| 1 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. (17-Chapter SI.No.16) |
| 2 | Removal of Silt for Nala/Nali in liquid mud or faul position with special T&P including lead 30m and lift up to 3.00m etc. all complete. (As per Attached sanctioned rate analysis) |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar. (17-Chapter Si.No.6) |
| 4 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) |
| 5 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) |
| 6 | Providing and Fixing close timbering in trenches on Both Side & all complete.(a) 0.00 To 3.00 M. (None Scheduled) |
| 7 | Making of Nala Bandha with sand bags. With local sand including etc. all complete. (Atached per Annalysis rate). |
| 8 | Providing of 32H.P. Disiel Pump Set for dewatering of pond with pump operator and fuel charges etc all complete. (For 8 Hours) |
| 9 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) |
| 10 | R.c.c work with cement approved coarse sand and 4cm gauge approved stone ballast in the proportion 1:2:4 (One part of Cement, 2 part of Coarse sand and 4 part of 4cm. stone grit) in R.CC Raft Foundation and Footing 4cm. Gauge approved stone ballast excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150 grade.(5-Chapter S.I.No.287) |
| 11 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1: 1½: 3 in (One part of Cement, 1½ part of Coarse sand and 3 part of 2cm. Stone Grit) Wall/R.CC Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centring and shuttering etc. And also including supply of all materials labour and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-20 grade.{5-Chapter Si.No.11(i)} |
| 12 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150.(5-Chapter Si.No.8) |
| 13 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B)) |
| 14 | Providing and Fixing PVC pipe conforming to ISI make working pressure 6 kg/Cm including testing labour T&P etc. all complete.140mm diameter. (Chapter No.23 SI.No. 32(iv)) |
| 15 | Providing and Fixing of Barricading of 100mm dia average ballies with in a distance of 1.50 meter for 3 rows of 3 Q, 3 nos of Cross ballies, two supporting ballies of 3 meter ballies and 2 nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (Material will be property of Contractor after dismantling). |
| 16 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft ) including Painting, Lettering etc. all complete. (None Schedule) |
| 17 | Sub Total (A) |
| 18 | Deduction Cost of Material Old workable bricks etc. all complete. |
| 19 | Diduction of cost brick/bats. (Chapter No.1 Sr.No.2(c)) |
| 20 | Sub Total (A) |
| 21 | Sub Total (A-B) |
| 22 | Add 18% G.S.T. |
| 23 | Sub Total |
| 24 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 25 | Grand Total |