| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 2 | Brick work with flyash lime bricks (FALG Bricks)(non modular) Conforming to IS 12894-1989 Class designation 7.5in foundation and plinthin : a)Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 3 | 12 mm cement plaster of mix:a)1:6 (1 cement: 6 coarse sand) |
| 4 | 15 mm cement plaster on rough side of single or half brick wall of mix: a)1:6 (1 cement: 6 coarse sand) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Finishing walls with water proofing cement paint of required shade :a)New work (Two or more coats applied @ 3.84 kg/10 sqm) |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a) All kinds of soil. |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : a) Two or more coats on new work |
| 11 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 12 | Total i/c multiplying factor(1.0633) for GST@18% in place of 12% = ? 19,20,889.00 |
| 13 | Add Cost Index @7% |