Serve / Layout Work At Various Places In Trust Section Ii ( Annual Contract ) -Item Code [ Survey Ts 1 B ] :Item Type [ Other ] ::Topographical Survey With Level ( Contouring Required ) With Rtk Dgps Equipment By Taking Levels At A Spacing Of 5Mx5m Or Less In Two Mutually Orthogonal Directions, Keeping Variation In Levels Within 0.25M Of The Sites And Plotting Contour At 0.25M Intervals And L-Section , X-Section As Per Requirement Of Engineer Incharge .Including Outlines Of Civil Structures & Main Physical Structures Such As Park, Tree, Road, Canal, Culvert, Govt. Building, Power Line. ( Ht / 132Kv Etc ) , Drain, Water Supply Pipe Line, 11.P., Electric Poles, Telephone Pole, B Item Code [ Survey Ts 10 ] :Item Type [ Other ] ::Demarcation ( Lay-Out ) By Using Total Station Equipment Stack Out Method With X, Y, Z Co¬Ordinates For Proposed Planning / Scheme With All Blocks And Plots . On The Ground Using Wooden Pegs / Lime Line In Uit Areas Rate To Include Erection Of Wooden Pegs. All Materials Such As Lime, String, Labors Etc. Helping Civil Supervise Appointed In Marking Center Point. Co-, Ordinates An Levels On Grid Pillars With Reference To Pre-Established Permanent B. M. Upto 2 Acres Item Code [ Survey Ts 10 A ] :Item Type [ Building ] ::Demarcation ( Lay-Out ) By Using Total Station Equipment Stack Out Method With X, Y, Z Co¬Ordinates For Proposed Planning / Scheme With All Blocks And Plots . On The Ground Using Wooden Pegs / Lime Line In Uit Areas Rate To Include Erection Of Wooden Pegs. All Materials Such As Lime, String, Labors Etc. Helping Civil Supervise Appointed In Marking Center Point. Co-, Ordinates An Levels On Grid Pillars With Reference To Pre-Established Permanent B. M. 2 To 5 Acres ( Add Extra For Area In Excess Of 2.0 Acres. ) Item Code [ Survey Ts 10 B ] :Item Type [ Other ] ::Demarcation ( Lay-Out ) By Using Total Station Equipment Stack Out Method With X, Y, Z Co¬Ordinates For Proposed Planning / Scheme With All Blocks And Plots . On The Ground Using Wooden Pegs / Lime Line In Uit Areas Rate To Include Erection Of Wooden Pegs. All Materials Such As Lime, String, Labors Etc. Helping Civil Supervise Appointed In Marking Center Point. Co-, Ordinates An Levels On Grid Pillars With Reference To Pre-Established Permanent B. M. Above 5 Acres ( Add Extra For Area In Excess Of 5.0 Acres. ) Item Code [ Survey Ts 11 ] :Item Type [ Other ] ::Demarcation Work ( Layout ) Of Auctioned Plots According To Given Dimension And Area With Fixing Of Wooden Pegs, Line Powder Lining. Item Code [ Survey Ts 14 New ] :Item Type [ Building ] ::Providing And Fixing Of Stone Demarcation Pillar Of Size 75 X 75 X 600 Mm Including Fixing In Cement Concrete 1 : 2 : 4 Excavation Transportation Of Pillar At Required Location With All Lead And Lift , Coloring , Painting , Numbering All As Per Direction Of Engineering Incharge Item Code [ Survey Ts 1A ] :Item Type [ Other ] ::Topographical Survey With Level ( Contouring Required ) With Rtk Dgps Equipment By Taking Levels At A Spacing Of 5Mx5m Or Less In Two Mutually Orthogonal Directions, Keeping Variation In Levels Within 0.25M Of The Sites And Plotting Contour At 0.25M Intervals And L-Section , X-Section As Per Requirement Of Engineer Incharge .Including Outlines Of Civil Structures & Main Physical Structures Such As Park, Tree, Road, Canal, Culvert, Govt. Building, Power Line. ( Ht / 132Kv Etc ) , Drain, Water Supply Pipe Line, 11.P., Electric Poles, Telephone Pole, B ( 2.0 To 5.0 Acre ) Item Code [ Survey Ts 1C ] :Item Type [ Other ] ::Topographical Survey With Level ( Contouring Required ) With Rtk Dgps Equipment By Taking Levels At A Spacing Of 5Mx5m Or Less In Two Mutually Orthogonal Directions, Keeping Variation In Levels Within 0.25M Of The Sites And Plotting Contour At 0.25M Intervals And L-Section , X-Section As Per Requirement Of Engineer Incharge .Including Outlines Of Civil Structures & Main Physical Structures Such As Park, Tree, Road, Canal, Culvert, Govt. Building, Power Line. ( Ht / 132Kv Etc ) , Drain, Water Supply Pipe Line, 11.P., Electric Poles, Telephone Pole, B ( Above 5.0 Acres ) Item Code [ Survey Ts 1D ] :Item Type [ Other ] ::Topographical Survey With Level ( Contouring Required ) With Rtk Dgps Equipment By Taking Levels At A Spacing Of 5Mx5m Or Less In Two Mutually Orthogonal Directions, Keeping Variation In Levels Within 0.25M Of The Sites And Plotting Contour At 0.25M Intervals And L-Section , X-Section As Per Requirement Of Engineer Incharge .Including Outlines Of Civil Structures & Main Physical Structures Such As Park, Tree, Road, Canal, Culvert, Govt. Building, Power Line. ( Ht / 132Kv Etc ) , Drain, Water Supply Pipe Line, 11.P., Electric Poles, Telephone Pole, B ( Upto 2.0 Acers ) Item Code [ Survey Ts 8 ] :Item Type [ Building ] ::Demarcation ( Lay-Out ) By Using Total Station / Dgps Equipment Stack Out Method With X, Y, Z Co¬Ordinates Of Developing Concepts Such As Lay-Out Of Road Center Line Only On The Ground Using Wooden Pegs In Uit Area.