| 1 | Cleaning the overhead reservoir cap 50000 gallons to 1.0 lakh gallons (twin or single chamber) by draining the complete water and brushing the surface with iron brush and removing the complete mud/ silt and washing the complete inner surface of the tank to the entire satisfaction of Engineer in Charge and writing the date of cleaning on surface of tank with white synthetic enamelled paint on black background complete all as specified and directed.(Pump House No 8,11,3)Note:-T&P, material, labour involved in cleaning shall be arranged by the contractor without any extra cost to the department. |
| 2 | Cleaning the semi underground reservoir cap 50000gallons(at Kaluchak) by draining the complete water and brushing the surface with iron brush and removing the complete mud/ silt and and washing the complete inner surface of the tank to the entire satisfaction of Engineer in Charge and writing the date of cleaning on surface of tank with white synthetic enamelled paint on black background including covered the opening hole of tank with chicken wire mesh with wooden frame, hinges and locking arrangement complete all as directed by Engr-in-Charge.(Map No-02,Kaluchak -01)Note:T&P, material, labour involved in cleaning shall be arranged by the contractor without any extra cost to the department. |
| 3 | M& L for removing bore well column pipes upto 100 mm dia with submersible flat cable of any type and dismantling and taking up/down SUBMERSIBLE PUMP & Motor ASSEMBLY of capacity 33HP to 40HP , shifting to workshop and removing unserviceable spares, replacing with new spares such impeller, bushes distance bush, seal etc of same specifications / type / model. removing burnt copper winding from motor and rewinding with same guage and type of insulation copper conductor winding wires and insulation sheets , applying insulating varnishover the complete winding , drying up by heating , assembling back and testing for proper functionincluding necessary machining works as required , bringing back and reinstalling into the bore well complete all as specified and directed.Note: Column Pipes will be measured and paid for separately under relevant Item. |
| 4 | Description all as per item No. 3 here in before but for submersible pump& motor of capacity 15 to25 HP complete all as specified and directed. |
| 5 | Description all as per item No. 3 here in before but for submersible pump& motor of capacity up to 7.5 HP complete all as specified and directed |
| 6 | S & F MS column pipe 100 mm dia medium grade (heavy duty) flanged type incl necessary fixing MS nut, bolt, washer & gaskets\" etc incl groove for cable entry system of 3 mtr in length complete all as directed. |
| 7 | Servicing of Hemisphere fountain including cleaning of fountain nozzles, adjustment of fountain nozzles for a precision effect, cleaning of pump suction wire mesh, testing of water proof luminaries, cleaning of toughened glass and heat resistant polyester/polycarbonate filter, tightening all electrical connections of control panel etc and testing of complete fountain installed at Officer Mess Gate complete all as specified and directed. (officer Mess)(i) Any parts required to be replaced during servicing Fountain shall be measured and paid for separately under appropriate item as \"Supply only\" of this schedule. However labour element involved in replacement is deemed to be included in quoted rates against this item.(ii) Any minor repairs involved in servicing to make the Fountain functional even if notified by the Engineer in Chargeshall be carried out by the contractor without any extra cost to the department.(iii) This item will be operatedin every three month during the entire period of the contract and shall be measured separately number of times the job is carried out. |
| 8 | Description all as per srl item No. 7here in before but for Multiple jet fountain near Technical area gate and main gate,SNCO Mess |
| 9 | Supply onlyBall Fountains Nozzles Brass for Hemispherical Fountain along with repair complete all as specified and directed |
| 10 | Supply only Contactor for Pump MNX-25.Make:L&T or Equivalent in Seimens/Havells |
| 11 | Supply only Timer and Relay.Make: Cat Part No SS9414500E0 of L&T or Equivalent in Seimens/Havells |
| 12 | S&FWater Proof light Luminaire for fountains make as per existing site all as directed by Engineer In Charge |
| 13 | Supply, laying and testing PVC insulated and sheathed flat 3 core copper stranded conductor water proof submersible cable fixed to submersible monoblock pump set to starter as directed including taking out old unserviceable cable of following sizes: |
| 14 | 10 sqmm |
| 15 | 16 sqmm |
| 16 | Taking down unserviceable Aviationlight fittings from overhead reservoir and S & F of LED type Aviation obstruction light 230 volt yellow painted die-cast aluminium alloy housing, red coloured polycarbonate dome and accessories.complete with internal wiring and connected to earthing complete all as specified and directed by Engineer-in-charge. |
| 17 | Servicing / maintenance including repairs but excluding spares as required for following components of complete Altoc Dosing system installed at(a) pump house no 08 = 01 , (b)pump house no 11 = 01 , (c) pump house no 03 = 01 , (d) 256 SU Kaluchakpump house= 01 , (e) Map pump house No1 = 01 (f) swimming pool = 01 including following operations:(a)Dismantling of Altoc Dosing System complete part by part in MES yard/ workshop, cleaning of all the stationary and rotary parts,repairing to gear box and display the parts at site for inspection of Engr-in-Charge to ascertain the serviceability / unserviceability of plant and to ascertain the quantam of defects and repairs involved.(b)Transporting the defective parts to authorised dealer for repairs as decided by theEngnr-in-Charge and carrying out the needful repairs including replacement of defective unserviceable parts.(c) Assembling the Altoc Dosing System after repair/service and carrying out necessary test in presence of Engnr-in-Charge to establish functionability of the repaired plant upto the entire satisfaction of Engnr-in-Charge. |
| 18 | Note for item No:15(i) Maintenance / servicing of each Altoc Dosing System shall be measured and paid maximum twice in every month. However, in case of unserviceability of the same, the contractor shall be required to carry out the job for its maintenance any number of times as required and directed at site as a case of emergency breakdown.(ii) Any parts required to be replaced during repair / servicing of Altoc Dosing System shall be measured and paid for separately.(iii)Any minor parts required to make plant serviceable even if notified by the Engr-in-Charge shall be supplied by the firm without any extra cost to the department. |
| 19 | Supply only the following (PROVISIONAL) Items to incorproate against item No.- 15 here in before: |
| 20 | PVC Dosing head assemblywith suction and delivery adopter Make- Satya sai or equivalent as E-in-C approved list of make. |
| 21 | Weighted suction line strainer 3/8 \".Make- Satya sai or equivalent as E-in-C approved list of make. |
| 22 | 3/8 \" white suction / discharge tubing. Make- Satya sai or equivalent as E-in-C approved list of make. |
| 23 | NRV (Non Return Valvae) for delivery line Make- Satya sai or equivalent as E-in-C approved list of make. |
| 24 | Dosing agitator rod with fan ,PP coating Make- Satya sai or equivalent as E-in-C approved list of make. |
| 25 | Stater Make- Satya sai or equivalent as E-in-C approved list of make. |
| 26 | Gear oil 460 Make- Satya sai or equivalent as E-in-C approved list of make. |
| 27 | PVC NRV set with glass ball for suction and delivery adopter Make- Satya sai or equivalent as E-in-C approved list of make. |
| 28 | Rewinding of motor of Induction motor up to 1 HP capacity insulated copper wire of existing gauge and size to achieve the specified / required RPM including taking out old unserviceable winding complete all as specified and directed. |
| 29 | Material and labour for disconnecting and removing theSquirrel cage 3 phase 415 Volts, 50 Hz Induction motor offollowing capacity from its foundations/ base frame bydisconnecting electrical connections and motor couplers,taking it to workshop for repair and dismantling and opening up of MOTOR , removing burnt out winding wires complete,cleaning startor and rotor assembly, rewinding the startorwith same guage and type with insulation copper conductorwinding wires and insulation sheets , applying insulatingvarnish over the complete winding , drying up by heating ,assembling back the stator and rotor including replacementof terminal blocks and terminal bolts, nuts and washers,refixing back to its postion after getting repaired and makingall connections, carry out alignment, testing for satisfactoryfunction all as specified and as directed complete all asspecified and as directed.Note: (i) Bearings shall be measured and paid separately. |
| 30 | 10 to 15Hp Capacity |
| 31 | 5 to 7.5 Hp capacity |
| 32 | 2 Hp to 3.0Hp Capacity |
| 33 | Supply only anti friction heavy duty bearings suitable for10 to 15HP motor Make: SKF/ZKL |
| 34 | Supply only anti friction heavy duty bearings suitable for 5HP to 7.5 motor Make: SKF/ZKL |
| 35 | Supply only anti friction heavy duty bearings suitable for2Hp to3HP motor Make: SKF/ZKL |
| 36 | M&L for Cleaning of valve pit chambers of size of chamber of internal size 1200mmx1200mmx1000mmm removing grass,mudcomplete all as specified and directed by Engineer In Charge |
| 37 | M&L Painting on steel and Iron surfaces of LT Panel boards , MS PipesLT Feeder pillar boxes over 10 cm in width including removing of old rust, carbon contents on surfaces by using wire brush, cleaning suitable preparation for re-painting and applying two coats synthetic enamal (ordinary tint) paint of as approved colour over a coat of red oxide zinc chrome primer all as specified. |
| 38 | Supply and Fix Iron foot valves size of 80 mm to 100mm and complete all as specified and directed by Engineer In Charge location such as under ground sump located No 1 Map , No 2 Map (officers accommodation), Kaluchak |
| 39 | Taking down old u/s starter and Supply and install star delta starter in sheet steel enclosure with three phase protection feature suitable for operation on AC, Three phase four wire , 415 Volts, 50 Hz supplyfor Motor of capacityup to 40 HP with relay range 9-15Amps complete and directed by Engr- in Charge Make: L&T or equivalent in SIMENS/HAVELLS with taking down old u/s starter of any type |
| 40 | Supply only high strength dry free flowing and free from lumps solid chlorination medium,minimum chlorine strength 65% available in 40-45kg drums.Chemical name:-Calcium hypochlorite |
| 41 | Material and labour for construction of masonary valve chamber of internal size 600x600x600mm with brick masonary set in cement mortar 1:6 over 100mm thick PCC (1:4:8) type D2 concrete foundation, 50mm thick PCC (1:2:4) type B1 in coping 15mm thick plaster in cm (1:4)m for internal surfaces of walls and externally upto 15cm below ground level, including MS sheet 3.15mm thick hinged cover with locking arrangements including lifting handle fixed to 50x50x6mm angle iron frame embedded in PCC coping including two coats of synthetic enamel paint to steel surfaces over a coat of red oxide primer including necessary excavation and earth work in any type of soil and removal of surplus excavated soil to a distance not exceeding 50mtr including dismantling of old broken valve pit chamber complete all as specified and diretcted |
| 42 | Material and labour for construction of masonry valve chamber of internal size 900 x 900 x 900 mm with brick masonaryset in cement mortar 1:6 over 100mm thick PCC (1:4:8) type D2 concrete foundation, 50mm thick PCC (1:2:4) type B1 in coping 15mm thick plaster in CM (1:4)m for internal surfaces of walls and externally upto 15cm below ground level, including MS sheet 3.15mm thick hinged cover with locking arrangements including lifting handle fixed to 50x50x6mm angle iron frame embedded in PCC coping including two coats of synthetic enamel paint to steel surfaces; over a coat of red oxide primer including necessary excavation and earth work in any type of soil and removal of surplus excavated soil to a distance not exceeding 50mtr including dismantling of old broken valve pit chamber complete all as specified and diretcted |
| 43 | Material and labour for construction of masonry valve chamber of internal size 1200 x 1200 x 1000 mm with brick masonary set in cement mortar 1:6 over 100mm thick PCC (1:4:8) type D2 concrete foundation, 50mm thick PCC (1:2:4) type B1 in coping 15mm thick plaster in cm (1:4)m for internal surfaces of walls and externally upto 15cm below ground level, including MS sheet 3.15mm thick hinged cover with locking arrangements including lifting handle fixed to 50x50x6mm angle iron frame embedded in PCC coping including two coats of synthetic enamel paint to steel surfaces; over a coat of red oxide primer including necessary excavation and earth work in any type of soil and removal of surplus excavated soil to a distance not exceeding 50mtr including dismantling of old broken valve pit chamber complete all as specified and diretcted |
| 44 | Supply and fixing cast iron flanged butterfly valve including taking down old unserviceable valve of size 150mm dia complete all as specified and directed by Engineer-in-charge |
| 45 | Supplying and fixing ofCI pipes 150 mm (6”) dia suitable for and inc leather gasket with nut, bolts, washers, etc for overhead water tank of 20m staging includingTaking up or down old u/s water mains (including all fittings), of any type including burning out joints, turning water OFF or ON as necessary and taking off and refixing covers, access doors etc. and with and including necessary flanged joints, nuts & bolts, rubber gasket etc complete all as specified and directed by Engr in charge. |
| 46 | Supplying and fixing of Cast Iron pipe dia of 200 mm (6”) dia suitable for and inc leather gasket with nut, bolts, washers, etc for overhead water tank of 20m staging includingTaking up or down old u/s water mains (including all fittings), of any type including burning out joints, turning water OFF or ON as necessary and taking off and refixing covers, access doors etc. and with and including necessary flanged joints, nuts & bolts, rubber gasket etc complete all as specified and directed by Engr in charge. |
| 47 | Supply , installation, Commissiong & Testing of LT feeder pillar compartmentalised design of size not less than 70 x 70 x 25 cm suitable for 440 volt 3 phase 4 wire system made out of 2.5 mm CRCA sheet powder coated having gasketed front two hinged doors with locking arrangement including bottom and top detachable gland plate complete with suitable size of rust proof nuts, bolts, and washers etc..complete with mounting accessories including the following components:-(a) Four 30cms long Copperbus bar 400 Ampmounted on epoxy insulators provided with rust proof nuts bolts and washers (b)LED indicating lamps - 3 nos. (Red ,Yellow, Blue) complete all as specified and directed |
| 48 | Supply , laying , testing & CommissioningUG cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (Heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sq mm, 4 core,withSuitable thimbles complete including disconnecting and taking out old existing unserviceable cable all as specified and directed by Engr-in-Charge. |
| 49 | Dry coarse sand as cushioning to under ground cable provided with layer of 8 cms deep before laying the cable and 15 cms deep after laying and stretching the cable, punned to 18 cm thick complete all as specified and as directed by Engr-in-Charge. NOTE Only punned thickness shall be measured for payment purpose. |
| 50 | Sub class \"B\" old size bricks well burnt as covering to under ground cables , laid dry, flat over the cables on sand cushioning with width equal to length of the brick as mechanical protection to cable, complete all as specified and directed. |
| 51 | Excavation in trenches n.exc 1.5 M wide and n.exc. 1.5 M in depth and getting out in soft/loose soilall as directed by Engr-in-Charge |
| 52 | Excavation in trenches n.exc 1.5 M wide and n.exc. 1.5 M in depth and getting out in hard/dense soil all as directed by Engr-in-Charge |
| 53 | Returning filling in including spreading levelling and well ramming in n.exc. 25 Cum complete all as directed by Engr-in-Charge. |
| 54 | Removing the excavated material n.exc. 50m and depositing where directed at & level n.exc. 1.5m above the starting point all as directed by Engr-in-charge. |
| 55 | M&L Daily Cleaning of swimming pool by operating vaccum pool suction sweeper on floor cleaning of side walls with wire brush for minimum 4 Hrs in morning from 5 AM to 9AM and as when required and full time cleaning on every Tuesday by deputing adequate manpower for maintenance of swimming pool complete.Note:-(i) Operation of Suction sweeper motor provided by the Department. Any damage to the Department assets handed over for cleaning due to negligence of firm shall be made good by the firm without any extra cost to the department. (ii)Arrangements if required for residing of two semi skilled persons at swimming pool pump house will be made by the department after proper verification of the individual engaged. (iii) T & P, material, labour, element involved in cleaning shall be provided by firm without any extra cost to the Deptt. |
| 56 | Supply only of brush assembely suitable for vaccum pool cleaner motor cap 2 HP complete all as specified and directed. |
| 57 | M & L Cleaning of silt, sludge mudaccumulated at bottom of Pool drain,pumping out existing water from swimming pool, balancing chamber, under ground water storage sump complete,cleaning the pool, chamber and under gound water storage sump throughly by brushing,removing ugly spot,algae by using acid or harpic and finally washing with bleaching powder to entire satisfaction of Engineer-in- charge. |
| 58 | S&F nylon net wire mesh(like mosquito net) two meter in breadth and eight meter in length for cleaning of any unwanted particles/insect in the swimming pool. |
| 59 | S&F of brush assembely suitable for vaccum pool cleaner motor cap 2 HP complete all as specified and directed. |
| 60 | S&F hard plastics teeth brush for cleaning ofswimming pool of size 30 cm length and width not less than 10 cms fixed with light grade GI Pipe 15 mm bore of 6 Mtr Length complete all as specified anddirected. |
| 61 | Supply only copper sulphate of superior quality complete all as specified and directed. |
| 62 | Supply only bleaching powder complete all as specified and directed. |
| 63 | S&FNylon wire mesh with frame 18\"x18\" connected with extended rods made of stainless steel 12 \" in lengthfor lifting of floating suspended particles on water complete as approved by Engnr-in- Charge. |
| 64 | S&F only PVC floating ball, coloured, 10\" dia complete all as specified and directed. |
| 65 | S&F only PVC wire netting bag of suitable size for 10\" dia PVC ball complete all as specified and directed. |
| 66 | M & L for carry out water quality anyalsis for bacterial , chemical and biological analysis including for collection of water samples from the swimming pool or form location as specified by Engineer-in-charge and testing from Govt approved testing laboratory , submitting of report from minimum following parameters. (a) Free chlorine (b) pH (c ) Total Hardness(d) Total Alkalinity(e) Bacterological standards (f)Chemical standards (g) physical standards of Govt testing lab.Notes: 1. Separate water samples should be collected & tested for Each location as specified above2. No payment shall be made to contractor till submission of water testreport for the water samples oflocations mentioned above |
| 67 | Removing of existing filter media from the pressure filteration plant and cleaning of pressure filter tank by removing ofsand,stone,mud,sludge and brocken stainer etc and fixing ofnew stainer approx 50 nos with change of new fiter media of following size:(a)white quartz pebbles of size 8 mm to 10 mm(b) white quartz sand of size 2 mm to 3 mm(c)fine white quartz sand And testing of filter including applying of existing synthetic enamel paint two coats over a coat of red oxide primer complete all as specified and as directed. |
| 68 | M& L for fixing of green colour rubber hose 50 mm and also removing of old u/s rubber hose complete all as specified and directed by Engineer In Charge |
| 69 | M&L for dismantling of copper silver ionisation filter electrodes,fixing new silver ionisation filter electrode, checking of feed water pump,flow meter,control ball valves and also electrical connections complete all as specified and directed by Engineer In Charge |
| 70 | M & L for removing ofsluice valves repairing, refacing, regrinding, replacement of gland packing and refixing back to its original position including repacking of stuffing box of sluice valve spindle all as specified and as directed by Engineer In Charge |
| 71 | Supply and Installcentrifugal pump controller unit for AC 3phase 415V Centrifugal/monoblockmotor 10Hp capacity and Max relay range 9-14A, Model No : MU-G6 DOL Starter, Cat No SS97756 of Make: L&T or equivalent in Havells/simens with taking down old u/sstarter of any type all as specified and direted by Engineer In Charge |
| 72 | Supply and fixing in replacement pressure gauage of 0-100 mnwp complete all as specified and as directed. |
| 73 | Material and Labour for disconnecting and removing the MOTOR of any make/model / type, from base frameby disconnectingelectrical connections and pump couplers, taking it to workshop for repair, rotor assembly, removing burnt out winding wires complete, Rewinding of Motor same guage and type of insulation copper conductor winding wires and insulation sheets , applying insulating varnishover the complete winding, drying up by heating , assembling back the and rotor including replacement of bearing, nuts, bolts, studs, Gasket, packing,locking pin, terminal blocks, and terminal bolts and nuts and misc accessories & hardware required for making motor functional, both end bearings (labour only) with same size/make complete for 3Ph, 415V, 7.5 Hp motors complete all as specified and as directed. |
| 74 | SCHEDULE \"A\" PART-II (Schedule of credit) Credit amount of Rs (Refer schedule of credit) for retrieved material mentioned in Sch \"A\" Part-II of Tender documents in PDF form will be deducted offline during acceptance of tender of lowest bidder. |
| 75 | Note: (1) The repair has to carried out as and when required basis and accordingly site will be available in piecemeal wise and as directed by Enginer-in-Charge in the area of Air Force Jammu and Kaluchak. |