Tender For Restoration Of Kushinagar Distributary From Km. 0.000 To Km. 16.100 And Demarcation Of Its Canal Land In District Kushinagar, kushinagar-Uttar Pradesh

Irrigation Department has published Tender For Restoration Of Kushinagar Distributary From Km. 0.000 To Km. 16.100 And Demarcation Of Its Canal Land In District Kushinagar. Submission Date for this Tender is 16-03-2024. Canal Construction Tenders in kushinagar Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42837450
Tender For Restoration Of Kushinagar Distributary From Km. 0.000 To Km. 16.100 And Demarcation Of Its Canal Land In District Kushinagar
Open Tender
Indian
Uttar Pradesh
kushinagar
16-03-2024

Tender Details

Restoration Of Kushinagar Distributary From Km. 0.000 To Km. 16.100 And Demarcation Of Its Canal Land In District Kushinagar

Key Value

Document Fees
INR 6094 /-
EMD
INR 748000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: tuin dq"khuxj esa dq"khuxj jktokgk ds fdeh0 0-000 ls fdeh0 16-100 rd iquZLFkkiuk ,oa ugjh Hkwfe ds lhekadu dk dk;Z [LOT-03]
Sl. No. Item Description
1Earth work in excavation in foundation including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
2Centering and shuttering for RCC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of workas directed by Engineer-in-Charge as per I.D. specification.
3Laying P.C.C. 1:4:8 in foundation with cement, sonbhadra coarse sand ofFM. Not less than 2.60 and dala grit (20 mm to 40 mm.) including cost of all materials, T&P, labours and other accessories required for proper completion of work.
41st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand ofFM. Not less then 2.00, including all cost of materials,T&P and laboursand other accessories required for proper completion of work
5Providing and laying SteelReinforcement including cost of steelshaping, cutting, bending, placing in position, binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of workas directed by Engineer-in-Charge as per drawing and I.D. specification.
6Supply and Fixing of 110 mm P.V.C. Pipe for Drainage spout and weep hole including cost of all material ,labour, t&p etc. required for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
7Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material, labour, T&P required for proper completion of work. As per ID specification
8Reinforced cement concrete in 1:1:2(M-25) in all RCC work with Coarse sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size 12.5 mm to 20 mm, Mechanically mixed and properly compacted by Vibrator including cost of all materials but excluding cost of steel, labour and T&P with all leads and lift/down for proper completion of workas directed by Engineer-in-Charge as per drawing and I.D. specification.
9Struck deep Cement Pointing in 1:2 cement mortar in approved cement and coarse sand (Sonbhadra) with all lead & lift including all material, labour, T&P etc all complete.
10First class Brick soling on ramp including cost of all matterials. T&P and labours and other accessories required for proper completion of work.as directed by Engineer-in-Charge as per I.D. specification.
11Dismantling of Cement Concrete work with lime/cement mortar and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
12Supplying and Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of workas directed by Engineer-in-Charge as per I.D. specification.
13Sign board at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of work. as directed by Engineer-in-Charge as per I.D. specification.
14Earth work forback filling, making Ramp for Diversion and making jeepable service roadincluding all cost of materials,T&P and labours and other accessories required for proper completion of workas directed by Engineer-in-Charge as per I.D. specification.
15Finishing wall with Premium Acrylic Smooth exterior paint of required shade: New work (2 or more coat applied @1.67 ltr/10 sqm. over and including primimg coat of exterior primer applied @2.20kg/10 Sqm) (apex Ultima all weather coat) Asian, Berger. including supply of all materials, labour, T&P etc. for proper completion of work.
16Reinforced cement concrete in 1:1.5:3 in all RCC work with Coarse sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size 12.5 mm to 20 mm, Mechanically mixed and properly compacted by Vibrator including cost of all materials but excluding cost of steel, labour and T&P with all leads and lift/down for proper completion of workas directed by Engineer-in-Charge as per drawing and I.D. specification.
17Laying C.C. work in 1:2:4(M15) sonbhadra coarse sand ofFM. Not less then 2.00 and dala grit (12.5mm to 20mm.)including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
18Providing and Laying of LDPE Film on footing box including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
19Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
20Painting of RCC Precast boundry piller size 150x150x1650 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.
21Laying Local Sand fill in 300 mm thick for making base of concrete including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
22Filling of Joints with Bitumen including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-charge as per drawing and I.D. specification.
23Providing and Laying sepration membrane of impermeable plastic sheeting 125 micron thickfor below cc lining work inclcost of material, labour, T&Petc. proper completion of work
24Plain Cement Concrete in 1:3:6in foundation with Coarse sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 20 mm to 40 mm, Mechanically mixed, placed in foundation and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
25Jungle clearance on branch below 30 cumec distributries ,minors and drain with service road as directed by Engineer-in-Charge as per drawing and I.D. specification.
26Dismantling of old and damaged Gate and Gate parts.as directed by Engineer-in-Charge.
27Supply and fixing M.S. Channel section 100x50x8 mmfor gate as per specification Weight of Channel @ 12.10 Kg/Mtr
28Supply and fixing M.S. Angle 65x65x8 mmfor gate as per specification Weight of Angle iron @ 7.70 Kg/Mtr
29Supply and fixing M.S. Flat sheet 10 mm thickfor gate as per specification Weight of M.S. Flat sheet @ 78.50 Kg/Sqm
30Supply and fixing M.S. Black pipe 3" dia. for gate as per specification
31Providing two coat enamel paint over one coat primer on gate including all materials, labour, T&P etc complete.
32Greesing & oiling of Head regulator including cost of allmaterial, labour& T&P etc. complete (unit=01 no.)
33Erection of fabrication charges of gate and gate parts. (Material and labour.)
34Erection of Refabricated Gate / Repaired Gate. Including cost of labour t&p etc
35Providing an fixing of Bearing for gate as per specification
36Providing an fixing Housing for gate as per specification
37Providing an fixingRubber Sheet 12mm for gate as per specification
38110 mm dia HDPE rigid pressure pipe 6 kg/m2 etc. required for proper completion of work as per direction of Engineer-in-Charge.
39160 mm dia HDPE rigid pressure pipe 6 kg/m2 etc. required for proper completion of work as per direction of Engineer-in-Charge.
40Earth work in filling for restoration of the canal and tail gul section complete with proper compaction and dressing including cost of materials,labour, T&P etc
41Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&Pfor proper completion of work as directd by Engineer-in-charge as per drawing and I.D. specification.
42Writing each letter upto30 cm size including all cost of materials,T&P and labours and other accessories required for proper completion of workas directed by Engineer-in-Charge as per I.D. specification.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail