}

Tender For Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 3-Part 1 :Providingcement Concrete Road At Puducolony Iind Street - Nallendrapuram Oht To Pandiyammal House111x3.00M Estimate Amount Rs 6.00 Lak Hs 2 Earthwork Excavation In All Clauses Of S, Dindigul-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 3-Part 1 :Providingcement Concrete Road At Puducolony Iind Street - Nallendrapuram Oht To Pandiyammal House111x3.00M Estimate Amount Rs 6.00 Lak Hs 2 Earthwork Excavation In All Clauses Of S. Submission Date for this Tender is 07-03-2024. RCC Road Tenders in Dindigul Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

42620065
Tender For Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 3-Part 1 :Providingcement Concrete Road At Puducolony Iind Street - Nallendrapuram Oht To Pandiyammal House111x3.00M Estimate Amount Rs 6.00 Lak Hs 2 Earthwork Excavation In All Clauses Of S
Open Tender
Indian
Tamil Nadu
Dindigul
07-03-2024

Tender Details

Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 3-Part 1 :Providingcement Concrete Road At Puducolony Iind Street - Nallendrapuram Oht To Pandiyammal House111x3.00M Estimate Amount Rs 6.00 Lak Hs 2 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 3 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 4 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 5 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 6 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 7 Provision For Bitumen Pad Charges 8 Provision For Name Board Charges 9 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 10 Part 2 : Providingcement Concrete Road Atkamatchipuram Main Road To Ponnimanthurai Burial Ground 165X3.00 Mestimate Amount Rs.8.85 Lakhs 11 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 12 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 13 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 14 Cement Concrete 1:3:6 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 15 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 16 Provision For Bitumen Pad Charges 17 Provision For Name Board Charges 18 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 19 3.Construction Of New Anganwadi Building At Nallendrapuram Estimate Amount Rs. 16.55 Lakhs 20 Earthwork Excavation And Depositing On Bank With Initial Lead And Lift In Hard Gravelly Soil For Foundation Etc. Complete. 21 Cement Concrete 1:4:8 Mix Using 40Mm Metal Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 22 Filling In Foundation And Basement With Redgravel In Layers Of Not More Than 15Cm. Thick Well Rammed, Watered And Consolidated Complying With Standard Specifications Etc., Complete. 23 Brick Work In Cement 1:5 Mix Using Country Bricks Of Size 23X11.5X7.5Cms For The Following Including Mixing Mortar And All Other Labour Charges Etc. Complete. 24 Supplying And Erecting Shuttering Including Necessary Support For Plane Surface In Foundation Basement And Roof Labs Strutting Upto 3.29M Height For Plane Surfaces For Floors For Rcc Column Footings Columns Plinth Beam And Connected With Foundations 25 Supplying, Fabricating And Placing In Position Mild Steel Or Ribbed To Steel And All Reinforced Cement Concrete Works As Per The Design Given Including Cost Of Steel And Binding Wire In All Floors Etc. Complete. 26 Rcc 1:1.5:3 Using 20Mm Hbg Metal Including Cost And Conveyance Of Materials And Labour Charges Etc. Complete 27 Cement Concrete 1:3:6 Mix Using 20Mm Metal Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 28 Cement Concrete 1:2:4 Mix Using 20Mm Metal Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 29 Providing Weathering Course With Best Quality Of Broken Jelly Of Size 20Mm Uniform Gauge In Pure Slacked Lime ( No M.Sand To Be Used ) Over The Roof Slab In The Proportion Of Brickjelly Lime 32:121 / 2 By Volume And Laid Over In A Single Layer And Consolidated To The Required Thickness & Beating The Concrete With Wooden Beaters Of Approved Pattern As Per Std. Specifications Etc., Complete. 30 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20Cmx20cmx20mm Of Approved Quality Laid In Cement Mortar 1:3 Mix To 12Mm Thick Mixed With Water Proofing Compound Confirming To Iss By 2% Weightof Cement Used And The Joint Pointed Neatly To Full Depth Of Tiles With Same Mortar As Per Std., Specifications Etc., Complete. 31 Paving The Floor With Eurocon Tiles Of Any Colour And Any Size Laid In Cm 1:2 20Mm Thick And Pointing With White Cement 0.4Kg / Sqm Mixed With Colouring Pigment To Suit The Colour Of The Tiles Including Finishing The Joint Neatly Complying With Std Specification. 32 Dadooing Walls With Glazed Tiles Of Any Colour And Any Size Laid In Cm 1:2, 10Mm Thick. And Pointing With White Cement 0.4 Kg Per Sqm Mixed With Colouring Pigment To Siut The Colour Of The Tiles Including Finishing The Joints Neatly Complete 33 Providing The Following Thickness Of Granolithic Pattern Floor Finish With Plain Cement Concrete 1 : 2 : 4 Mix Using 10-12Mm Isshbg Metal And The Top Rubed Smooth Etc., Complete 34 Plastering With Cm 1:3 Mix 10Mm Thick Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 35 Plastering With Cm 1:5 Mix 12Mm Thick Including Cost And Conveyance Of All Materials To Site And Labour Charges Etc. Complete. 36 Providing Cuddapa Slab Including All Charges Etc. 37 Iwc 38 Ewc 39 Supplying And Fabrication Of Steel Doord ( 1.00X2.10M ) 40 Supplying And Fabrication Of Steel Doord ( 1.10X2.10M ) 41 Supplying And Fabrication Of Steel Door D1 ( 0.75X1.80M ) 42 Supplying And Fabrication Of Steel Window W ( 1.2X1.3M ) 43 Supplying And Fabrication Of Steel Ventilator ( 0.60X0.45M ) 44 Towards Labour Charges Forfixing Of Steel Doors, 45 Towards Labour Charges Forfixing Of Steel Windows, & Ventilators 46 Supplying And Fixing Of Rcc Jolly Including All Charges Etc 47 Providing Rain Water Pipe Including All Labour Charges Etc. 48 Colour Washing Two Coatswith Approved Quality Of Oil Bound Distemper Withgood Colour Pigments Including All Charges Etc. 49 Painting Two Coats With Best Quality Of Ready Mixed Plastic Emulison Of Ist Class Paintwith Appd. Colour Approved By The Departmental Officersincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 50 Painting Two Coats For Black Board Including All Charges Etc. Complete 51 Painting Two Coats Over New Iron Work Using Synthetic Enamel Paint Including Cost And Conveyace Of All Materials To Site Etc. Complete. 52 Supply And Fixing Of 16 Ampsdpic Switch Of 500V Grade With Fuse And Nutralon Suitable T.W. Board With Painting Of Suitable Colour With Pwd Earthing ( Sd No.142 ) 53 Supply And Run Of 2 Of 6 Sq. Mm ( 84 / 0.30 ) Polythene Insulated And Pvc Unsheeted S.C. Alu Cable Of 1100 V On 7 / 20 Gi Bearerwirefor Service Connection Main -Sd.66 54 Supply And Run Of 2 X1.5Sq. Mm ( 22 / .3 ) Pvc Insulated Sc Unsheeted Cu. Conductor Of 1100Grade In 25Mm Dia Gi Pipe ( GlassB ) Suitably Bent At Both Ends With Necessary Angle Iron Upright And End Supports For Mains Sd 69 55 Supply And Fixing Of 14W Cfl Lamp For Existing Bh Point. ( Data - B ) 56 Supply And Fixing Of W.T. Bulk Head Fitting Complete With Guard Suitable For Lamp With 60 W Bulb With Pvc Unsheated Leads From Terminal To The Fitting - Sd. 84 57 Wiring With 2 X 1.5 Sq.Mm Pvc Uncheated Sc Cu.Cable Of 1100 V Grade In Suitable Pvc Rigid Pipe On Wall And Ceiling With Pvc Accessories With T.W. Switch Box In Flush With Wall, Covered With Nylon Sheet Of 3Mm Thick With Painting Of Suitable Colour For Open Light Point & Fan Point Sd 17 58 Wiring With 2 X 2.5 Sq.Mm Pvc Uncheated Sc Alu.Cable Of 650V Grade In Suitable Pvc Rigid Pipe On Wall And Ceiling With Pvc Accessories With 150 X 100 X 113Mm T.W. Switch Box In Flush With Wall, Covered With Nylon Sheet Of 3Mm Thick 5 Amps 3 Pin Non - Inte Plug Point. Sd 36 59 Supply And Fixing Of Ceiling Fan ( Crompton Make ) Including Cost And Conveyance Of All Materials And Labour Cherges Etc Complete.Ceiling Fan Sd 114 60 Supply And Fixing Of Ac Exhaust Fan 300Mm Sweep Complete Without Provision Of Hole In The Wall Exhaust Fan 300Mm Sd 115 61 Supply And Fixing Of Main Service Board.Etc Complete. 62 Construction Of Rain Water Harvesting Including All Charges Etc. 63 Provision For Cartoon Paintings 64 Provision For Handrails 65 63Mm Pvc Pipe 4Ksc 66 63Mm Pvc Mta 67 63Mm Pvc Bend 68 2000Litre Hdpe Tank 69 Earth Work Excavation In All Clauses Of Soil As Per Ss20b. Pipeline 70 Labour Charges For Laying And Joining Pvc Pipes Including All Cost Etc Complete 71 Labour Charges For Tank Inlet And Outlet Connection Works Including All Cost Etc Complete 72 Provision For Name Board 73 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 74 4.Construction Of Rcc Slab Culvert Near Velankanni House At Ponnimanthurai Estimate Amount Rs. 9.50 Lakhs 75 Earthwork Excavationin All Classes Of Soilexcept Hard Rock Requiring Blasting And Depositing On Bank With All Leads And Lifts As Per Ss20b, Including Cost Of All Labour, Equipments And All Incidental Charges Such As Baling Our Water, Providing And Maintaining Necessary Cofferdams, Sheeting, Shoring Bracing And Their Subsequent Removal, Removal Of All Logs, Stumps, Grubs And Other Deleterious Matter And Obstructions, Trimming Bottom Of Excavation Backfilling, And Clearing The Site And Disposal Of All Surplus Materials Etc., Complete As Per Relevant Standard Specification For Foundation Of Abutments, Piers And Wings. 76 Providing And Laying For Plain Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of Materials At Site And Watering And Compacting Etc., Complete Complying With Standard Specifications For Foundation 77 Cement Concrete 1:3:6Using 40Mm Iss Size Hbg Metal Including Cost And Conveyance Of All Materials To Site Including Cost Of Cementat Siteincluding Costsoft Water, Labour Charges For Mixing, Transporting, Layingand Curing Concrete , Working At Depths , Tools And Plants And Maintaining Of Protective Bunds, Cofferdams, Shoring, Strutting Etc., Complete As Per Relevant Standard Specifications, For Footings Of Abutment And Wings Below Sill Level & Above Sill Level 78 Reinforced Cement Concrete 1:2:4 Using 20Mm Iss Size Hard Granite Broken Graded Metal Including Cost And Conveyance Of All Materials To Siteand Cement At Site But Excluding Cost And Fabrication Of Steel, Including Labour Charges For Mixing, Transporting, Laying, Curing Concrete, Working At Heights, Hire Charges For Tools And Plants, Including All Other Incidental Charges, Etc., Complete For Dirt Wall Cum Bed Block Over Abutments 79 Reinforced Cement Concrete1:1.5:3 Using 20Mmiss Size Hbg Graded Metal Including Cost And Conveyance Of All Materials To Site Including Cost Of Cementat Siteincluding Cost Of Soft Water, Labour Charges For Mixing, Transporting, Layingand Curing Concrete , Working At Depths , Tools And Plants Including All Other Incidental Charges Etc; Complete As Per Relevant Standard Specifications, For Deck Slab. 80 Centering : Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm For 81 Centering :Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm Fo 82 Supply And Fabrication Of Fe-415 Steel Required For All Rcc Items Of Works Involved In The Schedule, Including Cost Of Steel At Site And Cost Offabrication, Labour Charges For Cleaning The Rods Straightening, Cutting, Bending, Tying Grills, Including Overlaping To The Required Length Wherever Necessary And Placing The Reinforcement In Position As Specified In The Drawings, Including Cost Of Binding Wire, Provision Of Spacer Bars, Cover Blocks And All Other Incidental Charges Etc, Complete, Fe-415 Grade 83 Providing And Fixing Pvc Expansion Joint In Between Deck Slabs Over Abutment And Pier As Shown In The Drawing Including Cost And Conveyance Of Expansion Joints Including Shalimar Pad And Joint Sealant Etc., Complete 84 Providing And Fixingkraft Paper For Full Width Of Seating Of Deck Slab And Including Cost And Conveyance To Worksite, Labour For Fixing The Same In Correct Position And Other Incidentalcharges Etc., Complete 85 Providing And Fixing Seepage Pipes Of 100Mm Pvc Pipes Of Required Lengths For Abutments And Wings Including Cost And Conveyance Of All Materials To Worksite, Cost And Labour For 900 Mm Dia. Semi-Spherical Backfill Arrangements With 100Mm Size Broken Granite Chips At The Periphery And Labour Charges For Fixing Etc., Complete To Drain The Backfill. 86 Filling Behind Abutments And Wings With Gritty Gravel Including Cost And Conveyance Of Gravel To Worksite, Laying, Handling Charges And Filling In Layers, Tamping Under Optimum Moisture Content To Get The Maximum Density Including Watering, With All Leads For Water And All Other Incidental Charges Etc., Complete.. 87 Provision For Name Board 88 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 89 Part 5. Improvemnt To The Samathuva Burial Ground ( Waiting Shed , Compound Wall30m ) Estimate Amount Rs.6.50Lakhs 90 Earthwork Excavation For Foundation In All Clauses Of Soils And Subsoils To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring, Struting And Bailing Out Water Wherever Necessary And Refilling The Sides Of Foundation. 91 Filling Basement With Excavated Earth In Layers Not More Than 15Cm Thick Including All Labour Charges Etc., Complete. 92 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15 Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. 93 Brickwork In C.M. 1:5 Mix Using Country Bricks Ground Moulded Of Size 23X11x7 Cu.Cm Including Cost And Conveyance Of All Materials And All Labor Charges Etc., 94 Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm For Boarding Laid Over Silver Oak ( Country Wood ) Joists Of Size 10X6.50Cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13Cm Dia Spaced At 75Cm C / C Etc. Complete. 95 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed. 96 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 97 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including All Cost And Conveyance Of All Matirials And All Labour Charges Etc Complete ., 98 Plastering With Cement Mortar 1:3 Mix To 10Mm Thick Including Curing, Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 99 Plastering With Cement Mortar 1:5 Mix To 12Mm Thick Including Curing, Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 100 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20Cmx20cmx20mm Of Approved Quality Laid In Cement Mortar 1:3 Mix To 12Mm Thick Mixed With Water Proofing Compound Confirming To Iss By 2% Weightof Cement Used And The Joint Pointed Neatly To Full Depth Of Tiles With Same Mortar As Per Std., Specifications Etc., Complete. 101 Providing Granolithic Pattern Floor Finish With C.C. 1:2:4 Mix Using 10 To 12Mm Iss Metal Including Cost & Convayance Of All Materials To Site And All Labour Charges Etc., Complete 102 Exteriour Emulsion Two Coats With Approved Cement Paint Distemper Including All Cost And Conveyance Of All Materials And Labour Charges Etc Complete., 103 White Washing Two Coats With Shell Lime Including Cost & Convayance Of All Materials To Site And All Labour Charges Etc., Complete 104 Providing Rcc Jolly 105 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 106 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 107 R.R. Masonry In C.M.1:5 Mix Using Rough Stones And Bond Stones With Simultaneous Pointing Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 108 Brick Work In C.M 1:5 Mix Using Country Bricks Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 109 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed 110 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 111 Plastering With Cement Mortar 1:5 Mix To 12Mm Thick Including Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 112 Exteriour Emulsion Two Coats With Approved Cement Paint Distemper Including All Cost And Conveyance Of All Materials And Labour Charges Etc Complete., 113 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 114 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 115 Supply And Errection Of Centering And Shuttering Charges For All Pcc Works Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 116 Cement Concrete 1 : 2 : 4 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 117 Cement Concrete 1 : 3 : 6 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 118 Provision For Bitumenpad Charges Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 119 63Mm Pvc Pipe 4Ksc 120 63Mm Pvc Mta 121 63Mm Pvc Bend 122 Solvent Oil 123 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth Soils Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Completepipe Lne 124 1000 Lit Hdpe Tank 125 Labour Charges For Construction Of 1000 Lit Hdpe Tank Pedastal In Cm 1:5 Mix Using Rr Masonry Work Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 126 Provision For Name Board Charges 127 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }

Key Value

Document Fees
Refer document
EMD
INR 48000.0 /-
Tender Value
INR 47.40 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail