Water Resources Department-WRD has published Laying Of Underground Pipe Line Of Water Course Of Outlet Rd 11000/Tl Of Shampura Minor.. Submission Date for this Tender is 09-04-2024. Water Course Tenders in ludhiana Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-Mar-2024 | corrigendum 1 | Date | 19-03-2024 |
2 | 19-Mar-2024 | corrigendum 2 | Date | 26-03-2024 |
3 | 26-Mar-2024 | corrigendum 3 | Date | 01-04-2024 |
4 | 01-Apr-2024 | corrigendum 4 | Other | 01-04-2024 |
5 | 01-Apr-2024 | corrigendum 5 | Date | 03-04-2024 |
6 | 03-Apr-2024 | Corrigendum | Other | 09-04-2024 |
7 | 03-Apr-2024 | corrigendum 6 | Date | 09-04-2024 |
Sl. No. | Item Description |
1 | Earth work Excavation by mechanical means (JCB or Hydraulic excavator) for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalledor unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. and removal of surplus soil outside/ inside the town involving lead upto 15 mtr. All classes of soil except rocky. Depth upto 1.5 mtr. |
2 | Earth work Excavation by mechanical means (JCB or Hydraulic excavator) for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalledor unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. and removal of surplus soil outside/ inside the town involving lead upto 15 mtr. All classes of soil except rocky. Depth upto 1.5 to 2.25mtr. |
3 | Earth work Excavation by mechanical means (JCB or Hydraulic excavator) for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalledor unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. and removal of surplus soil outside/ inside the town involving lead upto 15 mtr. All classes of soil except rocky. Depth upto 2.25 to 3.00 mtr |
4 | Earth work Excavation by mechanical means (JCB or Hydraulic excavator) for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalledor unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. and removal of surplus soil outside/ inside the town involving lead upto 15 mtr. All classes of soil except rocky. Depth upto 3.00 to 4.5 mtr |
5 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. |
6 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . |
7 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. |
8 | 10mm thick cement plaster 1:4 on bed and top. |
9 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement |
10 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle |
11 | Cement concrete 1:4:8 with brick ballast 40mm gauge |
12 | Providing Lowering, jointing and cutting of RCC NP-2 plain end pipes 450 mm dia with RCC collars & laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. |
13 | Providing Lowering, jointing and cutting of RCC NP-2 plain end pipes 200 mm dia with RCC collars & laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. |
14 | Providing Lowering, jointing and cutting of RCC NP-2 plain end pipes 300 mm dia with RCC collars & laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. |
15 | Providing Lowering, jointing and cutting of RCC NP-2 plain end pipes 600 mm dia with RCC collars & laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. |
16 | Providing Lowering, jointing and cutting of RCC NP-2 plain endpipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment as per IS 458:2003 ( @2.50 metre / No) |
17 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank |
18 | Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4 |
19 | Providing and fixing of Alfa Valve fitted on riser pipe to act as Nakka (D regulators) |
20 | Centreing &shuttering for Concerte faces |
21 | Providing & Fixing of Assembly/Appurtmentsconsisting of a Alfa Valve and operating arrangement in Main Pipeline complete in all respect |
22 | Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications |
23 | First class burnt brick work laid in cement sand mortar 1:4 in foundation andplinth |
24 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 and Tippers with Disposal up to 450 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead up to 450m |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail