}

Bids Are Invited For Mandap And Elecrical Items For Election Mandap (With Swing) Mandap (Without Swing) Mandap Waterproof (Without Swing) Mandap Side Wall Temporary Wooden Ramp At Polling Station (1:12) (Width At Least 3 Feet) Work Of Preparing 100, PATAN-Gujarat

General Administration Department has published Bids Are Invited For Mandap And Elecrical Items For Election Mandap (With Swing) Mandap (Without Swing) Mandap Waterproof (Without Swing) Mandap Side Wall Temporary Wooden Ramp At Polling Station (1:12) (Width At Least 3 Feet) Work Of Preparing 100. Submission Date for this Tender is 02-03-2024. Tent Tenders in PATAN Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

42599172
Bids Are Invited For Mandap And Elecrical Items For Election Mandap (With Swing) Mandap (Without Swing) Mandap Waterproof (Without Swing) Mandap Side Wall Temporary Wooden Ramp At Polling Station (1:12) (Width At Least 3 Feet) Work Of Preparing 100
Open Tender
Indian
Gujarat
Patan
02-03-2024

Tender Details

Bids Are Invited For Mandap And Elecrical Items For Election Mandap ( With Swing ) Mandap ( Without Swing ) Mandap Waterproof ( Without Swing ) Mandap Side Wall Temporary Wooden Ramp At Polling Station ( 1:12 ) ( Width At Least 3 Feet ) Work Of Preparing 100 Meter Boundary With Lime At Polling Station ( 1220 Polling Stations ) . Stage And Steps ( Including Carpet ) ( For 1 Day ) Stage And Steps ( Including Carpet ) ( For 2 To 6 Days ) Back Stage Cloth Curtain ( Blue Color / White ) ( For 1 Day ) Red Carpet ( In Case Of Model Polling Stations Only ) ( For 1 Day ) Green Flooring ( For 30 To 45 Days ) Quilt ( For 1 Day ) Sheets ( For 1 Day ) Blankets ( For 1 Day ) Shetaranji ( For 1 Day ) Mattresses ( For 1 Day ) Pillow ( For 1 Day ) Decorated Entrance ( For Model Polling Station Only ) ( For 1 Day ) Decorative Gate ( For Model Polling Station Only ) ( For 2 Days ) Decoration With Artificial Flowers ( For 1 Day ) Decoration With Artificial Flowers ( For R Days ) Wooden Barricading ( 6 Feet Height ) ( Counting Centre ) ( For 1 Day ) Wooden Barricading ( 6 Feet Height ) ( Counting Centre ) ( For R Days ) Wooden Barricading ( 6 Feet Height ) ( Counting Center ) ( For 30 To 45 Days ) Iron Pipe Barricading ( 6 Feet Height ) ( For 1 Day ) Iron Pipe Barricading ( 6 Feet Height ) ( For R Days ) Iron Pipe Barricading ( 6 Feet Height ) ( For 30 To 45 Days ) Pvc ( Plastic ) Chair ( For 30 To 45 Days ) Cushioned Chair ( Model Ps Only ) ( Iron / Wooden / Pvc ) ( For 1 Day ) Cushioned Chair ( For Training ) ( Iron / Wooden / Pvc ) ( For R Day ) Cushioned Chair ( For Observer ) ( Iron / Wooden / Pvc ) Revolving Chair ( For 3 To 6 Days ) Tipoi ( Standard Size ) ( For 1 Day ) Table 3 X 2 ( Without Table Cloth ) ( For 1 Day ) 4 X 2 Feet Table ( With Table Cloth ) ( For 3 To 45 Days ) 1 Seater Sofa ( For 1 Day ) 2 Seater Sofa ( For 1 Day ) 3 Seater Sofa ( For 1 Day ) Wooden Partition ( For 1 Day ) Wooden Partition ( For 2 Days ) Wooden Partition ( For 3 To 45 Days ) Partition Of Galvanized Sheet ( With Cloth ) ( For 1 Day ) Partition Of Galvanized Sheet ( With Cloth ) ( For 2 Days ) Partition Of Galvanized Sheet ( With Cloth ) ( For 3 To 45 Days ) Galvanized Iron Grating At Counting Center ( For 1 Day ) Led Tubelight ( Rar Watt ) ( For 1 Day ) Led Tubelight ( Rar Watt ) ( For R Day ) Led Tubelight ( Rar Watt ) ( For 30 To 45 Days ) Led Tubelight ( Ror Watt Fitting With Holder Wire ) ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Led Tubelight ( Ror Watt Fitting With Holder Wire ) ( For R Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Led Tubelight ( Ror Watt Fitting With Holder Wire ) ( For 30 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Flood Light 100 Watt With Fitting Holder Wire ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Flood Light 100 Watt With Fitting Holder Wire ( For R Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Flood Light 100 Watt With Fitting Holder Wire ( For 30 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Halogen Fitting 500 Watt ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Halogen Fitting 500 Watt ( For 30 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) 1000 Watt Halogen Fitting With Holder Wire ( Outdoor Type ) ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) 1000 Watt Halogen Fitting With Holder Wire ( Outdoor Type ) ( For R Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) 1000 Watt Halogen Fitting With Holder Wire ( Outdoor Type ) ( For 30 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Sound System ( For 1 Day ) Extra Speaker-1000 Watt ( For 2 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Extra Amplifier 50 Watts ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Extra Amplifier 50 Watt ( For 2 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Extra Cordless Microphone ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Extra Collar / Button Mic ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Microphone ( For 1 Day ) Pedal Stand Fan Ceiling Fan Heavy Duty Air Circulator ( For 2 To 6 Days ) ( Jumbo Cooler ) ( 60 Ltr ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Temporary Plug Point ( 15 Amp ) ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Temporary Plug Point ( 15 Amp ) ( For 2 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Distribution Board ( Three Phase 440 Watt ) 4-6 Way ( For 1 Day ) Distribution Board ( Three Phase 440 Watt ) 8-12 Way ( For 2 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Generator Set ( 125 Kva ) ( For 1 Day ) ( With Fuel, Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Generator Set ( 125 Kva ) ( For R Day ) ( With Fuel, Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Generator Set ( 125 Kva ) ( For 3 To 45 Days ) ( With Fuel, Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Generator Set ( 250 Kva ) ( For 1 Day ) Poles For Lights ( 1 To 15 Feet High ) ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Poles For Lights ( 1 To 15 Feet High ) ( For 2 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Dp Switch 16 / 32 Amp ( For 1 Day ) ( Mcb / Icdp As Per Site Requirement ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Dp Switch 16 / 32 Amp ( For 2 To 45 Days ) ( Mcb / Icdp As Per Site Requirement ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Tp Switch 16 / 3R Amp ( For 1 Day ) ( Mcb / Ictp As Per Site Requirement ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Tp Switch 16 / 32 Amp ( For 2 To 45 Days ) 63 To 100 Amp Busbar Up To 1 Meter ( For 2 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) 200 Amp Busbar Up To 1 Meter ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) 200 Amp Busbar Up To 1 Meter ( For 2 To 45 Days ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Change Over Switch 4 Pole 63 Amp ( For 1 Day ) ( With Fitting, Holder, Wiring And Cabling And Other Necessary Item ) ( From Source Point To Distribution Point ) Change Over Switch 4 Pole 63 Amp ( For 2 To 45 Days ) Change Over Switch 4 Pole 200-300 Ampere ( For 2 To 45 Days ) Section Peeler 75 X 60 X 45 ( For 1 Day ) Elcb Switch Three Phase 100 Amp 4 Pole ( For 2 To 45 Days ) 3.5 Kv Ups With 4 Hours Backup ( For 2 To 45 Days ) Split Ac 1.5 Ton ( For 1 Day ) Tower Ac. 4 Tonnes ( For 1 Day ) Ductoable Ac Unit ( 5 To 6 Ton ) Total Quantity : 417191

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail