Himachal Pradesh State Electricity Board-HPSEB has published Construction Of Sub Stations, Ht & Lt Lines Under Border Area Extension Plan For R / Peo & Kaza Towns Under Rdss. Submission Date for this Tender is 27-05-2024. Overhead Line Tenders in Lahul And Spiti Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Mar-2024 | Corrigendum IV | Date | 18-04-2024 |
2 | 18-Apr-2024 | Corrigendum 5 | Date | 29-04-2024 |
3 | 29-Apr-2024 | Corrigendum 6 | Date | 13-05-2024 |
4 | 29-Apr-2024 | other | Other | 13-05-2024 |
5 | 13-May-2024 | Corrigendum No. 7 | Date | 27-05-2024 |
FileName | File Description | File Size |
1f578ec2-d6d5-4efd-822f-e660c66ea660.html | Tender Notice | 0 KB |
BOQ_130994.xls | Tender Document | 0 KB |
ChecklistNarag.xls | Tender Document | 0 KB |
TenderDocument.rar | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Erection of Sub Station(Enter Erection Rates i/c Labour Cess etc in the Rates Column) Dismantlement charges for existing 22/0.4kV, 25kVA S/Stn. |
2 | Erection of 22/0.4 KV, Distribution Sub-Station complete |
3 | Providing and fixing inter-link chain fencing around transformer with angle iron, gate etc. |
4 | C/O Transformer Bed (Civil work) cement concrete (1:2:4) foundation of size (1.60x1.60x1.20 mtr.) |
5 | Erection of 22KV HT line Erection of steel tubular poles 10 mtr.long Three Pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete fillingcomplete in all respect |
6 | Erection of steel tubular poles 10 mtr.long Double pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete fillingcomplete in all respect |
7 | Erection of steel tubular poles 9 mtr.long Double pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete fillingcomplete in all respect |
8 | Erection of steel tubular poles 10 mtr.long Single str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles ,erection of RCC Muffs with Concrete fillingcomplete in all respect . |
9 | Earthing Digging of pits , fixing of earth wire to the earth system , filling of pit etc. |
10 | Stay Set (HT) Digging of pit, fixing of stay Rod, Filling of Pit & Nozzeling & Tighting. |
11 | Sagging of conductor 1Km. Single wire ACSR Cond. 50mm2 Laying of conductor, stringing and sagging , binding with insulator (Single wire) |
12 | Laying of continuous Earth wire.(Single wire ) Laying of GI wire , stringing and sagging and jumpering and guardingetc. |
13 | Erection of 22kV GO Switch alongwith D.O fuse unit, complete in all respect |
14 | Installation , testing and comissioningof Auto re-clouser |
15 | Erection ofLT line Erection of steel tubular poles 9mtr.long single Pole Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of Shackle insulator with D-iron ,fixing of danger plate,erection of RCC Muffs with Concreting fillingpainting of poles complete in all respect. |
16 | Earthing Digging of pits , fixing of earth wire to the earth system , filling of pit etc. |
17 | Stay Set (LT) Digging of pit, fixing of stay Rod, Filling of Pit & Nozzeling & Tighting. |
18 | Sagging of conductor 1Km. Single wire ACSR Cond. 50mm2 Laying of conductor, stringing and sagging , binding with insulator (Single wire) |
19 | Laying of continuous Earth wire.(Single wire ) Laying of GI wire , stringing and sagging and jumpering and guardingetc. |
20 | Erection of 3 MVAAVR Erection , testing and commissioning Charges @10% of total supply cost (for AVR, VCB,Isolator etc) |
21 | Erection of steel tubular poles 10 mtr.long Four pole str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles,erection of RCC Muffs with Concrete fillingcomplete and spreading of shingles in all respect . |
22 | Laying of earth mat @20 % of supply cost |
23 | Civil Work: RCC Foundations for 3 MVA AVR |
24 | RCC Foundations for 22 kV VCB |
25 | Cable Trench |
26 | Mannual Carriage : of material with allied accessories from Divisional Store to Site of work: Village LUCMA-I : Mannual Carriage of Sub Station material |
27 | Village LUCMA-I : Mannual Carriage of HT line material |
28 | Village LUCMA-I :Mannual Carriage of LT Line material |
29 | Village SHURTING :Mannual Carriage of Sub Station material |
30 | Village SHURTING :Mannual Carriage of HT linematerial |
31 | Village SHURTING :Mannual Carriage of LT Line material |
32 | Village NAKDAM :Mannual Carriage of Sub Station material |
33 | VillageNAKDAM :Mannual Carriage of HT linematerial |
34 | VillageNAKDAM :Mannual Carriage of LT Line material |
35 | Village GBRALAM :Mannual Carriage of Sub Station material |
36 | Village GBRALAM :Mannual Carriage of HT linematerial |
37 | Village GBRALAM :Mannual Carriage of LT Line material |
38 | VillageRISHI DOGRI :Mannual Carriage of Sub Stationmaterial |
39 | VillageMDOGRI :Mannual Carriage of Sub Stationmaterial |
40 | VillageMDOGRI :Mannual Carriage of HT linematerial |
41 | Village OP HILL :Mannual Carriage of Sub Station material |
42 | VillageOP HILL :Mannual Carriage of HT linematerial |
43 | VillageOP HILL :Mannual Carriage of LT Line material |
44 | PT 4840 :Mannual Carriage of HT Line material |
45 | VillagePONG :Mannual Carriage of HT linematerial |
46 | Supply of Material for Sub-Station- (Enter the Supply Rates in the Rates Column) Prov. Distribution Transformer 25 KVA, 22/0.4 KV.(O/D Cu wound) |
47 | Prov. Distribution Transformer 63 KVA, 22/0.4 KV.(O/D Cu wound) |
48 | Prov. Distribution Transformer 250 KVA, 22/0.4 KV.(O/D Cu wound) |
49 | Prov. S/T pole 10 mtr. Long. |
50 | Prov. RCC Muffs 2 Mtr Long. |
51 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm ] |
52 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm ] for supporting DO fuse unit & GO switch. |
53 | Prov. MS Angle Iron (50X50x6 mm), Length: 2800 mmfor LA"s |
54 | Prov. Transformer BedBelting & Knee Bracing Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mmforTransformer Bed ] |
55 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm for supporting Main Channel of Transformer] |
56 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm |
57 | Prov. MS Angle Iron (35X35x6 mm), Length : 460 mm |
58 | Prov. MS Angle Iron (50X50x6 mm), Length : 950 mm for Bed Knee Bracing |
59 | Transformmer LT Distribution Box and GO switch fixing Assembly Prov. MS Angle Iron (50x50x6mm) Length (2800mm) |
60 | Prov. MS Angle Iron (50x50x6mm) Length (450mm) |
61 | Prov. GO Switch Handle Supporting ( Channel Iron(75x40x6mm) Length 460mm |
62 | Prov. GO AB Switch Unit (22kV, 400A, 25 KA ) |
63 | Prov. 22kV D.O Fuse Unit |
64 | Prov. Surge Arrester, 18 kV Station Class (Porcelain Type) |
65 | Prov.Discs insulator sets (comprising 2 No. Disc: (Porcelain, BS, 12 KV, 90 KN) including Dead End Clamps, socket ball eye clevisetc. complete in all respect for ACSR conductor 50 mm2) |
66 | L.T. distribution panel box suitable for 25 KVA Sub-station of size 900x800x200mm +/- 5% made of steel sheet 1.63 mm thickness having double door locking arrangement duly powder coated painted. Complete with MCCB 63 Amps 3 poles having following specifications: (in all respect.) Minimum frame size 100 Amp., (2) Type; Fixed Trip Free, (3) Breaking capacity-Icu & Ics at 415, 50 Hz (KA): Not less than 25 KA (4) Thermal Release Range : 40 Amps. (5) Mechanical Life (Operation): 25000 Nos. (6) Electrical life) Operation:7000 Nos. (7) Rated Insulation Voltage (V):690 V (8) Tripping Thermal Releasing Setting: Thermal O/L fixed Setting (9) Tripping Magnetic Releasing Setting: magnetic –S/C Fixed Setting (12 in) (10) (Operation) Voltage: 415 V, AC (11) Calibration Temperature : 40 Degree C (12) High Voltage Withstand Voltage: 3 KV for 1 minute (13) confirming to IS:1993/60947-2,1989 (14) Make L&T/Havell/ Schneider/ABB/C&S (15) ICS: 100%ICU and having single circuit arrangement for 1 No outgoing feeders with kitkat 200 Amps capacity |
67 | L.T. distribution panel box suitable for 63 KVA Sub-station of size 900x800x200mm +/- 5% made of steel sheet 1.63 mm thickness having double door locking arrangement duly powder coated painted. Complete with MCCB 100 Amps 3 poles having following specifications: (in all respect.) Minimum frame size 100 Amp., (2) Type; Fixed Trip Free, (3) Breaking capacity-Icu & Ics at 415, 50 Hz (KA): Not less than 35 KA (4) Thermal Release Range : 40 Amps. (5) Mechanical Life (Operation): 25000 Nos. (6) Electrical life) Operation: 7000 Nos. (7) Rated Insulation Voltage (V):690 V (8) Tripping Thermal Releasing Setting: Thermal O/L fixed Setting (9) Tripping Magnetic Releasing Setting: magnetic –S/C Fixed Setting (12 in) (10) (Operation) Voltage: 415 V, AC (11) Calibration Temperature : 40 Degree C (12) High Voltage Withstand Voltage: 3 KV for 1 minute (13) confirming to IS:1993/60947-2,1989 (14) Make L&T/Havells/ Schneider/ABB(15) ICS: 100%ICU and having single circuit arrangement for 1 No outgoing feeder with kitkat 200 Amps capacity |
68 | L.T. distribution panel box suitable for 250 KVA Sub-station of size 1100x800x275mm +/- 5% made of steel sheet 1.63 mm thickness having double door locking arrangement duly powder coated painted. Complete with MCCB 400 Amps 3 poles having following specifications: (in all respect.) Minimum frame size 400 Amp. (2) Type; Variable Trip Free, (3) Breaking capacity-Icu & Ics at 415, 50 Hz (KA): Not less than 50 KA (4) Thermal Release Range : 320-400 Amp. (5) Mechanical Life (Operation): 20000 Nos. (6) Electrical life) Operation : 4000 Nos. (7) Rated Insulation Voltage (V):690 V (8) Tripping Thermal Releasing Setting: Thermal O/L variable Setting (9) Tripping Magnetic Releasing Setting: magnetic –S/C Fixed Setting (12 in) (10) (Operation) Voltage: 415 V, AC (11) Calibration Temperature : 40 Degree C (12) High Voltage Withstand Voltage: 3 KV for 1 minute (13) confirming to IS:1993/60947-2,1989(14) Make L&T/Schneider/ABB/C&S (15) ICS: 100%ICU and having three MCCB of 250 Amp 36 KA for 3 Nos outgoing feeders. |
69 | Prov.Stay set complete |
70 | Prov.Stay wire (7/4.00mm) |
71 | Prov. Pipe earthing set Sub-Station type including 50kg salt and 50kg coal each. |
72 | Prov.Half Clamp (M.S. Flat 50X6 mm) |
73 | Prov.Full Clamp (M.S. Flat 50X6 mm) |
74 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more (with flat and spring washers)] |
75 | Prov. Aluminium Thimble( various small sizes) |
76 | Prov. Aluminium Thimble ( various large sizes) |
77 | Prov. Danger plate(250X200X1.6 mm) |
78 | Prov. Barbed wire |
79 | Prov. LTXLPE Cable unarmoured 3.5 Core 50 mm2 |
80 | Prov. LTXLPE Cable unarmoured 3.5 Core 95 mm2 |
81 | Prov. LTXLPE Cable unarmoured 3.5 Core 120 mm2 |
82 | Prov. LTXLPE Cable unarmoured 3.5 Core 400 mm2 |
83 | Prov.3-phase LT-CT operated smart meter with metering-DT meter with CTs ,100/5A, Control cables with DI Provison meter box , for 25 KVA Transformer. |
84 | Prov.3-phase LT-CT operated smart meter with metering-DT meter with CTs ,200/5A, Control cables with DI Provison meter box , for 63 KVA Transformer. |
85 | Prov.3-phase LT-CT operated smart meter with metering-DT meter with CTs ,400/5A, Control cables with DI Provison meter box , for 250 KVA Transformer. |
86 | Prov. Aluminium paint. |
87 | Prov GI wire 6 SWG(5mm) for earthing |
88 | Prov. HT Egg Insulator. |
89 | Prov. Bend stapple |
90 | Prov. Line stapple |
91 | Supply Part of HT line Prov ACSR Condt. 6/1/3.35 (50mm2) |
92 | Prov. S/T pole 10 mtr. Long. |
93 | Prov. S/T pole 9 mtr. Long. |
94 | Prov. RCC Muffs 2 Mtr. Long |
95 | Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (5600) mm. |
96 | Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (2800) mm. |
97 | Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (1800) mm. |
98 | Prov.BeltSet - MS Angle Iron: 65x65x6, Length 1800 mm |
99 | Prov. X-Bracing Set - MS Angle Iron: 50x50x6, Length 2700mm |
100 | Prov. Knee-Bracing Set - MS Angle Iron: 50x50x6, Length 950mm |
101 | Prov.Discs insulator sets (comprising 2 No. Disc: (Porcelain, BS, 12 KV, 90 KN) including Dead End Clamps, socket ball eye clevisetc. complete in all respect for ACSR conductor 50 mm2) |
102 | Prov. 22 KV Pin insulator(Porcelain,22kv.), with pin |
103 | Prov. HT Egg Insulator. |
104 | Prov. Bend stapple |
105 | Prov. Line stapple |
106 | HT Stay / Guy Arrangement Prov. Stay set complete in all respect |
107 | Prov.Stay Wire (7/4 mm) |
108 | Earthing Prov. HT Earthing set complete |
109 | Single Continous Earth wire (GI, 8 SWG) |
110 | Prov. Eye Hook for earth wire |
111 | Earth wire Clamp |
112 | Prov.Danger Plate (250X200X1.6 mm) |
113 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more (with flat and spring washers)] |
114 | Prov. Barbed Wire |
115 | Prov. Aluminium Paint |
116 | Prov. Pole Top Bracket(MS channel iron 100x50x6.4mm), length 350mm |
117 | Prov.Half Clamp (M.S. Flat 50X6 mm) |
118 | Prov.Full Clamp (M.S. Flat 50X6 mm) |
119 | Prov. Support clamp (M.S. Flat 50X6 mm) |
120 | Prov. Stay clamp (M.S. Flat 50X6 mm) |
121 | Material for GO Switch. Prov. GO AB Switch Unit (22kV, 400A, 25 KA ) |
122 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm] for supporting DO fuse unit & GO switch |
123 | Prov. 22 kV D.O Fuse Unit |
124 | MS Angle Iron (50x50x6mm) Length : (450mm) |
125 | GO Switch Handle Supporting :[ Channel Iron (75x40x5mm), Length : 460mm. |
126 | Prov.22 kV Auto Re-clousre, (630,12.5 kA for 3-sec) with inbuilt CT and PT unit including router, modem, MM gateway, Earthnet switch, control cable, panel for meters battery and battery charger, LAN cables, software(of make schnider, ABB or Alstom etc.) |
127 | Supply Part of LT line Prov.ACSR 6/1/3.35(50mm2) |
128 | Prov. S/T pole 9 mtr. Long. |
129 | Prov. RCC Muffs |
130 | Prov. LT stay set. |
131 | Prov. LT stay Wire(7/3.15 mm) |
132 | Prov .Shackle Insulator (16KN) |
133 | Prov .D-Iron (U-Clamps) |
134 | Prov. Nuts & bolts of varous sizes |
135 | Prov. Aluminium paint. |
136 | Prov. GI Wire 8SWG |
137 | Providing. support clamp (M.S. Flat 50X6 mm) |
138 | Prov. Stay clamp (M.S. Flat 50X6 mm) |
139 | Providing Danger Plate. (250X200X1.6 mm) |
140 | Providing LT Egg Insulator. |
141 | LT earthing set |
142 | Earth knob |
143 | Spiral PVC Spacer |
144 | Providing 3 MVA AVR Regulating Transformer(Three Phase) 3 MVA three phase , 22kV (+10%, - 25%) HT line Automatic Voltage Regulator |
145 | 22kV Equipements Vaccum Circuit Breaker 22kV,1250A,26.2kA (O/D) |
146 | Control and Relay Panel Transformer Panel with out differential Relay &with out BCU |
147 | Isolator with Earth Switch (630A) |
148 | Multi Core Multi ratio Current Transformer 200-100/1-1-1-1A |
149 | Lightening Arrestor 22 kV Porecelin (18kV, 10KA) |
150 | PTs 22kV (22 kV/v3/ 110V/v3-110/v3-110V) |
151 | BMK Bay Marshalling Kiosks:- 22 KV |
152 | CT Junction Box |
153 | PT Junction Box |
154 | 1.1KV PVC, HR FRLS, Copper Control Cable (Un-Screened) 2x2.5 mm² control cable |
155 | 4x2.5 mm² control cable |
156 | 6x2.5 mm² control cable |
157 | 12x2.5 mm² control cable |
158 | SUPPORT STRUCTURE Steel tubular pole 11 m long |
159 | RCC muffs & concreting |
160 | Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (5600) mm. |
161 | M.S. Half clamps |
162 | Full Clamp |
163 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
164 | ACSR 100 mm² conductor for Jumpers and busbar |
165 | Discs insulator sets (comprising 2 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) |
166 | Prov. 22 KV Pin insulator(Porcelain,22kv.), with pin |
167 | Copper thimble 400 Amp |
168 | EARTHING Prov. Material for Earth mat laying with M.S Flat 50x6mm 160 mtr andalongwith charcoal and salt |
169 | Earthing pipe electrode |
170 | 20 mm round, 3 mtr long & weighing 2.47 kg/m 15 No. electrode 15x3x2.47=111.15 kg |
171 | GI wire no. 6 SWG |