Tender For Repair Work ; Premansoon Servicing Oiling Greasing And Compounding Work Of Radial Crest Gates Gantry Crane And Sluice Gates At Intake Of Tawa Dam Tawanagar For Year 2024-25, Hoshangabad-Madhya Pradesh

Water Resources Department-WRD has published Tender For Repair Work ; Premansoon Servicing Oiling Greasing And Compounding Work Of Radial Crest Gates Gantry Crane And Sluice Gates At Intake Of Tawa Dam Tawanagar For Year 2024-25. Submission Date for this Tender is 15-03-2024. Cranes Tenders in Hoshangabad Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42661097
Tender For Repair Work ; Premansoon Servicing Oiling Greasing And Compounding Work Of Radial Crest Gates Gantry Crane And Sluice Gates At Intake Of Tawa Dam Tawanagar For Year 2024-25
Open Tender
Indian
Madhya Pradesh
Hoshangabad
15-03-2024

Tender Details

Tender For Repair Work ; Premansoon Servicing Oiling Greasing And Compounding Work Of Radial Crest Gates Gantry Crane And Sluice Gates At Intake Of Tawa Dam Tawanagar For Year 2024-25

Key Value

Document Fees
INR 2000 /-
EMD
INR 5334.0 /-
Tender Value
INR 2.66 Lakhs /-

BOQ Items

Name of Work: Premansoon servicing oiling greasing and compounding work of radial crest gates gantry crane and sluice gates at intake of Tawa Dam Tawanagar for year 2024-25
Sl. No. Item Description
1FOR RADIAL CREST GATES-Pre cleaning work before oiling, Greasing and compounding work of wire Ropes of radial crest gates with hoist (size 15.24mtr x 12.19 mtr), 100T gantry crane, lifting beam & cleaning of beehive nest bee ofTawa dam, size of ropes 6 x 36 x 37mm, length of rope 200 m of each gate, work Includes cost of materials. Labour. Transportation, T & P and as directed By engineer in charge. (13 Job for radial gate+2Job for gantry crane +4 Job for Sluice gate at Intake saddle dam ) Total 19 Job
2Providing and applying cardium compound of approved quality to wire ropes of hoists/ gantry cranes as part of annual maintenance including cost of all materials, machinery. labour. etc complete.Lubrication On Wire Rope Of Radial Crest Gate ByCa.R.DiumCompound Servo Super Coat 140 Grade. Size of wire rope 6x36x36 mmlength of wire rope 200 mtr, Area = pDL= 3.14x0.036x200=22.60 sq.mtrCompound required per sq. mtr=1.89 KG Total Compound required=1.89 kg x 22.60 sqr. mtr x 13 No. gates = 555.28, say 556 Kg
3Providing And Applying Grease of Approved Quality. to Gate And Hoist Components Requiring Greasing As Part Of Annual Maintenance Using Grease Gun Wherever Necessary Including Cost Of All Materials, Machinery, Labour, Scaffolding Etc. Complete.1. Trunnion Assembly = 2 No. x 3.5 KG = 7 KG per gate. 2. Rollers 6 No. @ 1/2 Kg = 3 Kg per gate 3. Nipple at Hoist Assly. 200 gm Each x 10 = 2 kg per gate total.4. 12 kg x 13 No. gates = 156 Kg5. Stop log gates for Radial Gate 9 Nos. requires 9 Kg grease. 6. Stop log gates for Under-sluice Gates 3 Nos. requires 3 Kg. Lifting Beam (both) 2 Nos. requires 4 Kg Grease7. Gantry Crane 1 No. requires 6 Kg grease. Total Grease ( Servo Gem 3) = 176 Kg
4Replacing Gear Oil Of Approved Qualityup to the Required Gauge Level For Reduction Gear unit Of Hoists AndGantry Cranes IncludingCost of al l Materials, Machinery, Labour Etc. Complete. Gear Oil (Sp 320) Required For Radial Gates Require For Radial gates 3 ltr. each unit x 3=9 ltr per gate. Required For Stop log Gates = 4.5 ltrRequired For Stop log of Under SuLice 1.5 Ltr Required For Lifting Beam = 1 ltr Required For Gantry Crane-10 LtrTotal Gear Oil required 134 ltr
5For Post Cleaning Work Required Labour After Oiling, Greasing And Compounding Work Of Radial Gates Require 4 Days. For Post Cleaning Of Lifting Beam , 100 T Gantry Crane, Stop log Gates Require 2days 6 days x 4 Labour . Total 6 Job
6Providing And Applying Cardium Compound Of Approved Quality To Wire Ropes. Of Hoists/ Gantry Cranes As Part Of Annual Maintenance Including Cost Of All Materials, Machinery, Labour Etc. Complete. Length of wire rope = 110 Mtr.Size of wire rope = 6x36x26 Area =pDL= 3.14x0.026x110 = 8.89 sq. Mtr. Compound required per sq. mtr=1.89 KG Total Compound required=1.89 kg x 8.89 sqr. mtr =16.97 kg say 17 Kg Total Compound req. = 17x8= 136 kg
7Providing And Filling/ Replacing Gear Oil Of Approved Quality Up To The Required Gauge Level For Reduction Gear Unit Of Hoists/ Gantry Cranes Including Cost Of All Materials, Machinery, Labour Etc. Complete. Gear oil Servo SP 320 per gate required for topping 2 ltr x 8 Nos gate = 16 ltr
8ProvidingandApplyinggrease of Approved Quality To Gate And Hoist Components Requiring Greasing As Part Of Annual Maintenance Using Grease Gun Wherever Necessary Including Cost. Of all materials, machinery, labour, scaffoldingetc. complete. Roller 4 nos X 0.5 kg =2kggreaserequired . Hoist assly including pedstals. Motor shaft, drum etc and gear train =6kg grease requiredTotal – 8kg grease per gate x 8 nos =64 kg.
9Post Cleaning work Intake sluice gate after Oiling,Greasing and compounding work, Required 3 days. (4 labor) Total 3 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail