Supply Of Mv Switchgear And Bus Ducts Design, Engg, Procurement, Fabrication, Inspection, Testing, Fat, Packing, Transportation And Supply Of The Mv Switchboard With Bus Duct, Including Condition Monitoring Sensors With Its Analyzers/ Modules , Supply, Design, Engineering, Manufacture, Procurement Of Materials And Bought Out Components, Assembly At Shop, Shop Painting, Inspection, Testing At Manufacturer’S Works, Packing, Delivery To Site Of Following Mentioned 415V Mv Indoor Switchboards For Nrl Expansion Project (Substation No.-16), Including Supply Of Special Tools And Tackles.The Mv Switchboards Shall Comply With The Specification, Data Sheet, Typical Metering And Protection Schematic Diagram And Other Codes And Standard Attached Or Referred.:- 1.0) Mv Switchboard Which Include 1.1)-Tag No.: 1U64-Ss16-Pmcc-326 ; 1.2) Tag No.: 1U64-Ss16-Pmcc-327;1.3) Tag No.: 1U64-Ss16-Pmcc-328 1.4) Tag No.: 1U64-Ss16-Epmcc-329; 1.5) Tag No.: 1U64-Ss16-Epmcc-330; 1.6) Tag No.: 1U64-Ss16-Mcc-436 1.7) Tag No.: 1U64-Ss16-Mcc-437;1.8) Tag No.: 1U64-Ss16-Mcc-438 ;1.9)Tag No.: 1U64-Ss16-Emcc-439 1.10) Tag No.: 1U64-Ss16-Asb-503 ; 1.11) Tag No.: 1U64-Ss16-Mldb-501; 1.12) Tag No.: 1U64-Ss16-Eldb-502 1.13) Tag No.: 1U64-Ss16-Pdb-504 2.0) 415V Mv Bus Duct Duct Which Include 2.1) Tag No: Bd-326A; 2.2) Tag No: Bd-326B ; 2.3) Tag No: Bd-327A ; 2.4) Tag No: Bd-327B 2.5) Tag No: Bd-328A ; 2.6) Tag No: Bd-328 B; 2.7) Tag No: Bd-329A; 2.8) Tag No: Bd-329B ; 2.9) Tag No: Bd-330A ; 2.10) Tag No: Bd-330B 3.0) Condition Monitoring (Cm) And Asset Performance Management (Apm) And All Other Material Defined In The Material Requisition. 4.0) Relay Co-Ordination Study And Relay Settings. 5.0) Relay Co-Ordination Study And Relay Settings And All Other Scope As Defined In The Mr , Mandatory Spares For Sr No 1.1 , Scope As Per Material Requisition ( Mr) , Third Party Inspection Charges For Sr No 1.1 . , Site Work Which Include Testing, Pre-Commissioning, Commissioning Of All Relays, Multifunction Meters, Condition Monitoring And Asset Performance Management (Apm) System, Performance Guarantee Run, Handling Over To Client Detailedscope As Per Material Requisition ( Mr) , Training Requirement For Two Numbers Of Owner’S Engineer/Technical Assistants At Manufacturing Works For Three Days For The Operation And Maintenance Of 415V Mv Switchboard. , Training Requirement For Ten Numbers Of Owner’S Engineer/Technical Assistants At Site For One Week For The Operation And Maintenance Of 415 Mv Switchboard. , Transportation: For Indegenious Bidders : Inland Transportation Charges By Road Of All Supplies From Vendor’S Works / Shop To Project Site, Numaligarh Refinery, Golaghat, Asaam/ Rail Transportation Up To Nmgs/Numaligarh Refinery Project Siding. , Extended Warranty For 24 Months After Commissioning Or 36 Months After Dispatch Whichever Is Earlier For 415V Mv Switchboard And Busducts Separately. , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testingas Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Per Diem Charges Upto 8 Hrs On Normal Working Days. ( Bidders To Quoteunit Rate For Diem Charges ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testingas Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour (Beyond Normal 8 Hours On Normal Working Days). ( Bidders To Quote Over Timerate Per Hour ) , Unit Rate Forsupervision Sevices Of Erection And Commissioning / Performance Testingas Per Details Mentioned In Material Requisition For Quoted Items As Per Enclosed Instructions To Vendor Overtime Rate Per Hour For Work On Weekly Off Days / Holidays (As Applicable To Refinery Site). ( Bidders To Quote Over Timerate Per Hour )