Tender For Providing Reconductoring Of 11 Kv Ht Line Of Rakker Feeder Feeding From 33/11 Kv Unmanned Substation Bharoli Jadid With Acsr 6/1/2.11 Mm Into Aaac7/3.15 Mm From Chouli To 4 Pole Structure Kuhna Under Esd Shantla( Ts No:- 121/2021-22, Sa-1339188
Tender Overview
Project Description
Tender For Providing Reconductoring Of 11 Kv Ht Line Of Rakker Feeder Feeding From 33 / 11 Kv Unmanned Substation Bharoli Jadid With Acsr 6 / 1 / 2.11 Mm Into Aaac7 / 3.15 Mm From Chouli To 4 Pole Structure Kuhna Under Esd Shantla ( Ts No:- 121 / 2021-22, Sa-1339188 )
BOQ
| Sl. No. | Item Description |
| 1 | Supply Part HT Line |
| 2 | RCC Muff 2000mm Long withconcrete filling |
| 3 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 1270 mm x 11Nos]. |
| 4 | MS Angle Iron (50X50x6 mm), Length: 750 mm x 2 |
| 5 | Pole Top Bracket made of (M.S. C.I. 100x50X6mm)100mm |
| 6 | MSAI.Belt Set for X-Bracing set of Size (1800x50x50x6 mm)for Double Pole str. (2Nos per Set) . |
| 7 | MSAI Bracing Set for X-Bracing set for double pole str of Size 2125x50X50x6mm each ( 2 Nos per set ). |
| 8 | MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2340 mm X 2 Nos/ Structure] for Dead /Double Pole Structure. |
| 9 | Half clamps made of MS Flat size 50x6mm for X-Bracing Set (4Nos per Set) . |
| 10 | Discs insulator sets (comprising 1 No. Disc: (Porcelain Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave,Bend Stapple, Dead End Clamps etc.)(one set 3 Nos) |
| 11 | 11 kV Pin Insulators (Porcelain 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure) |
| 12 | H.T. Stay Set complete with hellically fitting i/c Egg insulator, Guy assembly etc. |
| 13 | Stay wire 7/3.15 mm@ 9.00 kG per stay set |
| 14 | Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm). |
| 15 | HT Pipe Earthing Set complete in all respect. |
| 16 | GI Wire 8SWG : for Continous Earth wire {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)}including Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 Mtr spacing] at road crossings {0.102 kg/m} |
| 17 | Eye Hook for for Earth wire |
| 18 | M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)] |
| 19 | Red Oxide |
| 20 | Aluminium Paint |
| 21 | GO switch Handle Supporting Channel 75x40x6 mm length 460 mm |
| 22 | GO AB Switch Unit (400 Amp, 25 kVA ) Triple Pole OD Type |
| 23 | Barbed Wire |
| 24 | Danger Plate (250X200X1.6 mm) |
| 25 | 4. ERECTION OF 11KV HT LINE : Erection of Single Pole Run through Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paintetc.Complete in all respect. |
| 26 | Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole 9Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paintetc.Complete in all respect. |
| 27 | Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. |
| 28 | Erection of HT Earthing Set as per latest standard practices /specification of REC / HPSEBLincluding digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same andprov. earthing connectioncomplete in all respect. |
| 29 | Laying of Conductor, Stringing, Sagging ofAAAC, 55mm² /7/3.15mm² and binding with Insulators (3 wires) and fixing of jumper. |
| 30 | Laying ofEarth wire with GI Wire 8SWG , Stringing, Sagging ofand binding with Insulators. |
| 31 | Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Nos.). |
| 32 | Erection of GO switch |
| 33 | Add Transportation charges for the carriage material of HT Line & other allied materail by road for complete job. (1 trips of vehicle) |
| 34 | Add manual carriage loading / unloading/ stacking charges for the carriage material of HT from road to site of work with an average lead of 2.1 Km complete job. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.