Municipal Corporation-MC has published Tender For Completion Of Development Work In Daksh Parjapati Dharmshala/ Community Center Meham (Rohtak). Submission Date for this Tender is 15-03-2024. Civil Work Tenders in Rohtak Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 |
2 | [11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) |
3 | [17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam - II with Screening Type A / Type B Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications |
4 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. |
5 | [17.8.1]Compaction 1. Extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling |
6 | [17.8.2]Compaction 2. Extra for watering the earth/fly ash laid in 20 cm layers as per specifications |
7 | [17.8.3]Compaction 3. Extra for rolling to specifications |
8 | [3.1.1]By Mechanical Transport including loading, unloading and stacking1. Lime, moorum, building rubbish |
9 | [3.1.1]By Mechanical Transport including loading, unloading and stacking1. Lime, moorum, building rubbish |
10 | [3.1.2]By Mechanical Transport including loading, unloading and stacking2. Earth |
11 | [3.1.2]By Mechanical Transport including loading, unloading and stacking2. Earth |
12 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail