Rural Development And Panchayats Department has published Block Topping To Samathuva Burial Ground Approach Road In Ohaiperayur Panchayat2. Construction Of Cremation Shed At Samathuva Burial Ground Ohaiperayurpanchayat3.Construction Of Cc Road At Nakarajakottakam Habitation In Ohaiperaiyur Panchayat4.Constructio. Submission Date for this Tender is 11-03-2024. Road Work Tenders in Thiruvarur Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | 1.Block Topping to Samathuva Burial ground Approach Road in Ohaiperayur Panchayat |
2 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2min hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A |
3 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal@20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method). |
4 | Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetalconsisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place |
5 | Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm |
6 | Applying TACK COATover WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. |
7 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumenfor pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete |
8 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, wateringand compacting by Power roller to achieve the required Proctor density at 100% compaction |
9 | Provision forNameboar charges |
10 | 2. CONSTRUCTION OF CREMATION SHED AT SAMATHUVA BURIAL GROUND OHAIPERAYURPANCHAYAT |
11 | Drilling for Pile foundation RCC 1:1.5:3 mix using 20 mm is HBG metal 230 mm dia including etc all |
12 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
13 | Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. |
14 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
15 | Cement mortar 1:2:4 mix using 2 0mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
16 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete |
17 | Below |
18 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
19 | basement |
20 | Superstructure grund floor |
21 | Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. |
22 | basement |
23 | Superstructure grund floor |
24 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works |
25 | Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
26 | Plastering with cement mortar 1:5mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
27 | Floor Top roof with MACHINE PRESSED TILES cost and conveyance of all materials to site and all labour charges etc complete |
28 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification |
29 | Provision forNameboar charges |
30 | compound wall |
31 | Drilling for Pile foundation RCC 1:1.5:3 mix using 20 mm is HBG metal 230 mm dia including etc all |
32 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
33 | Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification. |
34 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
35 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete |
36 | Below |
37 | above |
38 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
39 | basement |
40 | Superstructure grund floor |
41 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works |
42 | Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. |
43 | basement |
44 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
45 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification |
46 | 3.Construction of cc road at nakarajakottakam habitation in ohaiperaiyur panchayat |
47 | Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for for foundation upto 0.30 m depth |
48 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
49 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
50 | Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete |
51 | Cement Concrete.1:3:6 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
52 | Cement Concrete.1:2:4 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
53 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
54 | Provision for tar pad |
55 | Provision forNameboar charges |
56 | 4.Construction ofcc road at Anna colony Ohaiperaiyur habitation in ohaiperaiyur panchayat-38 m |
57 | Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for for foundation upto 0.30 m depth |
58 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
59 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
60 | Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete |
61 | Cement Concrete.1:3:6 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
62 | Cement Concrete.1:2:4 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
63 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
64 | Provision for tar pad |
65 | Provision forNameboar charges |
66 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} |