Tender For Repair And Maintenance Of Split Oblique Cassette Type Air Conditioners At Aaims Bibinagar
Tender Overview
Project Description
Tender For Repair And Maintenance Of Split Oblique Cassette Type Air Conditioners At Aaims Bibinagar
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Mar-2024 | Date Corrigendum | Date | 27-Mar-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | General servicing of 1/1.5/2 ton Split Air conditioners includes as follows |
| 2 | i) Inspection of the AC – IDU and ODU for any abnormality in operation, sound, cooling etcii) Testing the Performance of AC for desired cooling.iii) Remove dust and clean the inside and outside units.iv) Testing of Gas pressure if necessary and check for any leakages near the check nut etc or diagnose any other fault.v) Remove the filter, water service and fix it back after drying. If any damage Replace with new filters (Filter amount Paid sepparetly)vi) Clean the drain tray and drain pipe and remove any choke for free flow of drain water.vii) Clean the Evaporator with brush and remove the dirt/dust. Check for any fungus formation or bad smell and wash it with chemical, if required.viii) Water washing of Condenser Coil.ix) Topping of Refrigerant gas, if required (Refrigerent amount to be paid for separately)x) Clean the condenser coil with blower.xi) Clean the external grill/casing with soap water jet wash.xii) Check for any loose connections. xiii) Lubricate the motors, whenever necessary and carry out maintenance of compressor/fan motor. xiv) Wet cleaning/de-scaling must be carried.xv) Carry out Repairs/Maintenance of any other items/parts of the unit including unit bracket and casing. (Major Spare parts repaire orto be paid for separately)xvi) Seal a small openings around the pipingswith gum type sealer. |
| 3 | Split AC Indoor Unit |
| 4 | PCB Replacement (Non inverter) only single side indoor or out door compitable to existing unit. |
| 5 | PCB Replacement (Non inverter) only Both side indoor and out door |
| 6 | PCB Replacement (inverter) only single side indoor or out door compitable to existing unit |
| 7 | PCB Replacement (inverter)Both side indoor and out door |
| 8 | PCB Repair (Non inverter/Inverter) |
| 9 | Sensor Replacement |
| 10 | Stabilizers for 1/1.5 ton |
| 11 | Stabilizers for 2 ton |
| 12 | Blower Motors Replacement |
| 13 | Swing motors replacement for 1.5/2 Ton Split |
| 14 | Blower |
| 15 | Air filters |
| 16 | Remote control Units Original |
| 17 | Louver set |
| 18 | Split AC Out door Unit |
| 19 | Out door Fan Motor Replacement |
| 20 | Out door Fan Replacement |
| 21 | Fan Capacitor Replacement |
| 22 | Compressor Replacement |
| 23 | Compressor Capacitor |
| 24 | Condenser Coils replacement and gas fiiling in condenser coil |
| 25 | Gas Filling including Refrigerant |
| 26 | For All type of Split and cassette Air conditioners |
| 27 | Relocation (including indoors and out door unit) |
| 28 | Supply and laying with foarm insulation of 12mm Copper pipeincluding tubular foam Insulation |
| 29 | Supply and laying with foarm insulation of Supply 15mm Copper pipeincluding tubular foam Insulation |
| 30 | Laying cost of copper pipe up to 15 mm (if material Provided by AIIMS) |
| 31 | Outdoor stand set |
| 32 | Core cutting (including Wall/Concrete) |
| 33 | Foam Insulation |
| 34 | For Cassette Air conditioner |
| 35 | General servicing 2/3 ton Cassette AC:General servicing of 2/3ton cassette Air conditioners includes as followsi) Inspection of the AC – IDU and ODU for any abnormality in operation, sound etcii) Testing the Performance of AC for desired cooling. iii) Remove dust and clean the inside and outside units. iv) Testing of Gas pressure if necessary and check for any leakages near the check nut etc or diagnose any other fault.v) Remove the filter, water service and fix it back after drying. If any damage Replace with new filters (Filter amount Paid sepparetly)vi) Clean the drain tray and drain pipe and remove any choke for free flow of drain water.vii) Clean the Evaporator with brush and remove the dirt/dust. Check for any fungus formation or bad smell and wash it with chemical, if required.viii) Water washing of Condenser Coil.ix) Topping of Refrigerant gas, if required (Refrigerent amount to be paid for separately)x) Clean the condenser coil with blower.xi) Clean the external grill/casing with soap water jet wash.xii) Check for any loose connections. xiii) Lubricate the motors, whenever necessary and carry out maintenance of compressor/fan motor. xiv) Wet cleaning/de-scaling must be carried.xv) Carry out Repairs/Maintenance of any other items/parts of the unit including unit bracket and casing. (Major Spare parts repaire orto be paid for separately)xvi) Seal a small opening around the pipings with gum type sealer. |
| 36 | For Cassette Air conditioner Indoor Unit |
| 37 | Blower indoor |
| 38 | Blower Motors Replacement |
| 39 | Drain Water pump |
| 40 | PCB replacement including sensors one sideindoor or out door unit for Cassete AC 2/3Ton |
| 41 | PCB replacement including sensors Two sidesindoor and out door unit for Cassete AC 2/3 Ton |
| 42 | PCB Repair indoor and out door unit for Cassette AC 3/4 Ton |
| 43 | Main supply terminals |
| 44 | Capacitor replacement |
| 45 | Running Capacitors |
| 46 | Nitrogen Leakage Testing and Rectification |
| 47 | Contactors heavy 3 phase |
| 48 | For Cassette Air conditioner Out door Unit |
| 49 | Out door Fan Motor Replacement |
| 50 | Out door Fan Replacement |
| 51 | Fan Capacitor Replacement |
| 52 | Compressor Replacement |
| 53 | Compressor Capacitor |
| 54 | Gas Filling including Refrigerant in 2Ton |
| 55 | Gas Filling including Refrigerant in 3Ton |
| 56 | Filters |
| 57 | Remote control Units Original |
| 58 | Condenser Coils replacement and gas fiiling in condenser coil |
| 59 | Cabling from IDU to ODU |
| 60 | Minor Parts of indoor / Outdoor unit enclosures fastners |
| 61 | Drain piping from IDU to drain point |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender