|
| 1 | Clearing and grubbing road land including uprooting wild vegetation,grass,bushes,shrubs,saplingsand trees of girth upto 300 mm, removal of stumps of such treescutearlierand disposal of unserviceablematerials and stacking of serviceable material to beused or auctioned, upto a lead of 1000 m includingremoval and disposal of top organic soil notexceeding 150 mm in thickness as per Technical SpecificationsClause201forRuralRoadsofMORD.(I) By ManualMeans.a)Inareaofnon-thornyjungleFor M.V. Ground. |
| 2 | Hireandlabourchargesforerectionofpandelforcountersof distribution and receiving of polling materials with strong sallballha/bamboostructurewithtarpaulinshed,3sidecover withbluedrill,frontandbothsidetopcoverwithbluedrill, ceilingwithcloth,lowheightpartitionwithbambooframeand cloth for all sides of each counter including bamboo barricade as required in front and all side of counter. Including provision of 3 chairsandOneNo(4’x3’size)tablesineachcounterand cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Upto 4 Days. |
| 3 | Hire and labour charges for erection of pandel for other counters with strong Salballah/ bamboo structure with tarpaulin shed with clothceilingbacksidefullcoverwithbluedrill,frontandboth side top cover with blue drill, front and both side cover with 3’-0’’ highlowheightpartitionwithbothsideclothincludingbamboo structure and bamboo barricade as required. Including provision ofOne (4’ x 3’ size) table & 2 chairs in each counter including cutting drain in all side counters and cutting drain in all side of countersanddressing,chilchillingandcleaningcounterarea complete. Upto 4 Days. |
| 4 | Hireandlabourchargesforerectionofpandelwithstrongsal ballah/bamboostructurewithtarpaulinshedincludingceiling with cloth including bamboo barricade as required With front and bothsidetopcoverwithbluedrillincluding andcuttingdraininallsideofcountersand dressing, chilchilling and cleaning counter area complete. Upto 4 Days) With 3 side cover with hessian/Terpolin. |
| 5 | Hireandlabourchargesforerectionofpandelwithstrongsal ballah /bamboo structure with CGI shed including ceiling including bamboo barricade as required includingcuttingdraininallsideof counters and dressing, chilchillingandcleaningcounter areacomplete.Upto4 Days. a) With 4 side cover with CGI sheet |
| 6 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 7 | Hireandlabourchargesforerectionofpandelwithstrongsal ballah/bamboostructurewithtarpaulinshedincludingceiling with cloth including bamboo barricade as required with front and bothsidetopcoverwithbluedrillincludingcuttingdraininall sideofcounters and dressing, chilchilling and cleaning counter area complete. Upto 4 Days Withoutside cover. |
| 8 | Hire and labour charges for erection of tarpaulin side cover with bamboo structure complete upto 4 days |
| 9 | HireandlabourchargesforerectionofCGIsheetcoverwith bamboo structure completeupto 4 days |
| 10 | Hireandlabourchargesforerectionofbamboo/sal ballah(3”/4”dia)barricadeincludingfittingandfixingcomplete upto 4 days a) Above 3’ upto 6’ high with 4 rows of bamboo |
| 11 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 12 | Hireandlabourchargesforsealingofwindowsanddoorsfor strong room including fitting and fixing and striking out the same complete:-a)Withwoodenplanksincludingnecessarybattons including poly sheet covering etc. complete upto 4 days |
| 13 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 14 | b) With CGI sheet including necessary supports etc. complete upto 4 days |
| 15 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 16 | Hire and labour charge of Hessian complete upto 4 days. |
| 17 | Hire and labour charge of carpet complete upto 4 days. |
| 18 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 19 | Hire and labour charge of Chairs with or without handle Armed moulded chair for 4 days. |
| 20 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 21 | Hire and labour charge of Clean Chair Covers with or without handle Armed moulded chair for 4 days. |
| 22 | Hire and labour charge of Sofa set for 4 days. |
| 23 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 24 | Hire and labour charge of Steel frame Deluxe chair for 4 days. |
| 25 | Hire and labour charge of Table (4’x3’ size) with plastic coated paper upto 4 days. |
| 26 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 27 | Hire and labour charge of Centre table for 4 days. |
| 28 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 29 | Hire and labour charge of Velvet curtain upto 4 days |
| 30 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 31 | Hire and labour charge of Ordinary curtain upto 4 days. |
| 32 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 33 | Hire and labour charges of collapsible gate including fitting fixing and making good damages after striking out the same complete. Upto 4 days |
| 34 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 35 | Hire and labour charges of Table cloth (White) upto 4 days |
| 36 | Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 37 | Hire charges of Bedding including Bed sheet, pillow, tosok, Mosquito net etc. upto 4 days |
| 38 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 39 | Hire charges of camp cot upto 4 days |
| 40 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 41 | Hire Charges of Use Me Dustbin upto 4 days |
| 42 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 43 | Hire Charges of Big size water drum upto 4 days |
| 44 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 45 | Hireandlabourchargesforproviding\"DropGate\"with15cm diasalbullahoflengthnotlessthan8meterincludinghoisting and fitting fixing with bolts and nuts to vertical posts (100 mm dia:2nosoneachflankembedded750mmbelowG.L)and providing counter load of concrete or stone or iron blockat the fulcrum,juteropeofnecessarylengthetccompleteincluding dismantling and removing the same. upto 4 days |
| 46 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 47 | Side walling where necessary with tarpolines,coloured cloths(good quality)as directed & with necessary bamboo frame work including fitting fixing and with stricking out immediately after completion of the work including mending good at DC- RC.as per direction of Officer-in-Charge. Upto 04 days |
| 48 | Hire & labour charges for supply & laying tarpoline for sitting arangement of Polling Personnel\"s & Police Personnel\"s at DC RC complete. For 04 Days |
| 49 | Hire & labour charges of Satranchi approved quality (size 12\" x 10\") for 4 days |
| 50 | Hire & labour charges for fitting fixing 4\" (four inch) dia Eucalyptusballa20\"(twentyfeet)overGLincludingfixing3\" (three feet) below GL digging ground as per direction for lighting arrangement at Vehicle Parking Ground for 4 days |
| 51 | -Do-Rate for Hire charges only 0n material Beyond 4 days Per Day |
| 52 | Hire & labour charges for supply , laying & top covering of truck/mini truck of good quality tarpoline(Patan) for sitting acangement of Polling Personnel\"s & Police Personnel\"s complete as per direction of 0-I-C.for 4 days |
| 53 | Flex framing with 2\" X 1.5\" wooden frame complete for 4 days |
| 54 | Flex including printing and fixing all complete. |
| 55 | Hire and labour charges for erection of temporary urinal (4’x3’size)withstrongbamboostructureincludingsidecover withpolythinsheettoallsideofurinalincludingearthwork& cutting drain etc. complete. Upto 4 days |
| 56 | Hire and labour charges for erection of temporary latrine (4’ X 3’ size) with strong bamboo structure including side cover with CGI SheettoallsideprovisionofonedoorandCGIsheetshed includingwoodenplatform,WCpanincludingexcavationof trenches etc..complete upto 4 days |
| 57 | Supplying,fittingandfixingPVCpipesofapprovedmakeof Schedule80(medium duty)conformingtoASTMD-1785and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross,elbo,nipple,longscrew,reducingsocket,reducingtee, short piece etc. fitted with holder bats clamps, including cutting pipes,makingthreads,fitting,fixingetc.completeinallrespect including cost of all necessary fittings as required,jointing materialsandtwocoatsofpaintingwithapprovedpaintinany position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Paymentforpaintingwillbemadeseperately)(A)ForExposed Work. PVC Pipes 15 mm dia. |
| 58 | B)ForExposed Work. PVC Pipes 20 mm dia. |
| 59 | Supplying, fitting and fixing self closing C.P. water tap of approved brand and make - 15 mm dia. |
| 60 | Dismantlingalltypesofmasonryexceptingcementconcrete plainorreinforced,stackingserviceablematerialsatsiteand removing rubbish as directed within a lead of 75 m.a) In ground floor including roof. |
| 61 | 125mm.thickFlyashbrickworkasperIS12894:2002in cementmortar(1:4)ingroundfloor.ExtraforusingapprovedH.B netting in every third layer |
| 62 | Supplying and laying Polythene Sheet (150gm / sq.m.) for window protection |
| 63 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar includingroundingofforchamferingcornersasdirectedand rakingoutjointsincludingthroating,nosinganddripcourse, scaffolding/stagingwherenecessary(Groundfloor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar.(b) 15 mm thick plaster |
| 64 | Supplying of stone dust including spreading and consolidation by power roller for movementof vehicles |
| 65 | Hire charge of JCB for dressing of area to make levelbase of land . |
| 66 | Removing of rubbish including cleaning the premises after completion of the work and to be disposed to a suitable locations as directed. |
| 67 | Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer\"s specification) including cleaning and smoothning of surface. Two Coats. |
| 68 | Taking out existing partition/ceiling of particle board, masonite board, ply board, soft board etc. of any thickness and refixing same in new position with necessary clamps making holes in walls, floor, roof and mending damages if any.[concrete plaster will be paid separately] |
| 69 | Making wooden ramp including side railing by the sal ballah / strong bamboo. Thickness of wooden platform not less than 2\". |
| 70 | Engagement of Daily Labour for shifting and reshifting of Desk, Bench and other materials, cleaning |
| 71 | GST @ 18% |
| 72 | CESS @ 1% |