|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 2 | Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of theengineer- in-charge:-In cement mortar. |
| 3 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : -All kinds of soil; Support Pipe foundation, Below Flooring excavation, Ground beam, Surface Drain.Note: In case the measurement of actual filling is taken to calculate the quantity involved under this item, the entire quantity of filling thus calculated, should not be considered straightway for payment under this item, but the net quantity after deduction 10% quantity for not consolidating the filling under optimum moisture content only should be considered for payment, under this rate, i.e., if the calculated quantity of filling is 10 cum the payment should be made only for 9 cumunder this item. (Refer CPWD specification clause 2.10.5) |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. All kinds of soil |
| 5 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 6 | Flat Brick soling, Providing and laying flat brick flooring in cement mortar including cement slurry etc. complete. In cement mortar 1 : 5 ( 1 cement : 5 fine sand ) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) |
| 9 | Centering shuttering including struttings, propping etc. And removal of form work for:Foundations, footings, bases for columns. |
| 10 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:- In cement mortar 1:6 ( 1 cement : 6 fine sand ). |
| 11 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 12 | Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required.Hot finished welded type tubes, 50 mm dia:-( Unit weight =5.43). |
| 13 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required and as per direction of Engineer-incharge. |
| 14 | cement plaster of mix, In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) |
| 15 | Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. [Payment shall be made after submission of Test Certificate issued by the Manufacturer] |
| 16 | Applying one coat of water thinnable cement primer ofnapproved brand and manufacturer on wall surface complete. |
| 17 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade [Payment shall be made after submission of Test Certificate issued by the Manufacturer]:Two or more coats on new work over an under coat of suitable shade with ordinary paint (primer) of approved brand and manufacture |
| 18 | Neat cement punning. |
| 19 | Providing and laying cement concrete 1:2:4 (1 cement: 2 fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips and cost of glass strips etc. complete. |