}

Tender For Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 2-Part 1 :Providingcement Concrete Road With Retaining Wall Atthangamar Porupu- 120Mx3.00M Estimate Amount Rs10.00 Lakhs 2 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank, Dindigul-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 2-Part 1 :Providingcement Concrete Road With Retaining Wall Atthangamar Porupu- 120Mx3.00M Estimate Amount Rs10.00 Lakhs 2 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank. Submission Date for this Tender is 07-03-2024. PVC Tank Tenders in Dindigul Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

42620038
Tender For Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 2-Part 1 :Providingcement Concrete Road With Retaining Wall Atthangamar Porupu- 120Mx3.00M Estimate Amount Rs10.00 Lakhs 2 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank
Open Tender
Indian
Tamil Nadu
Dindigul
07-03-2024

Tender Details

Agamt Ii 2024-2025 Reddiyarchatram Blcok Package No 2-Part 1 :Providingcement Concrete Road With Retaining Wall Atthangamar Porupu- 120Mx3.00M Estimate Amount Rs10.00 Lakhs 2 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 3 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 4 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 5 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 6 Provision For Bitumen Pad Charges 7 Provision For Name Board Charges 8 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 9 Part 2 :Providingcement Concrete Road At Meltheru Near Vppalanisamy House- 43X3.00M Estimate Amount Rs.1.81 Lakhs 10 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 11 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 12 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 13 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 14 Provision For Bitumen Pad Charges 15 Provision For Name Board Charges 16 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 17 Part 3 : Providingcement Concrete Road At Pandrimalai Sc Colony Near Anganwadi- 48X3.00 M Estimate Amount Rs.2.00 Lakhs 18 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 19 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 20 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 21 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 22 Provision For Bitumen Pad Charges 23 Provision For Name Board Charges 24 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 25 Part 4 : Providingcc Road From Chinnathai House To Community Hall In Solaikadu Sc 122X3.00 M Estimate Amount Rs.5.00 Lakhs 26 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 27 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 28 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 29 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 30 Provision For Bitumen Pad Charges 31 Provision For Name Board Charges 32 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 33 Part 5 : Providingcc Road From Uradivalasu Colony ( 95Mx3.00M ) Estimate Amount Rs.3.90 Lakhs 34 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 35 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 36 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 37 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 38 Provision For Bitumen Pad Charges 39 Provision For Name Board Charges 40 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 41 Part 6. Improvement To Thesamuthava Burial Ground ( Cremation Shed, Compound Wall ( 45M, Cc Pavement ( 27M ) Turn On Screen Reader Support Estimate Amount Rs.9.00 Lakhs 42 Earthwork Excavation For Foundation In All Clauses Of Soils And Subsoils To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring, Struting And Bailing Out Water Wherever Necessary And Refilling The Sides Of Foundation. 43 Filling Basement With Excavated Earth In Layers Not More Than 15Cm Thick Including All Labour Charges Etc., Complete. 44 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15 Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. 45 Brickwork In C.M. 1:5 Mix Using Country Bricks Ground Moulded Of Size 23X11x7 Cu.Cm Including Cost And Conveyance Of All Materials And All Labor Charges Etc., 46 Supplying And Erecting Centering For Sides And Soffits Including Support And Strutting Up To 3.29M High For Plane Surface Such As Using Mild Steel Sheets Of Size 90 X 40 Cm And Bg 10 Stiffened With Welded Mild Steel Angle Of Size 25X25x3mm For Boarding Laid Over Silver Oak ( Country Wood ) Joists Of Size 10X6.50Cm Spaced At About 90 Centre To Centre And Supported By Casaurina Props Of 10 - 13Cm Dia Spaced At 75Cm C / C Etc. Complete. 47 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed. 48 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 49 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including All Cost And Conveyance Of All Matirials And All Labour Charges Etc Complete ., 50 Plastering With Cement Mortar 1:3 Mix To 10Mm Thick Including Curing, Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 51 Plastering With Cement Mortar 1:5 Mix To 12Mm Thick Including Curing, Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 52 Finishing The Top Of Roof With One Course Of Machine Pressed Tiles Of Size 20Cmx20cmx20mm Of Approved Quality Laid In Cement Mortar 1:3 Mix To 12Mm Thick Mixed With Water Proofing Compound Confirming To Iss By 2% Weightof Cement Used And The Joint Pointed Neatly To Full Depth Of Tiles With Same Mortar As Per Std., Specifications Etc., Complete. 53 Providing Granolithic Pattern Floor Finish With C.C. 1:2:4 Mix Using 10 To 12Mm Iss Metal Including Cost & Convayance Of All Materials To Site And All Labour Charges Etc., Complete 54 Exteriour Emulsion Two Coats With Approved Cement Paint Distemper Including All Cost And Conveyance Of All Materials And Labour Charges Etc Complete., 55 White Washing Two Coats With Shell Lime Including Cost & Convayance Of All Materials To Site And All Labour Charges Etc., Complete 56 Providing Rcc Jolly 57 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 58 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 59 R.R. Masonry In C.M.1:5 Mix Using Rough Stones And Bond Stones With Simultaneous Pointing Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 60 Brick Work In C.M 1:5 Mix Using Country Bricks Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 61 Supplying, Fabricatingand Placing Of Mild Steel Or Ribbed For Steel Rods And All Rcc Works As Per The Design Given Including Cost Steel And Binding Wire In All Floors Etc., & Convayence Of Steel As Per Std. Specificationand Directed 62 Rcc 1:1.5:3 Mix Using 20 Mm Iss Hbg Metal Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 63 Plastering With Cement Mortar 1:5 Mix To 12Mm Thick Including Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 64 Exteriour Emulsion Two Coats With Approved Cement Paint Distemper Including All Cost And Conveyance Of All Materials And Labour Charges Etc Complete., 65 Earth Work Excavation For Foundation In All Soils And Sub Soil To Full Depth As May Be Directed Except In Hard Rock Requiring Blasting But Inclusive Of Shoring Strutting And Requiring The Sides Of Foundation. 66 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed. 67 Supply And Errection Of Centering And Shuttering Charges For All Pcc Works Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 68 Cement Concrete 1 : 2 : 4 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 69 Cement Concrete 1 : 3 : 6 Mix Using 20Mm Hbg Metal Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 70 Provision For Bitumenpad Charges Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 71 63Mm Pvc Pipe 4Ksc 72 63Mm Pvc Mta 73 63Mm Pvc Bend 74 Solvent Oil 75 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth Soils Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Completepipe Lne 76 1000 Lit Hdpe Tank 77 Labour Charges For Construction Of 1000 Lit Hdpe Tank Pedastal In Cm 1:5 Mix Using Rr Masonry Work Including All Cost And Conveyance Of All Materials And All Labour Charges Etc Complete 78 Provision For Name Board Charges 79 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 80 Part 7 : Providingcement Concrete Road From Vettaiveeran Temple To E.Sevai Centre112x3.00M.Estimate Amount Rs 4.58 Lakhs 81 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 82 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 83 Supply And Errection Ofcentering For Sides And Soffits Of Cc Works Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete 84 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 85 Provision For Bitumen Pad Charges 86 Provision For Name Board Charges 87 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 88 Part 8. Construction Of Threasing Floornear Service Centreestimate Amount Rs.8.80 Lakhs 89 Earthwork Excavation In All Clauses Of Soils And Depositing On Bank With Initial Lead And Lift For Foundation As Per Ss20b 90 Refilling The Excavated Earth Otherthen M. Sand Including All Cost And Conveyance Of All Matirials And All Labour Charges Etc Complete ., 91 Cement Concrete 1:4:8 Mix Using 40Mm Iss Hbg Metal For Foundation Including Watering Whenever Necessary And Laid In Layers Not More Than 15Cm Thick Compacting Etc., Complete Complying With Std. Specifications And As Directed. Rate For 10 Cum. 92 R.R. Masonry In C.M.1:5 Mix For Foundation And Basement Using Rough Stones And Bond Stones With Simultaneous Pointing With Same Mortar Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 93 Brick Work In C.M 1:5 Mix Using Country Bricks Including Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 94 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including All Cost And Conveyance Of All Matirials And All Labour Charges Etc Complete ., 95 Plastering With Cement Mortar 1:5 Mix To 20Mm Thick Including Curing, Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 96 Painting Two Coats With Exteroir Emulsion Paintincluding Cost & Conveyance Of All Materials To Site And All Labour Charges Etc., Complete. 97 Supply And Fixing Of Cool Sheet Rrofing With J Bolts Including Curing, Cost And Conveyance Of All Materials & All Labour Charges Etc., Complete. 98 Provision For Hollw Pipe For Trees With Hollow Pipe Purlins Arrangements 99 Provision For Bitumen Pad Charges 100 Provision For Name Board Charges 101 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }

Key Value

Document Fees
Refer document
EMD
INR 45100.0 /-
Tender Value
INR 45.09 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail