Tender For Work Of Attending The Break Down Due To Various Reasons For Providing Uninterrupted Power Supply To Consumers In The Jurisdiction Of Edd-Iv, Iglas
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Mar 2024
0 days left
EMD
5000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
iglas → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Work Of Attending The Break Down Due To Various Reasons For Providing Uninterrupted Power Supply To Consumers In The Jurisdiction Of Edd-Iv, Iglas
BOQ
| Sl. No. | Item Description |
| 1 | Cartage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). |
| 2 | PCC poles 8.5 Mtr./ST poles 11/13 Mtr. |
| 3 | Cartage of line material viz LT Cable, Conductor/ GI earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). |
| 4 | Erection of single support including complete H.T/L.T fittings (with drilling & Cutting) as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 5 | PCC poles 8.5 Mtr./ST poles 11/13 Mtr. |
| 6 | Dismentling of old and damaged 33 KV & 11 KV Line on Double pole/Section pole after dismentling of all accessories. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 7 | Erection of double pole/Section Pole on PCC /ST pole including the work of complete line (With drilling & Curtting) as per RESSPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 8 | Erection and grouting of stay set including the work of nozzling etc. as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work. |
| 9 | Providing and fixing of stay insulator. |
| 10 | Grouting of PCC poles 8.5 Mtr./ ST poles 11 Mtr/13 Mtr.. Long as per RESSPO norms |
| 11 | Making the plinth of Steel poles. |
| 12 | Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work. |
| 13 | Chopping of tree branches which are touching to HT/LT lines. |
| 14 | Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work. |
| 15 | Straightening of tilted PCC/Steel pole at various places as per direction of JE. |
| 16 | Laying, sagging, stringing, bindingand jumpering etc. of new/old line conductor on the newly/old erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. |
| 17 | ACSR Weasal Conductor |
| 18 | ACSR DOG Conductor |
| 19 | ABC 3x120+1x95+1x16 sq.mm/ABC 3x95+1x70+1x16 sq.mm/ABC 3x50+1x35+1x16 sq.mm |
| 20 | Re-sagging of loose HT/LT line conductor as per direction of superwising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work. |
| 21 | ACSR Weasal Conductor |
| 22 | ACSR Dog Conductor |
| 23 | Replacement/Re-fixing of following damaged/ disturbed/de-aligned accessories:- |
| 24 | 33 KV Disc Insulator with fitting |
| 25 | 33 KV Pin Insulator with pin |
| 26 | 33 KV V-type Cross Arm |
| 27 | 11 KV Disc Insulator with fitting |
| 28 | 11 KV Pin Insulator with pin |
| 29 | 11 KV V-type Cross Arm |
| 30 | F bracket |
| 31 | Providing & Fixing ofClamps of LT,Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts. |
| 32 | Providing/Fixing of missing Nut bolts and washer |
| 33 | Dismantling and removal of existing conductor from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 34 | ACSR Weasal Conductor/GI wire. |
| 35 | ACSR Dog Conductor |
| 36 | Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESSPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. |
| 37 | Filling of 3x70/3x120/3x185/3x300 Sq.mm. 33 KV & 11 KVXLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work. (In Case of jointing kit not available from store sowill be provided by the contractor.) |
| 38 | Repairing of 3x70/3x120/3x185/3x300Sq.mm 33 KV & 11 KVunder ground cable by StraightThrough after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost. |
| 39 | Safe carriage of Old line material viz. Conductor, G.I. Earth wire, ABC conductor, Cross Arm, Angle, Channel, Insulators, Clamps & other line material from any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work. |
AI Tender Summary
Tender Timeline
Mar 10, 2024
11:30 IST
Tender Published
Tender notice published.
CompletedMar 15, 2024
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 15, 2024
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender