Water Resources Department-WRD has published Tender For Repair Work ; Premansoon Servicing Oiling Greasing And Compounding Work Of Radial Crest Gates Gantry Crane And Sluice Gates At Intake Of Tawa Dam Tawanagar For Year 2024-25. Submission Date for this Tender is 15-03-2024. Cranes Tenders in Hoshangabad Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | FOR RADIAL CREST GATES-Pre cleaning work before oiling, Greasing and compounding work of wire Ropes of radial crest gates with hoist (size 15.24mtr x 12.19 mtr), 100T gantry crane, lifting beam & cleaning of beehive nest bee ofTawa dam, size of ropes 6 x 36 x 37mm, length of rope 200 m of each gate, work Includes cost of materials. Labour. Transportation, T & P and as directed By engineer in charge. (13 Job for radial gate+2Job for gantry crane +4 Job for Sluice gate at Intake saddle dam ) Total 19 Job |
2 | Providing and applying cardium compound of approved quality to wire ropes of hoists/ gantry cranes as part of annual maintenance including cost of all materials, machinery. labour. etc complete.Lubrication On Wire Rope Of Radial Crest Gate ByCa.R.DiumCompound Servo Super Coat 140 Grade. Size of wire rope 6x36x36 mmlength of wire rope 200 mtr, Area = pDL= 3.14x0.036x200=22.60 sq.mtrCompound required per sq. mtr=1.89 KG Total Compound required=1.89 kg x 22.60 sqr. mtr x 13 No. gates = 555.28, say 556 Kg |
3 | Providing And Applying Grease of Approved Quality. to Gate And Hoist Components Requiring Greasing As Part Of Annual Maintenance Using Grease Gun Wherever Necessary Including Cost Of All Materials, Machinery, Labour, Scaffolding Etc. Complete.1. Trunnion Assembly = 2 No. x 3.5 KG = 7 KG per gate. 2. Rollers 6 No. @ 1/2 Kg = 3 Kg per gate 3. Nipple at Hoist Assly. 200 gm Each x 10 = 2 kg per gate total.4. 12 kg x 13 No. gates = 156 Kg5. Stop log gates for Radial Gate 9 Nos. requires 9 Kg grease. 6. Stop log gates for Under-sluice Gates 3 Nos. requires 3 Kg. Lifting Beam (both) 2 Nos. requires 4 Kg Grease7. Gantry Crane 1 No. requires 6 Kg grease. Total Grease ( Servo Gem 3) = 176 Kg |
4 | Replacing Gear Oil Of Approved Qualityup to the Required Gauge Level For Reduction Gear unit Of Hoists AndGantry Cranes IncludingCost of al l Materials, Machinery, Labour Etc. Complete. Gear Oil (Sp 320) Required For Radial Gates Require For Radial gates 3 ltr. each unit x 3=9 ltr per gate. Required For Stop log Gates = 4.5 ltrRequired For Stop log of Under SuLice 1.5 Ltr Required For Lifting Beam = 1 ltr Required For Gantry Crane-10 LtrTotal Gear Oil required 134 ltr |
5 | For Post Cleaning Work Required Labour After Oiling, Greasing And Compounding Work Of Radial Gates Require 4 Days. For Post Cleaning Of Lifting Beam , 100 T Gantry Crane, Stop log Gates Require 2days 6 days x 4 Labour . Total 6 Job |
6 | Providing And Applying Cardium Compound Of Approved Quality To Wire Ropes. Of Hoists/ Gantry Cranes As Part Of Annual Maintenance Including Cost Of All Materials, Machinery, Labour Etc. Complete. Length of wire rope = 110 Mtr.Size of wire rope = 6x36x26 Area =pDL= 3.14x0.026x110 = 8.89 sq. Mtr. Compound required per sq. mtr=1.89 KG Total Compound required=1.89 kg x 8.89 sqr. mtr =16.97 kg say 17 Kg Total Compound req. = 17x8= 136 kg |
7 | Providing And Filling/ Replacing Gear Oil Of Approved Quality Up To The Required Gauge Level For Reduction Gear Unit Of Hoists/ Gantry Cranes Including Cost Of All Materials, Machinery, Labour Etc. Complete. Gear oil Servo SP 320 per gate required for topping 2 ltr x 8 Nos gate = 16 ltr |
8 | ProvidingandApplyinggrease of Approved Quality To Gate And Hoist Components Requiring Greasing As Part Of Annual Maintenance Using Grease Gun Wherever Necessary Including Cost. Of all materials, machinery, labour, scaffoldingetc. complete. Roller 4 nos X 0.5 kg =2kggreaserequired . Hoist assly including pedstals. Motor shaft, drum etc and gear train =6kg grease requiredTotal – 8kg grease per gate x 8 nos =64 kg. |
9 | Post Cleaning work Intake sluice gate after Oiling,Greasing and compounding work, Required 3 days. (4 labor) Total 3 Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail