}

Extension Of Ht / Lt Line, Installation Of Distribution Sub-Station & For Providing Electric Service Connection To Un-Electrified House Hold Of Pvtg Under Chawmanurd Block Under Electrical Division Manu Ltv. Dhalai Tripura, dhalai-Tripura

Tripura State Electricity Corporation Limited-TSECL has published Extension Of Ht / Lt Line, Installation Of Distribution Sub-Station & For Providing Electric Service Connection To Un-Electrified House Hold Of Pvtg Under Chawmanurd Block Under Electrical Division Manu Ltv. Dhalai Tripura. Submission Date for this Tender is 11-03-2024. Overhead Line Tenders in dhalai Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

42669757
Corrigendum : Extension Of Ht / Lt Line, Installation Of Distribution Sub-Station & For Providing Electric Service Connection To Un-Electrified House Hold Of Pvtg Under Chawmanurd Block Under Electrical Division Manu Ltv. Dhalai Tripura
Open Tender
Indian
Tripura
dhalai
11-03-2024

Tender Details

Extension Of Ht / Lt Line, Installation Of Distribution Sub-Station & For Providing Electric Service Connection To Un-Electrified House Hold Of Pvtg Under Chawmanurd Block Under Electrical Division Manu Ltv. Dhalai Tripura-2 New 11 Kv Line : Support For 11 Kv Overhead Line As Per Technical Specification, Approved Drawings And Scope Of Work:- 3 9 Mtr. Long Pcc Poles - ( Pcc Pole As Per State Practice ) 4 Supply Of 11 Kv Line New Stay Set ( Galvanised ) With 50X8 Mm Stay Clamp, Guy Insulator, Anchor Plate ( 200X200x6mm ) , Nut Bolts, 2 Nos Turn-Buckles, 1.8 M Long, 20 Sq.Mm Diameter Solid Gi Stay Rod Complete As Per Technical Specification, Approved Drawings And Scope Of Work. 5 Supply Of 3 Phase 7 / 3.15 Mm Gi Strandedwire Complete As Per Technical Specification, Approved Drawings And Scope Of Work 6 Supply Of 3 Phase 11 Kv Line Using New Fabricated Hot Dip Galvanised Steel Items Like 1.2 Mtr Cross Arm For Sp ( 75X40x6mm ) , Top Bkt. Sp ( 75X40x6mm ) , Dp Line Bkt. ( 75X40x6mm ) , Sp Guard Bkt. ( 65X65x6 Mm ) , Dp Guardbkt. ( 65X65x6 Mm ) , Horizontal & Vertical Cross Bracing ( 65X65x6 Mm ) Mt For Over Headdouble Pole Etc Made Of Galvanised Channels / Angle For Over Head And 2.2 Mtr Cross Arm For Line Gos ( 75X40x6mm ) Structures As Per Technical Specification, Approved Drawings And Scope Of Work. 7 Supply Of Clamps Of Assorted Size Of Galvanised Flat ( 50X6 Mm ) 8 Galvanised Galvanised Nuts, Bolts With Washers As Per Technical Specification, Approved Drawings And Scope Of Work. 9 Supply Of 11 Kv, 3-Ph, 200 A, 3 Pin Type, Horizontal / Vertical Mounting Polymeric Type ( As Desired By Discom ) , Gang Operated, Ab Switch Along With Support Insulators, Base Channel, Down Pipe, Arcing Horns Etc. Complete Asper Technical Specifications, Scope Of Works And Approved Drawings 10 Supply Of 11 Kv, 3-Ph, 200 A, Horizontal / Vertical Mounting Polymeric Type ( As Desired By Discom ) , Drop-Out Fuse Along With Support Insulators, Base Channel Complete Asper Technical Specifications, Scope Of Works And Approved Drawings 11 11Kvpolymeric Disc Insulator 45 Kn 12 11Kvpolymeric Disc Iittings 13 11Kvpolymeric Pininsulator 45 Kn Along With Gi Pin 14 Supply Of Pg Clamps For Weasel 15 Acsr Weaselconductor ( 6 / 1 / 2.59 Mm ) 30 Sq.Mm 16 Supply Of G.I Wire8swg 17 Supply Of Danger Plate ( Ht ) 18 Supply Of Barbed Wire 19 Dtr Substation As Per Technical Specification, Approved Drawings And Scope Of Work. 20 Supplyoffollowing Dts With Bis Certified ( Label -2 ) 11 / 0.433- 0.250 Kv, 3 Phase, 50 Hz, Distribution Transformerconforming To Is : 1180 ( Part-I ) -2014 21 25 Kva ( 11 / .433 Kv ) 3-Phase 22 Supply Of 11 Kv, 3-Ph, 200 A, 3 Pin Type, Horizontal / Vertical Mounting Polymeric Type ( As Desired By Discom ) , Gang Operated, Ab Switch Along With Support Insulators, Base Channel, Down Pipe, Arcing Horns Etc. Complete Asper Technical Specifications, Scope Of Works And Approved Drawings 23 Supply Of 11 Kv, 3-Ph, 200 A, Horizontal / Vertical Mounting Polymeric Type ( As Desired By Discom ) , Drop-Out Fuse Along With Support Insulators, Base Channel Complete Asper Technical Specifications, Scope Of Works And Approved Drawings 24 Supply Of 11 Kv Polymeric Lightening Arrestor ( 9 Kv, 5 Ka ) For Distribition Transformer Asper Technical Specifications, Scope Of Works And Approved Drawings 25 11Kvpolymeric Disc Insulator 45 Kn 26 11Kvpolymeric Disc Fittings 27 11Kvpolymeric Pin Insulator10 Kn With Gi Pin. 28 Supply Of 11 Kv Line New Stay Set ( Galvanised ) With 50X8 Mm Stay Clamp, Guy Insulator, Anchor Plate ( 200X200x6mm ) , Nut Bolts, 2 Nos Turn-Buckles, 1.8 M Long, 20 Sq.Mm Diameter Solid Gi Stay Rod Complete As Per Technical Specification, Approved Drawings And Scope Of Work. 29 Supply Of 3 Phase 7 / 3.15 Mm Gi Strandedwire Complete As Per Technical Specification, Approved Drawings And Scope Of Work 30 Supply Of 3 Phase 11 Kv Line Using New Fabricated Hot Dip Galvanised Steel Items Like Transformmer Mounting Channels ( 2.8 M Long 75X50x50x6mm ) , Txr. Line Channel 2.8 M Long ( 100X50x 6 Mm ) Txr. Support Channel 0.8 M Long ( 100X50x50x6mm ) , Txr. Guardbracket 2.8 M Long ( 65X65x6 Mm ) , Etc Over Head Structures As Per Technical Specification, Approved Drawings And Scope Of Work. 31 Supply Of Clamps Of Assorted Size Of Galvanised Flat ( 50X6 Mm ) 32 Galvanised Ms Nuts, Bolts With Washers As Per Technical Specification, Approved Drawings And Scope Of Work. 33 Acsr Weaselconductor ( 6 / 1 / 2.59 Mm ) 30 Sq.Mm 34 Supply Of G.I Wire8swg 35 Supply Of Pg Clamps For Weasel 36 Supply Of 70 Sq.Mm Pvc Cable 37 Supply Of 70 Sq.Mm Bimetallic Lugs 38 Supply Of 16 Amps Cut-Out 39 Supply Of 100 Amps Cut-Out 40 Supply Of Danger Plate ( Ht ) 41 Supply Of Barbed Wire 42 New Lt Line Using Xlpe Ab Cable Support For Lt Overhead Line As Per Technical Specification, Approved Drawings And Scope Of Work:- 43 Supply Of 8.0 Mtr Long Pcc Poles ( Pcc Pole As Per State Practice ) 44 Supply Of 8.0 Mtr Steel Tubular Poles Including Welded Base Plate With Bottom Portion ( Sp-22 ) 45 Galvanised Stay Set With Anchor Plate ( 200X200x6mm ) , 50X8mm Stay Clamp, Stay Guy Insulator, Nut Bolts, 2 Nos Turn Buckles, 1.8 M Long, 16 Mm Diameter Solid Gs Stay Rod Etc As Required As Per Technical Specification, Approved Drawings And Scope Of Work. 46 Supply Of 3 Phase 7 / 3.15 Mm Gi Strandedwire Complete As Per Technical Specification, Approved Drawings And Scope Of Work 47 Supply Of The Following Lt Areal Bunched Cable:- 48 1X25 ( Ph ) + 1X25 ( Bare Messenger Cum Neutral ) + 1X16 ( Insulated Street Lighting ) Sq. Mm. 49 3X35 ( Ph ) + 1X35 ( Bare Messenger Cum Neutral ) + 1X16 ( Insulated Street Lighting ) Sq. Mm. 50 Supply Of Suspension Clamp Assembly With Straps & Buckle ( 25-50Mm ) 51 Supply Of Dead End Clamp Assembly With Straps & Buckle ( 25-50Mm ) 52 Supply Of Service Anchor Clamp Assembly With Straps & Buckle ( 18-50Mm ) 53 Supply Of Distribution Box 1-Phase ( 25 Mm / 50Mm ) 54 Supply Of Cable End Cap ( 25-30 Mm / 50Mm ) 55 Supply Of Cable Ties 56 Supply Of Eye Hook ( 25 Mm ) 57 Supply Of Pole Clamp ( 25 / 50 Mm ) 58 Supply Of Insulation Piercing Connector Main 16-95 Sq.Mm And Tap 4-35 ( 50 ) Sq.Mmpole Clamp ( 25 / 50 Mm ) 59 Spike Earthing Solide Rod 20Mm 60 8 Swg Gi Wire, Gi Nuts, Bolts & Washers For Earthing, Guarding. 61 Supply Of Danger Plate ( Lt ) 62 Supply Of Barbed Wire 63 Single Phase Domestic Service Connections :- 64 Supply Of Wooden Meter Board ( 14X12 ) Inch 65 Supply Of Wooden Board For Switch & Lamp Holder ( 6X4 ) Inch 66 Supply Of16 Amp Icdp Main Switch As Per Isi 67 Supply Of Piano Switch Isi 68 Supply Of Batten Holder Isi 69 Supply Of Earthing Bolt Of Size 10 X 5 Mm With Nuts & Bolts 70 Supply Of Pvc Pipe 20 Mm Dia Isi 71 Supply Of Pvc Saddle 72 Supply Of Single Core 1.5 Sq Mm Copper Cable 73 Supply Of Reel Insulator 74 Supply Of Earth Spike ( 1.8 Mtrx 20 Mm ) 75 Supply Of 9 Watt Pin Type Led Lamp ( 710 Lumens ) 76 Supply Of Screw Of Different Sizes 77 Supply Of 8 Swg Wire For Earting 78 Supply Of10 Swg Gi Wire 79 Supply Of Pvc Cable Size 2.5 Sqmm Single Core Aluminium Conductor 80 Erection 81 Erection, Testing And Commissioning Of New 11 Kv Lines Including Carriage By Hand-Cart And / Or Manual Labour:- 82 Survey, Route Alignment & Pole Spotting, Preparation Of Survey Report And Uploading In The Web Portal After Approval Of Project Manager 83 Erection Of 9 Mtr Long Pcc Pole At Any Kind Of Soil Upto A Depth Of 1 / 6 Th Of Pole Height Including Exavation Of Earth, Refilling The Pit With Soil Upto The Ground Level, Ramming And Making Complete In All Respect I / C Hand-Cart Carriage & Manual Carriage With Necessary Loading & Unloading 84 Erection Of 9 Mtr Long Steel Tubular Pole At Any Kind Of Soil Upto A Depth Of 1 / 6 Th Of Pole Height Including Exavation Of Earth, Refilling The Pit With Soil Upto The Ground Level, Ramming And Making Complete In All Respect I / C Hand-Cart Carriage & Manual Carriage With Necessary Loading & Unloading 85 Erection Of Stay Set Direct In Earth Complete With 19 Mm X 1800 Mm Long Stay Rod, Anchor Plate Of Size 300 X 300 X 8 Mm, Thimble, Turn Buckle, 7 / 3.15 Mm Dia Gi Stranded Stay Wire And Strain Insulator Etc With Supply Of Ms Clamp, Nuts & Bolts Etc As Required And Making Complete In All Respect 86 Erection Of Cross-Arm Sp Top 0.3 Mtr. Long 75X40x40x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 87 Erection Ofv Cross-Arm 75X40x40x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 88 Erection Of Cross-Arm Dp Top 2.2 Mtr. Long 75X40x40x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 89 Erection Of Cross-Arm Sp Guard 1.6 Mtr. Long 65X65x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 90 Erection Of Cross-Arm Dp Guard 2.5 Mtr. Long 65X65x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 91 Erection Of Horizontal Cross-Bracing1.8 Mtr. Long 65X65x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 92 Erection Of Vertical Cross-Bracing3.2 Mtr. Long 65X65x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 93 Erection Of 11 Kv Pin Insulator With Pin 94 Erection Of 11 Kv Single Disc Insulator Set Along With Necessary Fittings 95 Erection Of 11 Kv Dof Unit Set Of Three Nos. I / C Necessary Connection Complete As Per Technical Specification ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 96 Erection Of 11 Kv 200 Amps Gos Unit Set Of Three Nos. I / C Necessary Connection Complete As Per Technical Specification ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 97 Laying & Stringing Of 1 Km Acsr ( Single Conductor ) 6 / 1 / 2.59 Mm Dia Weasel Including Hoisting & Binding Etc Complete As Required 98 Laying & Stringing Of 1 Km ( Single Conductor ) 8 Swg Gi Wire Including Hoisting & Binding Etc Complete As Required 99 Erection Of 11 Kv Protective Guarding By 8 Swg Gi Wire As Per Technical Specification Across Road / River / Telecom Line Etc In Horizontal Formation Complete 100 Earthing With Gi Pipe 2.5 Mtr Long And 40Mm Dia Including Excavation, Refilling With Alternate Layer Of Salt & Charcoal As Per Drawing ( Excluding Supply Of Gi Pipe, Salt & Charcoal, Gi Wire, Nuts & Bolts, Etc As Required ) Gi Pipe 3000 Mm Long, As Per Is 1161, Making Earth Grid Using 50X6mm Gi Flat And Riser And Connecting Risers To Various Equipmentas Per Scope Of Work, Approved Drawings And Technical Specifications, 101 Supply Of 2.5 Mtr. Long, 40 Mm Dia Gi Pipe ( Make- Tata / Jindal ) 102 Supply Of 60 Kg Salt & 55 Kg Charcoal ( For 1 Pit ) 103 Erection Of Danger Plate On Oh Lines ( 11Kv / 415 Volts ) 104 Erection Of Barbed Wire ( Anti Climbing Device ) Per Pole 105 Grouting Of 9 Mtr. Long Steel Tubular Pole 106 Maintaining Adequate Clearance From Overhead Line Conductors By Trimming Of Tree Branches By Way Leaves 107 Carriage Of 9 Mtr. Long Pcc Poles By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- 108 Beyong 4 ( Four ) Poles 109 Carriage Of 9 Mtr. Long Steel Tubular Poles By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Upto 125 Km 110 Beyong 8 ( Eight ) Poles 111 Carriage Of Materials Such As Cable, Acsr, Gi Wire, Cross-Arm, Stay Set, Insulators Etc By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km ( 125 Km ) 112 Carriage Of Gos, Dof, La Etc By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km ( 125 Km ) 113 Erection, Testing And Commissioning Of New Distribution Transformer Substationsincluding Carriage By Hand-Cart And / Or Manual Labour:- 114 Erection Of 9 Mtr Long Steel Tubular Pole At Any Kind Of Soil Upto A Depth Of 1 / 6 Th Of Pole Height Including Exavation Of Earth, Refilling The Pit With Soil Upto The Ground Level, Ramming And Making Complete In All Respect I / C Hand-Cart Carriage & Manual Carriage With Necessary Loading & Unloading 115 Erection Of Stay Set Direct In Earth Complete With 19 Mm X 1800 Mm Long Stay Rod, Anchor Plate Of Size 300 X 300 X 8 Mm, Thimble, Turn Buckle, 7 / 3.15 Mm Dia Gi Stranded Stay Wire And Strain Insulator Etc With Supply Of Ms Clamp, Nuts & Bolts Etc As Required And Making Complete In All Respect 116 Erection Of Cross-Arm 0.8 Mtr. Long 100X50x50x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 117 Erection Of Cross-Arm 2.8 Mtr. Long 100X50x50x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 118 Erection Of Cross-Arm 2.8 Mtr. Long 75X50x50x6 Mm Channel ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 119 Erection Of 11 Kv Pin Insulator With Pin 120 Erection Of 11 Kv Single Disc Insulator Set Along With Necessary Fittings 121 Erection Of 9 Kv, Ka Single Pole Metal Oxide Gapless Type La I / C Necessary Connection Complete As Per Technical Specification 122 Erection Of 11 Kv Dof Unit Set Of Three Nos. I / C Necessary Connection Complete As Per Technical Specification ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 123 Erection Of 11 Kv 200 Amps Gos Unit Set Of Three Nos. I / C Necessary Connection Complete As Per Technical Specification ( Excluding The Cost Of Back Clamp, Nuts & Bolts ) 124 Installation / Positioning Of 11 / 0.430 Kv, 3-Phase 25 Kva Distribution Transformer On Pole With Necessary Connections & Fitting Fixing Of All Allied Accessories Components As Required For Making Complete In All Respect For Energizing 125 Laying & Stringing Of Acsr ( Single Conductor ) 6 / 1 / 2.59 Mm Dia Weasel Including Hoisting & Binding Etc Complete As Required 126 Earthing With Gi Pipe 2.5 Mtr Long And 40Mm Dia Including Excavation, Refilling With Alternate Layer Of Salt & Charcoal As Per Drawing ( Excluding Supply Of Gi Pipe, Salt & Charcoal, Gi Wire, Nuts & Bolts, Etc As Required ) Gi Pipe 3000 Mm Long, As Per Is 1161, Making Earth Grid Using 50X6mm Gi Flat And Riser And Connecting Risers To Various Equipmentas Per Scope Of Work, Approved Drawings And Technical Specifications, 127 Supply Of 2.5 Mtr. Long, 40 Mm Dia Gi Pipe ( Make- Tata / Jindal ) 128 Supply Of 60 Kg Salt & 55 Kg Charcoal ( For 1 Pit ) 129 Erection Of Cut-Out Circuit I / C Pvc Cable By Providing Wooden Plank 130 Erection Of Danger Plate On Oh Lines ( 11Kv / 415 Volts ) 131 Erection Of Barbed Wire ( Anti Climbing Device ) Per Pole 132 Grouting Of 9 Mtr. Long Steel Tubular Pole 133 Providing Sub-Station Fenching Of Area 4.5Mx3.5M With 13 No. 2.3 Mtr. Long 35X35x5 Mm Angle Posts 1 Mtr. Apart And Having Grouting Of Volume 0.03125 Cum ( 0.5Mx0.25X0.25M Ratio 1:2:4, 1 Cement:2 River Sand: 4 Stone / Brick Chips ) With Gate Size 1.5 Mtr. X 1.6 Mtr. I / C Hinge 134 Carriage Of 9 Mtr. Long Steel Tubular Poles By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km ( 125 Km ) 135 Beyong 8 ( Eight ) Poles 136 Carriage Of 11 / 0.230 Kv, 3-Phase 25 Kva Distribution Transformer By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km ( 125 Km ) 137 Carriage Of Materials Such As Cable, Acsr, Gi Wire, Cross-Arm, Stay Set, Insulators Etc By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km 138 Carriage Of Gos, Dof, La Etc By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km 139 Erection, Testing And Commissioningof New Lt Line Using Xlpe Ab Cableby Including Carriage By Hand-Cart And / Or Manual Labour:- 140 Survey, Route Alignment & Pole Spotting, Preparation Of Survey Report And Uploading In The Web Portal After Approval Of Project Manager 141 Erection Of 8 Mtr Long Pcc Pole At Any Kind Of Soil Upto A Depth Of 1 / 6 Th Of Pole Height Including Exavation Of Earth, Refilling The Pit With Soil Upto The Ground Level, Ramming And Making Complete In All Respect I / C Hand-Cart Carriage & Manual Carriage With Necessary Loading & Unloading 142 Erection Of 8 Mtr Long Steel Tubular Pole At Any Kind Of Soil Upto A Depth Of 1 / 6 Th Of Pole Height Including Exavation Of Earth, Refilling The Pit With Soil Upto The Ground Level, Ramming And Making Complete In All Respect I / C Hand-Cart Carriage & Manual Carriage With Necessary Loading & Unloading 143 Erection Of Stay Set Direct In Earth Complete With 19 Mm X 1800 Mm Long Stay Rod, Anchor Plate Of Size 300 X 300 X 8 Mm, Thimble, Turn Buckle, 7 / 3.15 Mm Dia Gi Stranded Stay Wire And Strain Insulator Etc With Supply Of Ms Clamp, Nuts & Bolts Etc As Required And Making Complete In All Respect 144 Erection & Fitting-Fixing Of Insulated Suspension Clamp Including Pole Clamp, Eye Hook For Cable Massenger Of 1.1 Kv Grade On Pcc / Steel Pole With The Help Of Pole Brackets Or Steel Straps & Buckles As Per Direction Of Engineering In-Charge 145 Erection & Fitting-Fixing Of Insulated Dead End / Anchoring Clamp Including Pole Clamp, Eye Hook For Cable Massenger Of 1.1 Kv Grade On Pcc / Steel Pole With The Help Of Pole Brackets Or Steel Straps & Buckles As Per Direction Of Engineering In-Charge 146 Erection & Fitting-Fixing Of Insulation Piercing Connectors ( Ipc ) All Sizes Of 1.1 Kv Grade Including Connection From Main Cable To Distribution Box, Tee-Off Line As Per Direction Of Engineering In-Charge 147 Fitting-Fixing Of Service Main1 / 3 Phase Distribution Box Of 1.1 Kv Grade On Pcc / Steel Pole With The Help Of Pole Brackets Or Steel Straps & Buckles As Per Direction Of Engineering In-Charge 148 Positioning Of Cable Drum, Removing Og Cable From Drum And Laying, Hoisting & Drawing Of Ab Cable 3X35+1X16+1X35 Sq.Mm / 1X25+1X16+1X25 Of 1.1 Kv Grade As Per Direction Of Engineering In-Charge 149 Erection Of Spike Earthing With 8 Swg Gi Wire At 300 Mm Below The Ground Level From The Earth Electrode 150 Erection Of Danger Plate On Oh Lines ( 11Kv / 415 Volts ) 151 Erection Of Barbed Wire ( Anti Climbing Device ) Per Pole 152 Grouting Of 8 Mtr. Long Steel Tubular Pole 153 Maintaining Adequate Clearance From Overhead Line Conductors By Trimming Of Tree Branches By Way Leaves 154 Carriage Of 8 Mtr. Long Pcc Poles By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km 155 Beyong 5 ( Five ) Poles 156 Carriage Of 8 Mtr. Long Steel Tubular Poles By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 125 Km 157 Beyong 8 ( Eight ) Poles 158 Carriage Of Materials Such As Ab Cable, Gi Wire, Stay Set, Insulators Etc By Mechanical Transport From Site Stote To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km 159 1- Phase Domestic Service Connections :- 160 Providing Single Phase Service Connection With Laying Pvc Cable From Nearby Electrical Pole To Premises Upto 35 Mtr. In Length Supported By G.I Wire, Reel Insulator In / C Fittings Fixing Of Energy Meter As Required. 161 Carriage Of Materials Such As Cable, Gi Wire, Cut-Out, Meters Etc By Mechanical Transport From Site Store To Working Site Vis-À-Vis, Including Loading, Unloading & Stacking As Required:- Beyond 25 Km Upto The Lead Of 50 Km 162 Erection Of Internal Part Including Fitting Fixing Of Board, Bulb And Earthing Of Consumer Premises.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 07-Mar-2024 BID correction Financial Bid 11-03-2024
2 07-Mar-2024 Technical bid Technical Bid 11-03-2024

Key Value

Document Fees
INR 4000 /-
EMD
INR 835418.0 /-
Tender Value
INR 4.17 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail