Tripura State Electricity Corporation Limited-TSECL has published Construction Of 7.60Km 11Kv Line By Acsr Weasel, 26.42Kmlt Ab Cable Line (1Phase/3 Phase) Alongwith Construction Of11nos. 25Kva Distribution Sub-Station For Providing 350 Nos. Single Phase Service Connection To Pvtgs Household Under Electrical Division, U. Submission Date for this Tender is 07-03-2024. Transmission Line Tenders in udaipur Tripura. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply of 8.0 mtr. Long Steel Tubular Pole as per specification and drawing. |
2 | Supply of 9.0 mtr. Long PCC Pole, 200Kg. Working load as per specification and drawing. |
3 | Supply of 8.0 mtr. Long PCC Pole, 200Kg. Working load as per specification and drawing. |
4 | Supply of painted MS stay set completewith 16 mm. dia. 1.8 mtr. long painted stay rod, anchor plate of size 300 X 300 X 8 mm. thick, turn buckle of length 356 mm. with 300 mm. long threaded adjustable 16 mm. dia. MS rod and thimble |
5 | Supply of Galvanized Stranded stay wire (7/2.5mm) |
6 | Supply of Stay Insulator 11KV (Porcelin) |
7 | Supply of Stay Insulator LT (Porcelin) |
8 | Supply of 100X50X50X6MM MS channel |
9 | Supply of 75X40X40X6MM MS channel |
10 | Supply of 65x65X6MM MS angle |
11 | Supply of MS nuts & bolts (16X75mm) |
12 | Supply of MS nuts & bolts (16X90mm) |
13 | Supply of febricated clamps of assorted size of MS flat (50 x 6 mm) with double coat of red oxide primer coating . |
14 | Supply of Polimer insulators5KN with hardware fittings, hardware etc. as required as per the technical specification, approved drawing and scope of work. 11KV Pin insulator with hardware fittings. |
15 | Supply of 11KVComposite Polymeric Disc Insulator, Ball & Socket type, for 11KV system as per specifications conforming to ISS:731/1971. |
16 | Supply of 11KV disc fittings (6/1/2.59 to 6/1/3.35sq.mm) |
17 | Supply of ACSR (6/1/2.59 sq mm Weasel) |
18 | Supply of LT AB Cable 3x35+1x16+1x25 sqmm |
19 | Supply of LT AB Cable 1x25+1x16+1x25 sqmm |
20 | Supply of Suspension clamp Assembly with straps & buckle (25-70mm) for LT AB Cable |
21 | Supply of Dead end clamp Assembly with straps & buckle (25-50mm) for LT AB Cable |
22 | Supply of Distribution box 3 Phase (35 mm) for LT AB Cable |
23 | Supply of Distribution box 1 Phase (25 mm) for LT AB Cable |
24 | Supply of Eye hook (25mm) for LT AB Cable |
25 | Supply of Insulation Piercing Connector for LT AB Cable |
26 | Supply of Pole clamp (25 / 50) for fixing EYE hook for LT AB Cable |
27 | Supply of8 SWG GI Wire as per specification |
28 | Supply of10 SWG GI Wire as per specification |
29 | Supply of triple pole (3 phase), 12 KV, 200 Amp. Manually gang operated, air brake switch, 3 post vertical type single brake, complete with post insulator for operation in 11 KV, 50 Hz, AC system as per relevant IS specification. |
30 | Supply of triple pole (3 phase), 12 KV, 200 Amp. drop out fuse unit for operation in 11 KV, 50 Hz, AC system as per relevant IS specification along. |
31 | Supply of 9 KV, 5KA Gapless Silicon Polymeric Lightning Arrestors conform to IEC 60099-4 /IS-3070 Part-3 - 1993 with latest amendments |
32 | Supply of Single circuit re-wirable, extended type porcelain Kit Kat Fuse Units 100AMP as perspecification& drawing. |
33 | Supply of Lugs 70 sq.mm Aluminium make |
34 | Supply of fabricated 2.5mtr. Long , 40mm dia G.I.Pipe ( Make: TATA/ JINDAL) |
35 | Supply of 60Kg Salt & 55Kg Charcoal ( For 1 Pit earthing). |
36 | Supply of 1/2"" dia polythene pipe |
37 | Supplyof PVC insulated PVC sheated 1100 V Grade single core PVC cable 70 sq.mm |
38 | Supplyof PVC insulated PVC sheated 1100 V Grade single core PVC cable 2.5 sq.mm |
39 | Supply of Reel Insulator (4-10 sqmm) |
40 | Erection & commissioning 9.0 Mtr long Steel Tubular Poledirect in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification. |
41 | Erection & commissioning including carriage upto work site of8.0 Mtr long Steel Tubular Poledirect in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification. |
42 | Erection & commissioning including carriage upto work site of9.0 Mtr long PCC Poledirect in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification. |
43 | Erection & commissioning including carriage upto work site of8.0 Mtr long PCC Poledirect in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification. |
44 | Carriage of9.00 Mtr. long Steel Tubular Pole by Mechanical Transport from Bodhjun Nagar Store, Agartala to working site including loading, unloading and stacking as requiruired. |
45 | Carriage of materials (upto working site) such as Cable,AAC, AAAC, ACSR, G.I.Wire,Cross-Arm,Stay Set,Insulators etc., by Mechanical Transport from the Electrical Sub-Divisional Site Store to working site Vis-a-vis, including loading, unloading and stacking as required, upto the lead of 25KM & 50KM. |
46 | Carriage of11/0.430, 3-Phase 25KVA Transformer -11 nos.& 1-Phase energy meter-350nos. by Mechanical Transport from AD Nagar Store sub-division, Agartala to working site Vis-a-visincluding loading, unloading and placing on base, as required, |
47 | Erection & commissioning of Stay set direct in earth complete with 19mm x 1800 mm long stay rod, anchor plate of size 300 x 300 x 8 mm ,thimble, turn buckle, 7/3.15 mm dia G.I Standed stay wire and stain insulator etc. with Supply of M.S.Clamp,Nuts & Bolts etc. as required. and making complete in all respect. |
48 | Erection of fabricated M.S.Channel Cross-Arm, 2.8Mtr Long75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts) |
49 | Erection of M.S.Channel Cross-Arm, 0.8Mtr. Long100 x50 x 50 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts) |
50 | Erection of fabricated M.S.Channel Cross-Arm, 2.8Mtr. Long100 x50 x 50 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts) |
51 | Erection of fabricated M.S.Angle Cross-Arm,2.8 Mtr. Long 65 x65 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts) |
52 | Erection of fabricated M.S.Channel Cross-Arm, 2.2Mtr. Long 75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts) |
53 | Erection of fabricated M.S.Channel Cross-Arm, 1.2Mtr. Long 75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts) |
54 | Fabrication of fabricated M.S.Channel Cross-Arm,0.3 Mtr. Long75 x40 x 40 x 6 mm( Excluding the cost of Back Clamp, Nuts & Bolts) |
55 | Erection of fabricated M.S.Angle Cross-Arm,2.5 Mtr. Long 65 x65 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts) |
56 | Erection of fabricated M.S.Angle Cross-Arm, 1.6 Mtr. Long 65 x65 x 6 mm( Excluding the cost of Back Clamp, Nuts & Bolts) |
57 | Erection & commissioning of 11KVpin insulator along with Pin. |
58 | Erection & commissioning of 11KV Single Disc insulator set along with necessary fittings. |
59 | Laying, Stringing & commissioning of 1KM (Single Conductor) ACSR 6/1/2.59 mm dia "weasel" including hoisting & binding etc. Complete as required. |
60 | Positioning of cable drum, removing of cable from drum and Laying, hoisting & drawing of AB Cable 3X35+1x16+1x25 sqmmof 1.1 KV grade as per direction of Engineering In-Charge. |
61 | Positioning of cable drum, removing of cable from drum and Laying, hoisting & drawing of AB Cable 1X25+1x16+1x25 sqmmof 1.1 KV grade as per direction of Engineering In-Charge. |
62 | Erection & Fitting-Fixingof Insulated suspention Clamp including Pole clamp, Eye hook for cable massenger of 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps &bucklesas per direction of Engineering In-Charge. |
63 | Erection & Fitting-Fixingof Insulated Dead end enchoring Clamp including Pole clamp, Eye hook for cable massenger of 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps & bucklesasper direction of Engineering In-Charge. |
64 | Erection, Fitting-Fixingof Service main 1/3Phase distribution Boxof 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps &bucklesasper direction of Engineering In-Charge. |
65 | Erection & Fitting-Fixingof Insulation Piercing Connectors(IPC) all sizes of 1.1 KV grade including connection from main cable to Distribution box, Tee-Off line asper direction of Engineering In-Charge. |
66 | Laying& strining of 1KM (Single Conductor), 8SWG GI wire including hoisting & binding etc. Complete as required. |
67 | Erection of 11KV protective Guarding by GI wire 8 SWG as per technical specification,across road/River/Telecom line etc. in horizonta formation complete . |
68 | Erection of 11KV 200 Amp. GOS unit set of three nos.including necessary connection complete as per technical specification.(Excluding the cost of back clamp,Nuts & Bolts) |
69 | Erection of 11KV DOF unit set of three nos.including necessary connection complete as per technical specification.(Excluding the cost of back clamp,Nuts & Bolts) |
70 | Installation/Positioningof 11/0.430KV,3-Phase25KVA of Distribution Transformer on Polewith necessary connections & fitting fixing of all allied accessories components asrequired for making complete in all respect for energizing. |
71 | Erection of 9 KV, 5KA Gapless Silicon Polymeric Lightning Arrestors conform to IEC 60099-4 /IS-3070 Part-3 - 1993 with latest amendments |
72 | Earthing with G.I pipe 2.5mtr. Long and 40mm dia, including excavation, refilling with alternate layer of salt & Charcoal as per drawing (excluding supply of G.I.Pipe,Salt & Charcoal, Gi wire, nuts &bolts, etc. as required) |
73 | Febrication of different sizes Cross-Armsby MS Channel/MS Angle as per specification |
74 | Maintaining adequate clearance from overhead live conductors by Trimming of tree branches for Way Leaves. |
75 | Providing single Phase Service Connection with laying PVC cable from nearby Electrical pole to Premises upto 35mtr. in length supported by G.I.Wire,Reel Insulator i/c fitting fixing of Energy Meter & wooden meter board as required .(excluding cost of single phase energy meter & meter board) |
76 | INTERNAL HOUSE WIRINGSupply & erection of 1- Phase Main Switch 63Amp (ISI Marked) |
77 | Providing earthing with 40mm dia coil of G I wire of spiral length 450mm of outer dia 50mm closely wound about 115 turns i/c excavation ,refilling with alternate layer of salt & charcoal I/c supply of salt & charcoal etc.as required (excluding cost of 10 SWG GI wire) |
78 | Supply of Wooden Plank (1.5"x1""x8") |
79 | Supply & erection of 9W LED Bulb, Bajaj/Havells/crompton |
80 | Supply & erection of Angle Holder(ISI Marked) |
81 | Supply & erection of 4""x4"" switch Board PVC (white) |
82 | Supply & erection of Piono Switch5 Amp (ISI Marked) |
83 | Wiring for Circuit/Sub-main including Supply of 1-Core copper cable of size 1.5 sqmm |
84 | Supply & erection of Galvanized threaded screw (per connection 20nos. Screw) |