Tender For Construction Of R.C.C Slope Structure With Retaining Wall , Pedastal Wall , Staircase , Cut-Off Wall And Bouldar Pitching At Yamuna River Bank (1St Stage) New Singhwahini Pump Canal ., banda-Uttar Pradesh

Irrigation Department has published Tender For Construction Of R.C.C Slope Structure With Retaining Wall , Pedastal Wall , Staircase , Cut-Off Wall And Bouldar Pitching At Yamuna River Bank (1St Stage) New Singhwahini Pump Canal .. Submission Date for this Tender is 12-03-2024. Pump Supply Tenders in banda Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42744506
Tender For Construction Of R.C.C Slope Structure With Retaining Wall , Pedastal Wall , Staircase , Cut-Off Wall And Bouldar Pitching At Yamuna River Bank (1St Stage) New Singhwahini Pump Canal .
Open Tender
Indian
Uttar Pradesh
banda
12-03-2024

Tender Details

Construction Of R.C.C Slope Structure With Retaining Wall , Pedastal Wall , Staircase , Cut-Off Wall And Bouldar Pitching At Yamuna River Bank (1St Stage) New Singhwahini Pump Canal .

Key Value

Document Fees
INR 2354 /-
EMD
INR 893000.0 /-
Tender Value
INR 4.46 Crore /-

BOQ Items

Name of Work: Construction ofR.C.C Slope structure with Retaining wall , Pedastal wall , Staircase , Cut-offwall and Bouldar pitching at Yamuna river bank (1st Stage) New Singhwahini pump canal .
Sl. No. Item Description
1Supplying and Filling Of old/used Empty Cement bages with local earth from 1.00 km lead by tractor i/c sewing with sutli, placing within 60m in position, t&p, labour, Royality all taxes etc complete in all respect including cost of old/used Emoty Cement bags.
2Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required level and slopes and also including 1.50 m lift and 0.195 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
3Hiring of Diesel pumps 5HP including operator and POL for Dewatering required for proper completion of work.
4Earth work in foundation in dry soil including lift up to 1.50 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-Charge.
5Shuttering for Concrete including cost of Shuttering labour and T&P etc. Complete.
6Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20mm down graded stone grit including cost of all material, labour and T&P etc. Complete but excluding cost of Shuttering.
7Laying C.C. 1:1:2 Mix (M-25) Cement, Coarse Sand & 20mm down graded stone grit including cost of all material, labour and T&P etc. Complete but excluding cost of Shuttering.
8Laying C.C. 1:0.75:1.5 Mix (M-30) Cement, Coarse Sand & 20mm down graded stone grit including cost of all material, labour and T&P etc. Complete but excluding cost of Shuttering.
9Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. Complete.
10S/F of 25 mm thick joint filler board (Shalitax) for expansion joint in raft, cable trench, and R wall including all labour & T&P etc. required for proper completion of work.
11Supply and Laying dry stone boulder (size 40-60 kg) in launching apron as directed by Engineer-in-Charge and also including cost of all material, labour and T&P etc.
12Providing 8 S.W.G. wire crates ( size 2.0m x 1.5mx0.6m) with 15 cm mesh and packing with dry stone boulders (size 20-40 kg.) as directed by Engineer-in-Charge including all Cost of materials, T&P, labour, Royality & all taxes etc Complete etc Complete in all respect.
13Supply and Laying Course sand (moorum) in filter below pitching including cost of all material, labour and T&P etc.
14Supply and Laying 4.75mm - 10 mm coarse aggregate in filter below pitching including cost of all material, labour and T&P etc..
15Laying boulder pitching (R.R.) in 1:4 CM with 40-60 Kg. stone boulder including cost of all material, T&P and labour etc. required for proper Completion of work.
16Cement pointing 1:2 (struck flush ) on stone masonry including all cost of material, labour and T&P etc. required for proper completion of work.
17Earth work in removal of Coffar Dam & Cross bar including all lead & lift with its proper disposal as per direction of Engineer-in-including cost of labour & T&P etc. Compete
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail