| 1 | Earthwork inexcavation for structures asper drawing and technical spesification claus 305.1 including setting out construction of shoring and bracing , remual of stumps and other deleterios material and disopsal upto a lead of 50 m, dressing of sides and bottam and backfilling in tranches with excavated suitable material. |
| 2 | Providing and laying in cement concrete 1:4:8 (1 cement :4 fine sand : 8 graded Brick Ballast 40 mm nominal size) including supply of all materials,labour and T&P et.required for proper completion of the work and curring complete,also including cost of form work in foundation and floors as per SI No.281. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per (MORD) Technical Specification Clause 401. |
| 4 | Sand filling in plinth under floors including lead upto 50m and lift upto 1.50m including materials,labour and T&P for proper completion of the work as per SI No.255 |
| 5 | P/L of 80mmthickRubber Moulded Zig-Zag Reflective interlocking Tiles with sand filling including supply of all materials labour & T&P etc all complete. |
| 6 | PCC work with cement,approved coarse sand and 20 mm gauge approved stone ballast in the proportion of 1:2:4 in bed plates excluding the supply of reinforcement and its bending but including its bending,supply of all other materials,labour and T & P as per SI No.279. |
| 7 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 8 | RCC works with cement,approved coarse sand and 20mm (¾\") gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows,sunshade and RCC projection excluding supply of reinforcement and its bending the same with 24BG binding wireincluding supply of all materials,labour and T & P etc.required for proper completion of the work as per SI No.283 |
| 9 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick workto required shape as necessary including bending for completion of work and including supply of Tor steel its wastage bend hooks and authorised overlapping shall be measuredas per SI No.504 |
| 10 | Dismentalling of RCC /Brick lintal ,steps |
| 11 | Supply and Fixing of Singh board |