Name of Work:Infrastructure Development of Cultural Centre at Pemaling Colony, Bomdila.
Sl. No.
Item Description
1
( SH:-RRM wall 3.00m Ht. - 60.00 mtr.Length )
2
Excavation for Structures.Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering) Ordinary Soil.Manual means(Depth upto 3.00m).
3
PCC 1:3:6 in Foundation.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
4
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification. A)Random Rubble Masonry.
5
Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification. A)Granular material.
6
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
7
( SH:-RRM wall 7.00m Ht. - 126.00 mtr Length )
8
Excavation for Structures.Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering) Ordinary Soil.Manual means(Depth upto 3.00m).
9
PCC 1:3:6 in Foundation.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
10
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification. A)Random Rubble Masonry.
11
Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification. A)Granular material.
12
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.