Tender For Supply Of Materials For Construction Of Gray Water Management Harvi Gp - Dia Hold Fast Rod 20 Mm Har02, Guage Sq. Plate Washer 60 X 60 X 10 Har02, Bolt 15 Mm Har02, M.S. Angles 65 X 65 X 6 Mm 34.7 Kgshar02, Welding Charges At 10Percentage On Materialhar02, Aluminium Painthar02, Wire Mesh 50Mm X 50Mmhar02, Add Brush, Putty, Sand Paper, Roller At 5Percentage On Cost Of Painthar02, Plastic Emulsion Painthar02, Vibratory Roller 8 Tonnehar02, Gravel 2.36 Mm / Murrumhar02, Pvc Pipe Of 4Kg Cum 63 Mmhar02, Laboratory Asst. ( Sslc Passed ) / Mate / Supervisorhar02, Filter Media Stone Aggregateshar02, Pvc Pipe Of 6Kg Cum 90 Mmhar02, Silver Oak Or Equivalent Planks 38 Mm Thickhar02, Jungle Wood Runners And Plankshar02, Binding Wirehar02, Tmt Bars Fe 500Har02, Hom Of Vibrator 0.71 Dayshar02, Plasticizer / Super Plasticizerhar02, Mixer ( Concrete ) - 1 Cum Capacityhar02, Broken Stone Aggregate 12 Mm To 10 Mm Sizehar02, Broken Stone Aggregate 20 Mm Sizehar02, Add Brush At 1Percentage On Cost Of Painthar02, Enamel Metal Painthar02, Add Handling , Loading And Unloading At 2Percentage On Materialhar02, Add Providing And Removing Scaffolding At 3Percentage On Labourhar02, Painter Class Ihar02, Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Percentage On Cost Of Painthar02, Ready Mix Primer Paint ( Ready Mix Red Lead Paint ) Har02, Add Hom Of Welding And Grinding Machine At 4Percentage On Materialhar02, Welder Grade Ihar02, Fitter Class Ihar02, Ms Flathar02, M.S Rodshar02, Add Watering Charges At 1 Percentage On Materialhar02, Add Sundries Charges At 2 Percentage On Materialhar02, Add Handling , Loading And Unloading At 1Percentage On Materialhar02, Casurina Poles 100 - 150 Mmhar02, Stone Chistler Class Iihar02, Mason Class Ii ( With Tools ) Har02, Bouldershar02, Bond Stone 20 X 20 X 45 Cmhar02, Size Stone 20 X 20 X 25 Cmshar02, Add Sundries Charges At 1 Percentage On Materialhar02, Water Tankerhar02, Generator 33 Kvahar02, Mixer ( Concrete Small Used In Culvert ) Har02, Mason Class I ( With Tools ) Har02, Waterhar02, Portland Cementhar02, Coarse Sand ( Zone Iii ) Har02, Broken Stone Aggregate 40 Mm Size Har02