Public Works Department-PWD has published Tender For 1 Construction Work Of Boundry Wall Dullakheri Shamshaan Ghaat In Distt. Shamli In F.Y. 2023-24. Submission Date for this Tender is 11-03-2024. Wall construction Tenders in shamli Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) SI No. 251a I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
2 | Cement Concrete with 4 cm gauge approved stone Ballast, Coarse sand and cement in the proportion of 8:4:1including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI No. 281 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
3 | M-150 Brick Work in 1:3 (One cement & three coarse sand) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. SI No. 307 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
4 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1½:3in Column and T-Beam excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work includingcost of binding wire. The rate excludes making of drip course which shall be paid extra. SI No. 289 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
5 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. SI No. 504 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
6 | Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work SI No. 279a |
7 | 12 mmthick plaster with cement and Coarse sand of 1.25 fineness modules in 1:3 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. SI No. 582a I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail