| 1 | Dismantling of existing Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. |
| 2 | Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of workas directed by Engineer-in-Charge as per I.D. specification. |
| 3 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 4 | Plain Cement Concrete in 1:4:8 in base of toe wall with Coarse Sandhaving F.M. Not less than 2.5, old dismantled brick ballast of nominal size of 20 mm to 40 mm, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 5 | Plain Cement Concrete M15 gradein Toe Wall, Sleepers and Top/Cut-off Wall with Coarse Sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 6 | Plain Cement Concrete M20 Gradein Lining with Coarse Sandhaving F.M. Not less than 2.5, Crushed Stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 7 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 8 | Supplying and laying Stone Grit below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 9 | Providing & Laying LDPE Sheet on slope below lining including cost of all materials, labour, T&P etc required for proper completion of workas directed by Engineer-in-Charge as per I.D. specification. |
| 10 | Centering and shuttering for CC work including cost of all materials, labour and T&P with all leads and up lift/down lift for proper completion of workas directed by Engineer-in-Charge as per I.D. specification. |
| 11 | Earth work in filling for making bank with dressing & manual compaction including all lead and lift, carriage labour T&P etc complete in all respect. |
| 12 | Brick on edge soling with old dismantled lining brick/tile including preparation of sub-grade to prescribed camber, filling joint with Local sand/earth including cost of material, labour and T&P etc for proper completion of workas directed by Engineer-in-Charge and as per I.D. specification. |
| 13 | Supplyingand fixing Pressure Relief Valve including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 14 | Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specification. |
| 15 | Supplying and laying of Water stopper for water resistance at transverse sleepersincluding cost of all materials, labour and T&P etcproper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 16 | Providing and fixing sealing compound in between panel joints including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by engineer -in-charge as per drawing and I.D. Specification |
| 17 | Supplying and laying 25 mm dia CPVC Pipe in Sleepersincluding material, labour,T&Petc. complete work directed by Engineer-in-charge. |
| 18 | Supplying and laying 25 mm dia CPVC Pipe in Sleepersincluding material, labour,T&Petc. complete work directed by Engineer-in-charge. |
| 19 | Supplying and laying 25 mm dia CPVC Pipe in Sleepersincluding material, labour,T&Petc. complete work directed by Engineer-in-charge. |