|
| 1 | S/Fixing of following accessories in the existing light fitting i/c connection etc. as required.(Make:Philips or SS make.)(a). 4/2 ft, 36/20 watt flourescent tube light |
| 2 | (b). Starter for 20 watt/36 watt fittings. |
| 3 | ©. 9 watt CFL Lamp |
| 4 | S/F of following size power strip for operation on 230V 50 HZ AC supply on surface i/c connection etc. complete as required. (a). 4 way 5 Amp power strip |
| 5 | S/F of following electrical items in the building as required by the officers etc. as required.(a) Electric Bell (Ding Dong) |
| 6 | (b). Three Core 40/76 copper wire |
| 7 | ©. Two Core 23/76 copper wire. |
| 8 | (d). 5A switch/ bell push / pendent switch |
| 9 | (e). 3 pin 5A plug top |
| 10 | (f). 15 Aswitch |
| 11 | (g). 5 A 3 pin socket |
| 12 | (h). 15 A 6 pin socket |
| 13 | (i). 15 A 3 pin plug top |
| 14 | (j). 3/4 way gang box |
| 15 | (l).Drawing of 1.5 Sq.mm copper wire in existing conduit |
| 16 | (m). 15 A 5 pin Combind Box |
| 17 | (n). Call bell with Remote |
| 18 | (o). Drawing of 2x4.0 Sq.mm copper wire in existing conduit |
| 19 | (p). 6 to 32 A SPMCB |
| 20 | (q).2.0/2.25/2.5µfd condensor |
| 21 | (r). 4.5 µfd condensor |
| 22 | (s). Fan regulator electronic |
| 23 | (t). 36/40/11 W Elecronic Ballast |
| 24 | (u). Side Holder |
| 25 | (v). 40 Amp DP isolator |
| 26 | Rewinding & Repairing of ceiling fan / wall mounted fan / 300 mm Ex. fan 230 volt 50 hz AC supply & replacement of bush bearing, insulation , papering connection & testing etc as reqd |
| 27 | Rewinding & Repairing of Exhaust fan 450 mm230 volt 50 hz AC supply & replacement of bush bearing, insulation , papering connection & testing etc as reqd |
| 28 | S/F of PVC casing caping of following size etc. complete as required.(a). 20 mm X 10 mm |
| 29 | (b). 25 mm X 10 mm |
| 30 | Repairing of room heater230 volt 50 hz AC supply 1000 Watti/c 1000 w heating rod element,connector patti,with top & connection testing, cleaning etc complete as reqd. |
| 31 | Supply and replacement of heat reflector sheet in exsiting defective room heater i/c cleaning testing as reqd. |
| 32 | Repairing of heater blower i/c replacement ofheating coil,thermostatetc complete as reqd |
| 33 | Replacement of ceiling fan complete with blades i/c S/F of down rod of length (Upto 30cm) alongwith its wiring with 1.5 sqmm FR PVC insulated copper conductor single core cable etc. as required. |
| 34 | Replacement of 4\"-20 watt LED fitiing complete directly on ceiling/wall i/c connection with 1.5 sq. mm copper conductor single core cable etc. as reqd. |
| 35 | Replacement of 400mm sweep three speed oscilating type wall mounting fans 230 Volt 50 Hz AC supply on existing wall i/c connection etc as reqd.(M/S Usha/ Bajaj/Crompton./ SS make). |
| 36 | Replacement of 300mm sweep Fresh air fans 230 Volt 50 Hz AC supply on existing wall i/c connection etc as reqd.(M/SBajaj/Crompton./ SS make) |
| 37 | Replacement of 2\"x2\" size-36 watt LED fitiing completeon false ceilingi/c connection with 1.5 sq. mm copper conductor single core cable etc. as reqd. (Make,Havells or SS) |