer-in-charge.
48HDPE PIPE PE-100, PN-6
4990 mm dia
50110 mm dia
51125 mm dia
52140 mm dia
53160 mm dia
54D.I. K-7 Pipe
55200 mm dia
56250 mm dia
57300 mm dia
58350 mm dia
59400 mm dia
60Carting laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials, labour and T&P testing etc. complete.
61HDPE PIPE PE-100, PN-6
6290 mm dia
63110 mm dia
64125 mm dia
65140 mm dia
66160 mm dia
67D.I. K-7 Pipe
68200 mm dia
69250 mm dia
70300 mm dia
71350 mm dia
72400 mm dia
73Distribution System - Pipeline Excavation
74Distribution System - Connections
75Provision for Single Tap making ferrule house connection in 90 to 160 mm dia distribution main with fixing of saddle pieces, connection fittings, GM ferrule of 15mm dia including brass tape with welded, 20mm dia (OD) HDPE pipe (12.5 kg/cm2) and 20 mm dia (OD) G.I. pipe class B upto house holder also including excavation of trenches, supply of all fittings maerials, labour, T&P etc. all work complete but excluding dismantling and reinstatement of all type roads as per direction of engineer incharge.
76House service connections
77For 90mmto 110mm dia
78For 125mm to 160mm dia
79For 180mm to 250mm dia
80For 300mm dia
81For 350mm to 500mm dia
82Sluice valve chamber (masonry Type) - dia upto 200 mm - 1000 (L) x 1200 (W) x 1300 (H) mm
83Sluice valve chamber (surface box Type)
84Sluice valve chamber (surface box Type) - Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm)
85Air Valve Chamber 350 (L) x 350 (W) x 500 (H) mm
86D.I.. D/F Sluice/Scour valves as per I.S. 780 suitable for a working pressure of 10 Kg/Sqm.
87Sluice valve - 350 mm dia
88Sluice valve - 300 mm dia
89Sluice valve - 250 mm dia
90Sluice valve - 200 mm dia
91Sluice valve - 150 mm dia
92Sluice valve - 125 mm dia
93Sluice valve - 100 mm dia
94Sluice valve - 80 mm dia
95Scour Valve
96Scour valve - 80 mm dia
97Air valve 20 mm dia
98Carting from store to site of work, lowering, fixing and jointing of following fittings in trenches.
99D.I. Sluice valve
100Sluice valve - 350 mm dia
101Sluice valve - 300 mm dia
102Sluice valve - 250 mm dia
103Sluice valve - 200 mm dia
104Sluice valve - 150 mm dia
105Sluice valve - 125 mm dia
106Sluice valve - 100 mm dia
107Sluice valve - 80 mm dia
108Scour Valve
109Scour valve - 80 mm dia
110Air valve 20 mm dia
111Construction of 1.5 m high and 230 mm thick boundary wall with 300 mmx300 mm thick pillar made in Brick masonry in 1 cement and 4coarse sand mortar, the spacing between two pillar should not be more than 3.5m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in - charge. (Drawing No.D-1)
112Boundary Wall (for Campus Area)
113Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm th. around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laid down in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge.
114MS Gate
115ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer -in -charge.
116Inter Locking Pavement for Approach Road
117Drain for campus
118Construction of LCS ROOM
119Provide all materials labour, T&P etc. and construct single room staff quarter / office room at water works site identified by the Engineer-in-charge as per department type design and drawing and specifications of civil works laid down in the bid document, includingallmaterial labour,T&Petccompleteforproper completion of work as per instructions of Engineer -in -charge. (Drawing No.D-7) Extra depth for Site conditions to be added
120STAFF QUARTER
121E&M WORKS
122Construction ofTW No 1 (Rebore) of Zone 1C
123Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc.
124Transportation, Erection and Dismantling of Rig Machine
125Drilling by RC/DC Rig Machine 600 mm dia
1260 to 65 mtr. deep
12765 to 100 mtr. deep 500 mm dia
128100 to 130 mtr. 500 mm dia
129Tubewell Assembly
130M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect.
131300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.
132200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.
133Supply of pea gravel
134Logging of bore hole by departmental / approved electric logger
135Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect.
136Lowering of 300mm dia pipe from GL to 60m deep BGL.
137Lowering of 200mm dia pipe from 60 to 100m deep BGL.
138Lowering of 200mm dia pipe from 100 to 120m deep BGL.
139Development of Tubewell by compressor
140Transportation, Installation and Dismantling of 250 PSI Compressor
141Development of Tubewell by Adequate Capacity Air compressor
142Development of Tubewell by O.P. Unit
143Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test.
144Development of Tubewell by Adequate Capacity by O.P. Unit
145Chemical and Bacterological test of water sample from depaprtmental/ approved lab
146Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident.
147PUMPING PLANTfor Zone-1C, Tw No-1(Rebore)& TW No- 2(Existing)
148For TW No 1 (Rebore)
149SITC of Submersible pump setof Discharge1200 lpm at 57m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (Head, discharge & HP are tantitive may vary as per site condition)
15025 H.P. or above as per site condition.
1513 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
152Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
1534 x 16 sq. mm Al. cable
154Automatic chlorination system compactable to SCADA system
155Soft starter with RS-485 port-400V Classminimum 22 Kw rating or above as per site condition
156Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition
157Motor operated actuator with sluice valve 150mm Sluice Valve
158CE & UL certified Inteligent Smart Energy Meter
159CE & UL certified Electro magnatice flow Meter 150mm size
160CE & UL certified hydro static type sub soil water level transmitter for tubewell.
161CE & UL certified pressure transmitter
162CE & UL certified Surge protector 3 phase at main switch.
163Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
164Installation, commissioning & testing for one tubewell / OHT
165For Tw No 2 (Existing)
166SITC of Submersible pump set of Discharge 1100 lpm at 58 m Head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset,Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, discharge & HP are tantitive may vary as per site condition)
16725 H.P. or above as per site condition.
1683 Mtr. long heavy duty size 150 mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
169Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
1704 x 16 sq. mm Al. cable
171Automatic chlorination system compactable to SCADA system
172Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition
173Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition
174Motor operated actuator with sluice valve 150 mm Sluice Valve
175CE & UL certified Inteligent Smart Energy Meter
176CE & UL certified Electro magnatice flow Meter 150mm size
177CE & UL certified hydro static type sub soil water level transmitter for tubewell.
178CE & UL certified pressure transmitter
179CE & UL certified Surge protector 3 phase at main switch.
180Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
181Installation, commissioning & testing for one tubewell / OHT
182SCADA Automation of PUMPING PLANTat Zone-01C, TW No-1(Rebore) & T.W. No 2 (Existing)
183SCADA Automation Items
184CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x2)
185G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges (1x2)
186CE & UL certified 7" HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. (1x2)
187Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x2)
188Trial run for 03 months period for each tubewell through SCADA (1x2)
189TRIAL &RUN of Pumping Plant of Tw 1(Rebore)& 2(Existing) of Zone 1C
19003 Month operation & maintenance includingStaff & chlorine.
191Construction of TW No 1 & 3 of Zone-1 D
192Drilling of borehole for Tubewell contruction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc.
193Transportation, Erection and Dismantling of Rig Machine
194Drilling by RC/DC Rig Machine 600 mm dia
1950 to 65 mtr. deep (65x2)
19665 to 100 mtr. deep 500 mm dia (35x2)
197100 to 130 mtr. 500 mm dia (30x2)
198Tubewell Assembly
199M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect.
200300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. (60.5x2)
201200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. (60x2)
202Supply of pea gravel (38.22x2)
203Logging of bore hole by departmental / approved electric logger.
204Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect.
205Lowering of 300mm dia pipe from GL to 60m deep BGL. (60x2)
206Lowering of 200mm dia pipe from 60 to 100m deep BGL. (60x2)
207Lowering of 200mm dia pipe from 100 to 120m deep BGL. (20x2)
208Development of Tubewell by compressor
209Transportation, Installation and Dismantling of 250 PSI Compressor (1x2)
210Development of Tubewell by Adequate Capacity Air compressor (40x2)
211Development of Tubewell by O.P. Unit
212Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test. (1x2)
213Development of Tubewell by Adequate Capacity by O.P. Unit (80x2)
214Chemical and Bacterological test of water sample from depaprtmental/ approved lab. (1x2) Note- it done by department.
215Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. (1x2)
216PUMPING PLANTfor Zone-1D
217For TW No 1 & 3
218SITC of Submersible pump set of Discharge 1200 lpm at 35 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, Discharge & HP are tantative may vary as per site condition)
21915 H.P. or above as per site condititon (1x2)
2203 Mtr. long heavy duty size 150 mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) (2x2)
221Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. (36x2)
2224 x 16 sq. mm Al. cable (50x2)
223Automatic chlorination system compactable to SCADA system (1x2)
224Soft starter with RS-485 port-400V Class minimum15 Kw rating or above as per site condition (1x2)
225Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition (1x2)
226Motor operated actuator with sluice valve 150mm Sluice Valve(2x2)
227CE & UL certified Inteligent Smart Energy Meter (1x2)
228CE & UL certified Electro magnatice flow Meter 150 mm size (1x2)
229CE & UL certified hydro static type sub soil water level transmitter for tubewell. (1x2)
230CE & UL certified pressure transmitter (1x2)
231CE & UL certified Surge protector 3 phase at main switch(1x2)
232Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT(1x2)
233Installation, commissioning & testing for one tubewell / OHT (1x2)
234For TW No 2 (Existing)
235SITC of Submersible pump set of Discharge 1000 lpm at 35 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (head , discharge & HP are tantative may vary as per site condition)
23612.5 H.P. or above as per site condition
2373 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
238Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
2394 x 16 sq. mm Al. cable
240Automatic chlorination system compactable to SCADA system
241Soft starter with RS-485 port-400V Class minimum15 Kw rating or above as per site condition
242Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)or above as per site condition
243Motor operated actuator with sluice valve 150mm Sluice Valve
244CE & UL certified Inteligent Smart Energy Meter
245CE & UL certified Electro magnatice flow Meter 150mm size
246CE & UL certified hydro static type sub soil water level transmitter for tubewell.
247CE & UL certified pressure transmitter
248CE & UL certified Surge protector 3 phase at main switch.
249Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
250Installation, commissioning & testing for one tubewell / OHT
251CWR of Zone 1D
252Pump :- SupplyofHorizontal pump set with pump fitted with gland packing, MS fabricated base frame for both Motor & Pump, CI coupling (Spacer type), Steel coupling gurad.MOC: casing - Cast Iron FG 260, impeller - ASTMA A 743 Gr. CF8M, Shaft - AISI 410 a) Discharge : 1800 lpm x 27 m. head Electric Motor : - Supply of 4 Pole, 415 Volt, 50 Hz, 1450 RPM B3 mounting as per IE3 Standerd TEFC Motor. The motor shall besuitable to drivetheabove pumps within its whole range andof required capacity. 20 H.P.(head , discharge & HP are tantative may vary as per site condition)
253Starter :- Supplyof SCADA Compacatable Motor soft starter suitable tooperateat0.415KV+10%3 phase, 50Hz. A.C.supply andtocontroltheabove motors. It shallcompriseofall protection devicesas per latest I.S.S. specifications. - 20 H.P. or above as per site condition - (3 Nos) L.T. Switchgear Panel Board :- Supply of 1 no. panelextensible typeswitchboard suitable for 0.415 KV3 phase 50 HZ. A.C. supply in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following : (a) 02no.Incoming Panelcomprisingofsuitable capacity ACB/MCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. of above required motor. (b) 6 Nos. outgoing panelsfor pumping plants. 3 Nos. Of Pump, 01 No. for Internal & External lighting, 01 no. for welding & other miscellanious work and 01 nos spare Each panelhavingsuitable capacity MCCB with ammeter and C.T.with selectorswitch,KWmeter, single phasingpreventer, capacitoretc for proper functioning for whole E&M Equipments installed in scope ofCWR.
254Servo-Stablizer 60 KVA or above as per site condition
255Power Cable :- Supply and laying of1100 V grade 3 core 16 mm2 from panel to starter and starter to motor XLPE armoured cables ofrequiredsizes with earthing material (3x30 mt) approx.
256C.I. / M.S. Fitting of Delivery pipes and specials as per details given below: 150 mm size individual delivery and 250 mm size common delivery with jointing material, Tee, bends
257Reflux Valve 150 mm
258Sluice Valve 250 mm with actuator
259Sluice Valve 150 mm with actuator
260Dismantling Joint.
261150 mm
262250 mm
263Nut Bolts and rubber packing etc.
264Supply of MS Girder for pump base etc.
265Supply of spare parts required for maintenance of all equipments.
266Direct on line type electromagnetic type flow meter of size 250 mm in common delivery ofM.S.pipelinefor measuring dischargeofpumpswithsignal transmitter device. Digitalflowindicatorshallbe installedin pump house on instrument control panel.
267Supply of SCADA CompacatableElectronic level indicator.
268Supply of electronic pressure Indicating devices SCADA Compactable.
269Tools & spanners : HT, LT megger, Tong tester, Crimping tool (manual and hydraullic)
270E.O.T. crane of 3 Tones capacity with 6 meter lift alongwith traveling trolley and girder etc.
271SCADA Compatable Chlorination System
272Erection and commissioning of above items.
273Testing : At works of pumps & other equipments
274Trial run and operation of pumping plants for one months.
275Painting of equipments with two coats.
276CE/UL approved manufacturer"s Intelligent smart energy meter with memory real time clock and 1 serial port integrated with R.T.U. as per spec mentioned in technical bid documents.
277Auto phase reversal unit -Auto phase reversal unit/ automatic transfer switch withinbuilt time delay & enclosure of SuitableAmpere rating (Confirming to I.E.C. - 60947-1 and I.E.C.- 60947-6-1)as specified in tender technical specification sheet
278CE / UL approved manufacturer’s Radartype Level Transmitter for CWR as specified in tender technical specification sheet
279CE / UL approved manufacturer’s Pressure Transmitterin each pumping delivery line as well main header line of Pump as per specifications specified in tender technical specification sheet.
280Complete cabling for ZPS including all power and control cable of all equipments at ZPS and OHTs.
28102 nos(1W+1S) monoblock /submersible single phase 50 hz 3hp pumpset capable of drain out waste water of dry well with starter and all fittings arrangemnent (pipe,tee bend etc) required for complete disposal of waste water as required
282Security Surveillance IP Camera with Recorer
283Trial Run of CWR through SCADA for 3 Month
284Internal & External Electrification of CWR Zone 1D (Lighting of bulding and campus)
285Supply,installation and fixing of
286M.S tubler poles 9.5 m height
287Twin tube light covered
288450 mm dia exhaust fan
2891200 mm ceiling fan
290250 watt flood light
29115 amp power plug point
2925 Amp power plug point
293Supply of tube light LED etc.
294Wiring of plant in copper conductor
295Supply &laying of 4x 16 sq mm Copper conductor cable
296SCADA Automation Items for Tubewells
297CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (3x1)
298G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(3x1)
299CE & UL certified 7" HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(3x1)
300Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (3x1)
301Trial run for 03 months period for each tubewell through SCADA(3x1)
302Automation of CWR
303CE & UL approved manufacturer"s RTU/PLC suitable to communicate with GSM based modem unit with CPU and power supply with analog and digital parameter and features as specified for each tubewell & CWR to store and transmit data on GSM backbone. RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification sheet including Control panel with IP 54 protection industrial grade for all equipments (Separate for control (24 V) and power equipments) with CE / UL approved manufacturer’s Surge protector for Control Panel and CE / UL approved manufacturer’s 7" HMItouchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters as specified in tender technical specification sheet .(Suitable for 03 nos. CWR Motor.)
304GSM/GPRS based wireless communicationmodem for RTU/PLC capable to transfer and gather data from remote sites to control stations, all accessories included with signal enhancer anteena made for pumping plant as specified in tender technical specification sheet.
305CE/UL surge protector 3 phase at main switch.
306CE/UL Certified 7" HMI Touchscreen suitable to commuticate with PLC / RTU for loac display and control of process parameter. (Suitable to display data of all 03 motors)
307Control Panel with IP54 protection Indsutrial grade for all equipmets seprate for control (24 Volt) and power equipment. (Suitable for all 03 motors)
308Installation, Testing & Commissioning
309Trail Run of CWR Zone 1D
31003 Month Trial Run of 03 nos Tw & CWR including staff & liquid chlorine.
311Zone-1 E
312Construction of Tubewell(300X200 size) TW No 2 (Rebore) & TW No 3
313Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc.
314Transportation, Erection and Dismantling of Rig Machine (1x2)
315Drilling by RC/DC Rig Machine 600 mm dia
3160 to 65 mtr. deep (65x2)
31765 to 100 mtr. deep 500 mm dia(35x2)
318100 to 130 mtr. 500 mm dia(30x2)
319Tubewell Assembly
320M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect.
321300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.(60.5x2)
322200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.(60x2)
323Supply of pea gravel (38.22x2)
324Logging of bore hole by departmental / approved electric logger.(1x2)
325Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect.
326Lowering of 300mm dia pipe from GL to 60m deep BGL. (60x2)
327Lowering of 200mm dia pipe from 60 to 100m deep BGL. (40x2)
328Lowering of 200mm dia pipe from 100 to 120m deep BGL.(20x2)
329Development of Tubewell by compressor
330Transportation, Installation and Dismantling of 250/350 PSI Compressor (1x2)
331Development of Tubewell by Adequate Capacity Air compressor (40x2)
332Development of Tubewell by O.P. Unit
333Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test.
334Development of Tubewell by Adequate Capacity by O.P. Unit
335Chemical and Bacterological test of water sample from depaprtmental/ approved lab.
336Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident.
337Pumping Plant tw Equipment at Existing Tubewell Zone 1E,TW No 1
338Servo-Stablizer 40 KVA or above as per site condition
339Automatic chlorination system compactable to SCADA system
340Soft starter with RS-485 port-400V Class minimum 22 Kw rating or as per site condition
341Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)
342Motor operated actuator for Existing Sluice Valve (size as per site condition)
343CE & UL certified Inteligent Smart Energy Meter
344CE & UL certified Electro magnatice flow Meter 150mm size or as per site condition
345CE & UL certified hydro static type sub soil water level transmitter for tubewell.
346CE & UL certified pressure transmitter
347CE & UL certified Surge protector 3 phase at main switch.
348Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
349Installation, commissioning & testing for one tubewell / OHT
350Pumping Plant at Zone 1E,TW No 2(Rebore)
351SITC of Submersible pump set of 1200 lpm at 55 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition)
35225 H.P. or above as per site condition.
3533 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
354Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
3554 x 16 sq. mm Al. cable
356Automatic chlorination system compactable to SCADA system
357Soft starter with RS-485 port-400V Class minimum 22 Kw rating or aboveor above as per site condition.
358Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)
359Motor operated actuator with sluice valve 150mm Sluice Valve
360CE & UL certified Inteligent Smart Energy Meter
361CE & UL certified Electro magnatice flow Meter 150mm size
362CE & UL certified hydro static type sub soil water level transmitter for tubewell.
363CE & UL certified pressure transmitter
364CE & UL certified Surge protector 3 phase at main switch.
365Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
366Installation, commissioning & testing for one tubewell / OHT
367Pumping Plant at Zone 1E,TW No 3
368SITC of Submersible pump set of 839 lpm at 55 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition)
36917.5 H.P. or above as per site condition.
3703 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
371Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
3724 x 16 sq. mm Al. cable
373Automatic chlorination system compactable to SCADA system
374Soft starter with RS-485 port-400V Class minimum 15 Kw rating or above as per site condition.
375Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition.
376Motor operated actuator with sluice valve 100mm Sluice Valve
377CE & UL certified Inteligent Smart Energy Meter
378CE & UL certified Electro magnatice flow Meter 100mm size
379CE & UL certified hydro static type sub soil water level transmitter for tubewell.
380CE & UL certified pressure transmitter
381CE & UL certified Surge protector 3 phase at main switch.
382Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
383Installation, commissioning & testing for one tubewell / OHT
384SCADA Automation of Zone 1E TW No 1 (Existing), T.W. No 2 (Rebore) & T.W. No 3
385CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x3)
386G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x3)
387CE & UL certified 7" HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(1x3)
388Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x3)
389Trial run for 03 months period for 03 nos of tubewell through SCADA(1x3)
390Trial run of Zone 1E
39103 Month Trial run of tubewells of Zone 1E with staff at tw 2(Rebore)&3 and liquid chlorine consumption on all 03 tubewells.
392Zone-3
393Construction of Tubewell of Zone 3 T.W. No 3
394Drilling of borehole for Tubewell contruction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc.
395Transportation, Erection and Dismantling of Rig Machine
396Drilling by RC/DC Rig Machine 500 mm dia
3970 to 65 mtr. deep
39865 to 100 mtr. deep 450 mm dia
399100 to 130 mtr. 450 mm dia
400Tubewell Assembly
401M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect.
402200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.
403150 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.
404Supply of pea gravel
405Logging of bore hole by departmental / approved electric logger.
406Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect.
407Lowering of 200mm dia pipe from GL to 60m deep BGL.
408Lowering of 150mm dia pipe from 60 to 100m deep BGL.
409Lowering of 150mm dia pipe from 100 to 150m deep BGL.
410Development of Tubewell by compressor
411Transportation, Installation and Dismantling of 250 PSI Compressor
412Development of Tubewell by Adequate Capacity Air compressor
413Development of Tubewell by O.P. Unit
414Transportation, Installation and Dismantling of1 Cusec O.P. Unit & Yield Test.
415Development of Tubewell by Adequate Capacity by O.P. Unit
416Chemical and Bacterological test of water sample from depaprtmental/ approved lab.
417Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident.
418E/M equipmenton Existing Pumping Plant at Tubewell of Zone 3 TW No 1 & 2
419Servo-Stablizer minimum 40 KVA or above or as per site condition. (1x2)
420Automatic chlorination system compactable to SCADA system (1x2)
421Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition.
422Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)or above as per site condition. (1x2)
423Motor operated actuator for Existing Sluice Valve (1x2)
424CE & UL certified Inteligent Smart Energy Meter (1x2)
425CE & UL certified Electro magnatice flow Meter 150mm size (1x2)
426CE & UL certified hydro static type sub soil water level transmitter for tubewell. (1x2)
427CE & UL certified pressure transmitter(1x2)
428CE & UL certified Surge protector 3 phase at main switch(1x2)
429Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT(1x2)
430Installation, commissioning & testing for one tubewell / OHT (1x2)
431Pumping Plant at Zone 3 TW No 3
432SITC of Submersible pump set of 492 lpm,59 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, Discharge & HPare tantative may vary as per site condition )
43312.5 H.P. or above as per site condition
4343 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
435Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
4364 x 16 sq. mm Al. cable
437Automatic chlorination system compactable to SCADA system
438Soft starter with RS-485 port-400V Class minimum 15 Kw rating or above
439Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)
440Motor operated actuator with sluice valve 100mm Sluice Valve
441CE & UL certified Inteligent Smart Energy Meter
442CE & UL certified Electro magnatice flow Meter 100mm size
443CE & UL certified hydro static type sub soil water level transmitter for tubewell.
444CE & UL certified pressure transmitter
445CE & UL certified Surge protector 3 phase at main switch.
446Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
447Installation, commissioning & testing for one tubewell / OHT
448SCADA Automation Items
449CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x3)
450G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x3)
451CE & UL certified 7" HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. (1x3)
452Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x3)
453Trial run for 03 months period for 03 nos of tubewell through SCADA(1x3)
454Trial run of Zone 3 TW No 1 & 2 (Existing) & TW No 3
45503 Month Trial run of tubewells of Zone 3 with staff at tw 3 and liquid chlorine consumption on all 03 tubewells.
456Zone-4
457Construction of Tubewell of Zone 4 TW No 1 (Rebore)
458Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc.
459Transportation, Erection and Dismantling of Rig Machine
460Drilling by RC/DC Rig Machine 500 mm dia
4610 to 65 mtr. deep
46265 to 100 mtr. deep 450 mm dia
463100 to 130 mtr. 450 mm dia
464Tubewell Assembly
465M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structer etc. As required & as per typed design complete in all respect.
466200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.
467150 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.
468Supply of pea gravel
469Logging of bore hole by departmental / approved electric logger.
470Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect.
471Lowering of 200mm dia pipe from GL to 60m deep BGL.
472Lowering of 150mm dia pipe from 60 to 100m deep BGL.
473Lowering of 150mm dia pipe from 100 to 150m deep BGL.
474Development of Tubewell by compressor
475Transportation, Installation and Dismantling of 250 PSI Compressor
476Development of Tubewell by Adequate Capacity Air compressor
477Development of Tubewell by O.P. Unit
478Transportation, Installation and Dismantling of1 Cusec O.P. Unit & Yield Test.
479Development of Tubewell by Adequate Capacity by O.P. Unit
480Chemical and Bacterological test of water sample from depaprtmental/ approved lab.
481Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident.
482Pumping plant of Zone 4 TW No 1 (Rebore)
483SITC of Submersible pump set of Discharge 600lpm ,59 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset,servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (Head, discharge & HP are tantative may vary as per site condition)
48415 H.P. or above as per site condition.
4853 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
486Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
4874 x 16 sq. mm Al. cable
488Automatic chlorination system compactable to SCADA system
489Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition.
490Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)
491Motor operated actuator with sluice valve 150mm Sluice Valve
492CE & UL certified Inteligent Smart Energy Meter
493CE & UL certified Electro magnatice flow Meter 150mm size
494CE & UL certified hydro static type sub soil water level transmitter for tubewell.
495CE & UL certified pressure transmitter
496CE & UL certified Surge protector 3 phase at main switch.
497Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
498Installation, commissioning & testing for one tubewell / OHT
499Pumping plant of Zone 4 TW No 2(Existing)
500SITC of Submersible pump set of discharge 1100 lpm ,58 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition)
50125 H.P. or above as per site condition.
5023 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos)
503Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe.
5044 x 16 sq. mm Al. cable
505Automatic chlorination system compactable to SCADA system
506Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition.
507Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)
508Motor operated actuator with sluice valve 150mm Sluice Valve
509CE & UL certified Inteligent Smart Energy Meter
510CE & UL certified Electro magnatice flow Meter 150mm size
511CE & UL certified hydro static type sub soil water level transmitter for tubewell.
512CE & UL certified pressure transmitter
513CE & UL certified Surge protector 3 phase at main switch.
514Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT
515Installation, commissioning & testing for one tubewell / OHT
516SCADA Automation Items
517CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x2)
518G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x2)
519CE & UL certified 7" HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(1x2)
520Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x2)
521Trial run for 03 months period for 02 nos of tubewell through SCADA (1x2)
522Trial run of Zone 4 T.W No 1 (Rebore) & T.W. No 2 (existing)
52303 Month Trial run of tubewells of Zone 4 with staff at tw 1(Rebore) and liquid chlorine consumption on all 02 nos of tubewells.
524OHT forZone-1C, 1D, 1E 3&4
525Motor operated actuator for Existing sluice valve onExisting OHTof 300 mm size. of Zone 1C
526Motor operated actuatorwith sluice valve on New OHTof 400 mm size. Of Zone 1D, 1E & Zone 3
527Motor operated actuator for Existing sluice valve onExisting OHT of 250 mm size. of Zone 4
528Flow Meter on OHT delivery line of size 300 mm dia for Existing OHT of Zone 1C
529Flow Meter on OHT delivery line of size 400 mm dia for New OHT of Zone 1D, 1E & Zone 3
530Flow Meter on OHT delivery line of size 250 mm dia for Existing OHT of Zone 4
531Chlorine Analyzer rnge 0-5 ppm (electrolyte with membrane cap; Type- Amperometric.
532CE/UL certified Radar type Level Transmitter for Over haead Tank for Eisting OHT of zone 1&2 and new OHT of Zone 3
533MASTER CONTROL SYSTEM (MCS)
534CE/UL & BIS Certifed industrial grade LED MONITOR with latest configuration
535(i) 65" (upto 50 Tubewells).
536Desktop/PC with i5/i7 processor for
537CE/UL Certified 5KVA UPS with batteries .
538Full development version of required TAGS SCADA Software with coustomization of sowftware for MCS as per requirement .
539CE/UL Certified master control room PLC with redundant CPU & power supply at MCS in IP54 enclouser
540CE/UL Certified Field gateway agent for transfering data from MCS to Central control room.
541GSM based wireless/Broaband/Equipment communication system for PLC capable to transfer & received data & gather data from remote sites to control satation, All accessories included signal enhancer antenna along with running expences, till DLP.
542CE/UL Certified Firewall for network protection.
543SURGE PROTECTOR FOR ETHERNET communication protection.
544CE/UL certified industrial grade Ethernet Switch.
545Mobile App Facility system architecture (industries internet based & viewed through mobile apps for increased local & Remote Visibility).
546Canon/HP or equivalent Laser Printer 1018 or equivement.
547Security Sureillance IP camera with recorder (optional)
548Installion, Commissioning & testing including required furniture, A/c etc.
549Trial run of MCS for 03 months period
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail