IndianOil Adani Gas Private Limited-IOAGPL has published Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Ioagpl Chandigarh Ga. Submission Date for this Tender is 25-03-2024. Civil Work Tenders in Ghaziabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-Mar-2024 | BID EXTENSION | Date | 25-03-2024 |
Sl. No. | Item Description |
1 | Attending leakage complaint/maintenance from TF to Appliance (Gas Stove) of PNG connection (GI installation) |
2 | Attending Gas Leakage complaint from TF to Appliance (Gas Stove) with all tools, tackles and consumbales. Scope includes checking of leakage at joints with Soap Solution/Gas Detector, attending leakage, painting touch up work, Prepration of report as per format provided by IOAGPL.Sufficient crew/Manpower shall be available at site and should attend the leakage within 30 minutes of complaint reporting time.Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe/fittings etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be bidder scope. Consumables shall include but not limited to GI powder coated clamps, Teflon Tape, "O" ring, etc. |
3 | MDPE damage recification/repair & maintenance work (upto 63 mm Dia) |
4 | Scope inculdes attending MDPE leakage complaint (Up to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor |
5 | MDPE damage recification/repair & maintenance work (above 63 mm Dia) |
6 | Scope inculdes attending MDPE leakage complaint (above to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor |
7 | MDPE Valve Chamber Cleaning, Maintenance, etc. |
8 | Scope include deployment of manpower with all Tools, Tackles, Machinery, etc. (i.e. Mud Motor, Generator, etc) for cleaning of MDPE Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC. |
9 | Attending Service Regulator leakage complaint, Repair, Maintenance, etc. |
10 | Scope Include attending SR box leakage complaint, Reapair, Replacement, etc. within 30 min of complaint report time with all the tools, tackles and consumables, rectification of leakage, prepration of reprot as per format provided by IOAGPL. Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe, Fittings, Regulator, etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be contractor scope.Works shall be executed as per instruction and satisfaction of EIC/SIC. |
11 | Patrolling of Steel & MDPE Network |
12 | Scope Include: • To carry out emergency patrol, for the section / network vulnerable to damage due to sudden development of activities by other utilities. • To wear PPEs like safety shoes, cotton dress and reflective jacket • To carry out patrolling by driving the vehicle along the pipeline route, as per, as-built drawing, markers and valve chamber position, observing activities on pipeline as per check list, like excavation, construction, encroachment, • To coordinate and monitor with external agencies working on charged network of IOAGPL as per permissions issued on pipeline route. • To understand their work, extent of excavation and its potential hazard to underground gas pipeline • To explain them, about the gas pipeline network / route and precautions to be taken to prevent damage to gas pipelines. • To provide / update them with contact number and other details of IOAGPL authorised EIC for assistance. • To collect details of their supervisor like contact number, address etc for further coordination • To prepare report in standard format • Report immediately any unusual developments or occurrences along a pipeline route which may have some effect on the normal operation or maintenance of the pipeline |
13 | LPT of Network |
14 | LPT of Steel/MDPE Network (per KM) - Upstream of Service Regulator |
15 | LPT of LP Network (per SR/section) - Downstream of Service Regulator |
16 | LDT of Network |
17 | LDT of Steel/MDPE Network (per KM) - Upstream of Service Regulator |
18 | LDT of LP Network (per SR/section) - Downstream of Service Regulator |
19 | Monitoring of Pressure / Flow of CGS |
20 | Monitoring of Odorant system parameters |
21 | Monitoring readings at TRU |
22 | Earting Reading of DRS/MRS |
23 | Third Party works Monitoring On IOAGPL pipe line |
24 | Post Commissioning Services |
25 | Annual Maintenance Service |
26 | Annual Maintenance of PNG |
27 | AMC of PNG Domestic Connection including sand filling and cementing of RCC guard if required. (LPT, Anomalies identification, Leakage identification & rectification, Checking of service line,Painting touch up of GI pipe, RCC Guard, GI Clamp,Repalcement of Surakaha hose in case of damaged, expired for all Points etc. |
28 | AMC of PNG commercial/Non Commercial Connection. (Anomalies identification, Leakage identification & rectification, checking of service line. Painting touch up of GI pipe as per IOAGPL EIC instruction, RCC Guard, GI Clamp replacement / installation as per EIC instruction, Repalcement of Surakaha hose if required IOAGPL EIC instruction if any in case of damaged, expired for all Points etc. |
29 | Repainting of GI pipe, RCC Guard and GI Clamp of entire connection including supply of paint, |
30 | Annual maintenance of vertical riser |
31 | AMC of Vertical Riser including horizontal approach upto G+3 floors -including sand filling and cementing of RCC guard if required.Painting touch up of GI pipe, RCC Guard, GI Clamp |
32 | Re-painting of complete GI pipe Riser including lateral Upto G+3 floors, |
33 | AMC of Vertical.Riser including horizontal approach each floor above 3rd Floor -.Painting touch up of GI pipe, RCC Guard, GI Clamp |
34 | Re-painting of entire GI pipe on V.Riser "each floor" above 3rd Floor |
35 | Annual maintenance of Common Horizontal |
36 | AMC of Horizontal header Upto 3 houses -including sand filling and cementing of RCC guard if required.Painting touch up of GI pipe, RCC Guard, GI Clamp |
37 | Re-painting of complete GI pipe on Horizontal header Upto 3 houses |
38 | AMC of Horizontal header for each house beyond 3 houses - |
39 | Painting of GI pipe on Horizontal header for "each house" beyond 3 houses.Painting touch up of GI pipe, RCC Guard, GI Clamp including paint and other materials needed |
40 | O&M services |
41 | Replacement of equipment/fittings. |
42 | Replacement of Dom., Com., Ind. Regulator/Diaphragm meter, Brass ball valve/Gas tap, |
43 | Replacement transition fittings or RCC guard or both (Rates are excluding material charges) |
44 | Replacement of Industrial / Commercial Meter- RPD |
45 | IOAGPL supplied Suraksha Hose replacement including supply and installation of rubber hose clamp-Domestic PNG connection- Other than identifed during domestic AMC |
46 | Installation of new GI for alteration/additional point (excluding contractor supplied materials rates )/ Re-fitting of GI |
47 | Installation of new 1/2" GI Pipe, SOR rate to be paid for either actual or minimum 3 m length for services and materials whichever is higher.. |
48 | Installation of 1" new GI Pipe, SOR rate to be paid for either actual or minimum 3 m length for services and materials whichever is higher. |
49 | Supply & Installation of PVC Sleeve on GI Pipe with Insulation |
50 | Installation of GI Pipeline Protection Clamp from door or window. |
51 | Installation of only Rubber Tube Clamp |
52 | Installtion of 1/2"new GI Powder Coated Clamp |
53 | Installtion of 1"new GI Powder Coated Clamp |
54 | Installation of Burner Jet |
55 | Dismantling |
56 | Dismantling of1/2"/ 1" GIPipe - SOR rate to be paid for either actual or minimum 3 m length whichever is higher. |
57 | Dismantling of Powder coated 1/2" / 1" GI Riser - SOR rate to be paid for either actual or minimum 3 m length whichever is higher. |
58 | Drilling of through Hole with Drilling Machine, |
59 | Drilling of Hole in Brick / plastering |
60 | Drilling of Hole in RCC |
61 | Drilling of Hole in Others (Marble ,Granite etc.) |
62 | Modification of RCC Guard |
63 | Modification of RCC Guard with PE Squeezing |
64 | Modification of RCC Guard without PE Squeezing |
65 | Conversion of Burner |
66 | NG Conversion charges for 2 burner |
67 | NG Conversion charges for beyond 2 burner |
68 | Installation of Marker |
69 | Installation of RCC Route Marker incl PCC Foundation on PE Network |
70 | Stenciling/repainting of existing marker |
71 | Meter Reading |
72 | Meter Reading - Comm / Non Commercial or Industrial customer for varification as and when required |
73 | Meter Reading - Domestic customer for varification as and when required |
74 | Civil work (including hard barricading) |
75 | Supply & Lay PCC 1:2:4 for PNG O&M |
76 | Supply & Lay PCC 1:4:8 for PNG O&M |
77 | Supply & Lay RCC 1:1.5:3 Including Reinforcement for PNG O&M |
78 | Sand Filling activity for Service Regualtor Module or PE Valve Chamber |
79 | supply & Const. Brick work |
80 | Supply & Const.Plastering |
81 | Supply & Installation of structuralsteel Including fabrication |
82 | Demolishing of existing Valve Chamber |
83 | Dismantling of existing Transition Box/Service regulator of any size including PE connectivity. Services includes supply of labour,Excavation,isolation of valves and pipe lines,Demolition of foundation and transportation of removed Service regulator module to IOAGPL store/Place instructed by IOAGPL EIC |
84 | Supply & Laying of Half Round 6" RCC Hume Pipe |
85 | Supply & Laying of RCC Hume pipes 6" for cross including collar |
86 | Installation ofIOAGPL Supplied Canopy of ServiceRegualtor Moduleof any size Including Transportation, Civil Foundation& painting,shifting of removed canopy to IOAGPL store/Place instructed by IOAGPL EIC |
87 | Supply and Installation of Valve chamber sleeper - all sizes |
88 | Installation of SR module |
89 | Installation of SR Module B-10/25/50 Including Excavation,Required PE Material,Sand fillingand Civil work with Painting on Foundation. |
90 | Regualtor Replacement in SR Module |
91 | 1"" Ball Valve replacement in SR Module |
92 | Boundary Fencing (WIRE MESH) installation for DRS/CPRS/MRS/IMS/CGSincluding supply of material |
93 | Miscellaneous Jobs |
94 | Installation IOAGPL supplied Gas tap and rubber tube installation |
95 | Temporary Disconnection/Force disconnection for each house only Meter |
96 | Permanent/Temporary/Force Disconnection for each house from PE or TF |
97 | Reconnection for each house only meter |
98 | Reconnection for each house from PE or TF without refitting in GI pipe |
99 | Reconnection /Force Disconnectionusing Petzl for each house |
100 | Installation of hollow hex plug |
101 | Painting of Valve chamber & Valve including Inside White washing and strencilling on top cover at three Locations- Top cover,Inside, Outside including paint and other materials needed |
102 | Painting - including scraping /cleaning,one coat of epoxy zinc rich primer,Two coat of polyamide epoxy and two coat of acrylic polyurethene(PU Paint) including paint and other materials needed |
103 | Stencilling ---Letter writing including supply of Paint |
104 | Lifting of RCC guard including Excavation, modification in PE line using 2 EF joints (1 for PE and another for TF), refittings of existing RCC guard |
105 | MRS/IMS maintenance |
106 | MRS/IMS maintenance including filtercleaning, Stainer cleaning,Valve replacement other than 110 mbar skid |
107 | Replacement at IMS of below Items as & when required. 1)Meter 2)EVC 3)Battery 4)Modem & power supply. |
108 | Dismantling of MRS/IMS (including transportation) |
109 | Hiring of equipment |
110 | Hiring of JCB for excavation |
111 | Hiring of Hydra |
112 | Hiring of Compressor for Flushing & testing |
113 | Hiring of Tractor for shifting of excavated material |
114 | PE pipeline shifting and lowering including Installation of Electrofusion fitting if any |
115 | Installation of PE pipeline Receiving, handling, loading, transportation and unloading including owner supplied PE pipes and Electro fusion Fittings from owner"s designated stock yards. Proper storing, stacking, identification, providing security, and insurancecoverforthematerials. LiasoningwithLandowningagencies/statutory authorities, , temporary restoration of the abandoned trial pitsas required (excavation to depth as per specification ) to original condition. barricading the work area as per the procedures&drawingsprovidedinthetenderandasperthedirectionsofEIC/site- incharge.Trenching to the required depth in all types of terrain, uncoiling / stringing of pipes, damping, jointing of the pipe ends/ fittings/ valves by qualified personnel, using bar coded electro fusion techniques as per specification. Rates includes excavation as per tender specification and all contractor supplied materialotherthanIOAGPLfreeissuematerialasmentionedin tender document in all types of terrain excuding rocky terrain. |
116 | Inst, Test, Com of 90 mm, 110mm & 125mm ODXSDR 17.6 |
117 | Inst, Test, Com of 32 mm & 63mm OD, SDR 11 & 17.6 |
118 | Inst, Test, Com of 20 mm ODXSDR 9 |
119 | Hook up of PE with DRS/CPRS/DPRC/IMS feeder |
120 | Hook up of PE with DRS/CPRS/DPRC/IMS feeder |
121 | Reinstatement of PE pipeline to its original condition & Supply & filling of fine sand for bedding & covering, supply & Installation of warning tape with complete restoration and water compaction |
122 | PE pipe per meter |
123 | PE Pipe Line Testing & Flushing including supply of N2 (Applicable if water enters into PE Pipe Line Section due to Third Party Damage), Rock & RCC Breaking, Boring - Manually & HDD, Ins. Of EF Fittings |
124 | Flushing & Testing of PE Pipe Line - 32 MM to 63 MM |
125 | Flushing & Testing of PE Pipe Line - 90 MM to 160 MM |
126 | Excavation, Removal out of PE Pipeline |
127 | Trenchless crossing for any pipe dia.-Manual Boring normal soil |
128 | Trenchless crossing for any pipe dia. - HDD normal soil |
129 | Trenchles crossing for any pipe dia. - HDD Rocky strata |
130 | Rock Breaking |
131 | Breaking of PCC |
132 | Breaking of RCC |
133 | Construction of Valve Chamber all Sizes (MDPE) |
134 | Earting chamber repairing of DRS/MRS |
135 | Anaconda Replacement with Bush-Adaptor Fittings |
136 | Removal of anaconda and installation of Bush-adaptor fittings |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail