}

Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Ioagpl Chandigarh Ga, Ghaziabad-Uttar Pradesh

IndianOil Adani Gas Private Limited-IOAGPL has published Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Ioagpl Chandigarh Ga. Submission Date for this Tender is 25-03-2024. Civil Work Tenders in Ghaziabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42762845
Corrigendum : Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Ioagpl Chandigarh Ga
Open Tender
Indian
Uttar Pradesh
Ghaziabad
25-03-2024

Tender Details

Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Ioagpl Chandigarh Ga

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 18-Mar-2024 BID EXTENSION Date 25-03-2024

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: ANNUAL RATE CONTRACT FOR PE PNG OPERATION AND MAINTENANCE WORKS AT IOAGPL CHANDIGARH GA
Sl. No. Item Description
1Attending leakage complaint/maintenance from TF to Appliance (Gas Stove) of PNG connection (GI installation)
2Attending Gas Leakage complaint from TF to Appliance (Gas Stove) with all tools, tackles and consumbales. Scope includes checking of leakage at joints with Soap Solution/Gas Detector, attending leakage, painting touch up work, Prepration of report as per format provided by IOAGPL.Sufficient crew/Manpower shall be available at site and should attend the leakage within 30 minutes of complaint reporting time.Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe/fittings etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be bidder scope. Consumables shall include but not limited to GI powder coated clamps, Teflon Tape, "O" ring, etc.
3MDPE damage recification/repair & maintenance work (upto 63 mm Dia)
4Scope inculdes attending MDPE leakage complaint (Up to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor
5MDPE damage recification/repair & maintenance work (above 63 mm Dia)
6Scope inculdes attending MDPE leakage complaint (above to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor
7MDPE Valve Chamber Cleaning, Maintenance, etc.
8Scope include deployment of manpower with all Tools, Tackles, Machinery, etc. (i.e. Mud Motor, Generator, etc) for cleaning of MDPE Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC.
9Attending Service Regulator leakage complaint, Repair, Maintenance, etc.
10Scope Include attending SR box leakage complaint, Reapair, Replacement, etc. within 30 min of complaint report time with all the tools, tackles and consumables, rectification of leakage, prepration of reprot as per format provided by IOAGPL. Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe, Fittings, Regulator, etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be contractor scope.Works shall be executed as per instruction and satisfaction of EIC/SIC.
11Patrolling of Steel & MDPE Network
12Scope Include: • To carry out emergency patrol, for the section / network vulnerable to damage due to sudden development of activities by other utilities. • To wear PPEs like safety shoes, cotton dress and reflective jacket • To carry out patrolling by driving the vehicle along the pipeline route, as per, as-built drawing, markers and valve chamber position, observing activities on pipeline as per check list, like excavation, construction, encroachment, • To coordinate and monitor with external agencies working on charged network of IOAGPL as per permissions issued on pipeline route. • To understand their work, extent of excavation and its potential hazard to underground gas pipeline • To explain them, about the gas pipeline network / route and precautions to be taken to prevent damage to gas pipelines. • To provide / update them with contact number and other details of IOAGPL authorised EIC for assistance. • To collect details of their supervisor like contact number, address etc for further coordination • To prepare report in standard format • Report immediately any unusual developments or occurrences along a pipeline route which may have some effect on the normal operation or maintenance of the pipeline
13LPT of Network
14LPT of Steel/MDPE Network (per KM) - Upstream of Service Regulator
15LPT of LP Network (per SR/section) - Downstream of Service Regulator
16LDT of Network
17LDT of Steel/MDPE Network (per KM) - Upstream of Service Regulator
18LDT of LP Network (per SR/section) - Downstream of Service Regulator
19Monitoring of Pressure / Flow of CGS
20Monitoring of Odorant system parameters
21Monitoring readings at TRU
22Earting Reading of DRS/MRS
23Third Party works Monitoring On IOAGPL pipe line
24Post Commissioning Services
25Annual Maintenance Service
26Annual Maintenance of PNG
27AMC of PNG Domestic Connection including sand filling and cementing of RCC guard if required. (LPT, Anomalies identification, Leakage identification & rectification, Checking of service line,Painting touch up of GI pipe, RCC Guard, GI Clamp,Repalcement of Surakaha hose in case of damaged, expired for all Points etc.
28AMC of PNG commercial/Non Commercial Connection. (Anomalies identification, Leakage identification & rectification, checking of service line. Painting touch up of GI pipe as per IOAGPL EIC instruction, RCC Guard, GI Clamp replacement / installation as per EIC instruction, Repalcement of Surakaha hose if required IOAGPL EIC instruction if any in case of damaged, expired for all Points etc.
29Repainting of GI pipe, RCC Guard and GI Clamp of entire connection including supply of paint,
30Annual maintenance of vertical riser
31AMC of Vertical Riser including horizontal approach upto G+3 floors -including sand filling and cementing of RCC guard if required.Painting touch up of GI pipe, RCC Guard, GI Clamp
32Re-painting of complete GI pipe Riser including lateral Upto G+3 floors,
33AMC of Vertical.Riser including horizontal approach each floor above 3rd Floor -.Painting touch up of GI pipe, RCC Guard, GI Clamp
34Re-painting of entire GI pipe on V.Riser "each floor" above 3rd Floor
35Annual maintenance of Common Horizontal
36AMC of Horizontal header Upto 3 houses -including sand filling and cementing of RCC guard if required.Painting touch up of GI pipe, RCC Guard, GI Clamp
37Re-painting of complete GI pipe on Horizontal header Upto 3 houses
38AMC of Horizontal header for each house beyond 3 houses -
39Painting of GI pipe on Horizontal header for "each house" beyond 3 houses.Painting touch up of GI pipe, RCC Guard, GI Clamp including paint and other materials needed
40O&M services
41Replacement of equipment/fittings.
42Replacement of Dom., Com., Ind. Regulator/Diaphragm meter, Brass ball valve/Gas tap,
43Replacement transition fittings or RCC guard or both (Rates are excluding material charges)
44Replacement of Industrial / Commercial Meter- RPD
45IOAGPL supplied Suraksha Hose replacement including supply and installation of rubber hose clamp-Domestic PNG connection- Other than identifed during domestic AMC
46Installation of new GI for alteration/additional point (excluding contractor supplied materials rates )/ Re-fitting of GI
47Installation of new 1/2" GI Pipe, SOR rate to be paid for either actual or minimum 3 m length for services and materials whichever is higher..
48Installation of 1" new GI Pipe, SOR rate to be paid for either actual or minimum 3 m length for services and materials whichever is higher.
49Supply & Installation of PVC Sleeve on GI Pipe with Insulation
50Installation of GI Pipeline Protection Clamp from door or window.
51Installation of only Rubber Tube Clamp
52Installtion of 1/2"new GI Powder Coated Clamp
53Installtion of 1"new GI Powder Coated Clamp
54Installation of Burner Jet
55Dismantling
56Dismantling of1/2"/ 1" GIPipe - SOR rate to be paid for either actual or minimum 3 m length whichever is higher.
57Dismantling of Powder coated 1/2" / 1" GI Riser - SOR rate to be paid for either actual or minimum 3 m length whichever is higher.
58Drilling of through Hole with Drilling Machine,
59Drilling of Hole in Brick / plastering
60Drilling of Hole in RCC
61Drilling of Hole in Others (Marble ,Granite etc.)
62Modification of RCC Guard
63Modification of RCC Guard with PE Squeezing
64Modification of RCC Guard without PE Squeezing
65Conversion of Burner
66NG Conversion charges for 2 burner
67NG Conversion charges for beyond 2 burner
68Installation of Marker
69Installation of RCC Route Marker incl PCC Foundation on PE Network
70Stenciling/repainting of existing marker
71Meter Reading
72Meter Reading - Comm / Non Commercial or Industrial customer for varification as and when required
73Meter Reading - Domestic customer for varification as and when required
74Civil work (including hard barricading)
75Supply & Lay PCC 1:2:4 for PNG O&M
76Supply & Lay PCC 1:4:8 for PNG O&M
77Supply & Lay RCC 1:1.5:3 Including Reinforcement for PNG O&M
78Sand Filling activity for Service Regualtor Module or PE Valve Chamber
79supply & Const. Brick work
80Supply & Const.Plastering
81Supply & Installation of structuralsteel Including fabrication
82Demolishing of existing Valve Chamber
83Dismantling of existing Transition Box/Service regulator of any size including PE connectivity. Services includes supply of labour,Excavation,isolation of valves and pipe lines,Demolition of foundation and transportation of removed Service regulator module to IOAGPL store/Place instructed by IOAGPL EIC
84Supply & Laying of Half Round 6" RCC Hume Pipe
85Supply & Laying of RCC Hume pipes 6" for cross including collar
86Installation ofIOAGPL Supplied Canopy of ServiceRegualtor Moduleof any size Including Transportation, Civil Foundation& painting,shifting of removed canopy to IOAGPL store/Place instructed by IOAGPL EIC
87Supply and Installation of Valve chamber sleeper - all sizes
88Installation of SR module
89Installation of SR Module B-10/25/50 Including Excavation,Required PE Material,Sand fillingand Civil work with Painting on Foundation.
90Regualtor Replacement in SR Module
911"" Ball Valve replacement in SR Module
92Boundary Fencing (WIRE MESH) installation for DRS/CPRS/MRS/IMS/CGSincluding supply of material
93Miscellaneous Jobs
94Installation IOAGPL supplied Gas tap and rubber tube installation
95Temporary Disconnection/Force disconnection for each house only Meter
96Permanent/Temporary/Force Disconnection for each house from PE or TF
97Reconnection for each house only meter
98Reconnection for each house from PE or TF without refitting in GI pipe
99Reconnection /Force Disconnectionusing Petzl for each house
100Installation of hollow hex plug
101Painting of Valve chamber & Valve including Inside White washing and strencilling on top cover at three Locations- Top cover,Inside, Outside including paint and other materials needed
102Painting - including scraping /cleaning,one coat of epoxy zinc rich primer,Two coat of polyamide epoxy and two coat of acrylic polyurethene(PU Paint) including paint and other materials needed
103Stencilling ---Letter writing including supply of Paint
104Lifting of RCC guard including Excavation, modification in PE line using 2 EF joints (1 for PE and another for TF), refittings of existing RCC guard
105MRS/IMS maintenance
106MRS/IMS maintenance including filtercleaning, Stainer cleaning,Valve replacement other than 110 mbar skid
107Replacement at IMS of below Items as & when required. 1)Meter 2)EVC 3)Battery 4)Modem & power supply.
108Dismantling of MRS/IMS (including transportation)
109Hiring of equipment
110Hiring of JCB for excavation
111Hiring of Hydra
112Hiring of Compressor for Flushing & testing
113Hiring of Tractor for shifting of excavated material
114PE pipeline shifting and lowering including Installation of Electrofusion fitting if any
115Installation of PE pipeline Receiving, handling, loading, transportation and unloading including owner supplied PE pipes and Electro fusion Fittings from owner"s designated stock yards. Proper storing, stacking, identification, providing security, and insurancecoverforthematerials. LiasoningwithLandowningagencies/statutory authorities, , temporary restoration of the abandoned trial pitsas required (excavation to depth as per specification ) to original condition. barricading the work area as per the procedures&drawingsprovidedinthetenderandasperthedirectionsofEIC/site- incharge.Trenching to the required depth in all types of terrain, uncoiling / stringing of pipes, damping, jointing of the pipe ends/ fittings/ valves by qualified personnel, using bar coded electro fusion techniques as per specification. Rates includes excavation as per tender specification and all contractor supplied materialotherthanIOAGPLfreeissuematerialasmentionedin tender document in all types of terrain excuding rocky terrain.
116Inst, Test, Com of 90 mm, 110mm & 125mm ODXSDR 17.6
117Inst, Test, Com of 32 mm & 63mm OD, SDR 11 & 17.6
118Inst, Test, Com of 20 mm ODXSDR 9
119Hook up of PE with DRS/CPRS/DPRC/IMS feeder
120Hook up of PE with DRS/CPRS/DPRC/IMS feeder
121Reinstatement of PE pipeline to its original condition & Supply & filling of fine sand for bedding & covering, supply & Installation of warning tape with complete restoration and water compaction
122PE pipe per meter
123PE Pipe Line Testing & Flushing including supply of N2 (Applicable if water enters into PE Pipe Line Section due to Third Party Damage), Rock & RCC Breaking, Boring - Manually & HDD, Ins. Of EF Fittings
124Flushing & Testing of PE Pipe Line - 32 MM to 63 MM
125Flushing & Testing of PE Pipe Line - 90 MM to 160 MM
126Excavation, Removal out of PE Pipeline
127Trenchless crossing for any pipe dia.-Manual Boring normal soil
128Trenchless crossing for any pipe dia. - HDD normal soil
129Trenchles crossing for any pipe dia. - HDD Rocky strata
130Rock Breaking
131Breaking of PCC
132Breaking of RCC
133Construction of Valve Chamber all Sizes (MDPE)
134Earting chamber repairing of DRS/MRS
135Anaconda Replacement with Bush-Adaptor Fittings
136Removal of anaconda and installation of Bush-adaptor fittings
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail