Indian Oil Corporation Limited-IOCL has published Tender For Rate Contract For Hiring Of Agency For Hydro-Testing Of Cng Cascades In And Maharashtra, Rajasthan, Madhya Pradesh, Punjab And Jammu (Group B). Submission Date for this Tender is 27-03-2024. Testing Machine Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 21-Mar-2024 | Corrigendum_1 | Date | 27-03-2024 |
Sl. No. | Item Description |
1 | GST % for this Tender Please select the rate of GST in Cell AY13. Rate selected shall be applicable for the entire BOQ. |
2 | Decommissioning of the CNG cascade of 3000 ltrs water capacity (Cylinder Capacity 500WL) at CNG Stations, new tubing/ modification work to isolate gas from charged installation, dismantling the cascade, necessary tubing work to resume operations of the station, loading of cascade on the truck, transportation (including transit insurance) as per PESO guidelines, shifting to bidder’s testing facility and sending the cascade back after retesting to Owner"s CNG station, Certification ofCascade, loading on the original location, refitting, leak testing at site, re-commissioning etc as per scope of work & technical specifications of the tender document. Refurbishment, Retesting and Certification of CNG Storage Cascade of 3000 ltrs water capacity including mandatoryhydrostatic stretch test of CNG cascade cylinders as per The Gas Cylinder Rules 2016(Latest Amendment/Version if any), IS:8451 2009, PESO guidelines and other prevailing Codes & Standards as per scope of work & technical specifications mentioned in the tender document. Third Party Inspection Agency to be deployed by Contractor for quality Control, Certification and Inspection. |
3 | Decommissioning of the CNG cascade of 3000 ltrs water capacity (Cylinder Capacity 75WL) at CNG Stations, new tubing/ modification work to isolate gas from charged installation, dismantling the cascade, necessary tubing work to resume operations of the station, loading of cascade on the truck, transportation (including transit insurance) as per PESO guidelines, shifting to bidder’s testing facility and sending the cascade back after retesting to Owner"s CNG station, Certification ofCascade, loading on the original location, refitting, leak testing at site, re-commissioning etc as per scope of work & technical specifications of the tender document. Refurbishment, Retesting and Certification of CNG Storage Cascade of 3000 ltrs water capacity including mandatoryhydrostatic stretch test of CNG cascade cylinders as per The Gas Cylinder Rules 2016(Latest Amendment/Version if any), IS:8451 2009, PESO guidelines and other prevailing Codes & Standards as per scope of work & technical specifications mentioned in the tender document. Third Party Inspection Agency to be deployed by Contractor for quality Control, Certification and Inspection. |
4 | Decommissioning of the CNG cascade of 4500 ltrs water capacity (Cylinder Capacity 75WL) at CNG Stations, new tubing/ modification work to isolate gas from charged installation, dismantling the cascade, necessary tubing work to resume operations of the station, loading of cascade on the truck, transportation (including transit insurance) as per PESO guidelines, shifting to bidder’s testing facility and sending the cascade back after retesting to Owner"s CNG station, Certification ofCascade, loading on the original location, refitting, leak testing at site, re-commissioning etc as per scope of work & technical specifications of the tender document. Refurbishment, Retesting and Certification of CNG Storage Cascade of 4500 ltrs water capacity including mandatoryhydrostatic stretch test of CNG cascade cylinders as per The Gas Cylinder Rules 2016(Latest Amendment/Version if any), IS:8451 2009, PESO guidelines and other prevailing Codes & Standards as per scope of work & technical specifications mentioned in the tender document. Third Party Inspection Agency to be deployed by Contractor for quality Control, Certification and Inspection. |
5 | Decommissioning of the CNG cascade of 9360 WL ltrs water capacity at CNG Stations, new tubing/ modification work to isolate gas from charged installation, dismantling the cascade, necessary tubing work to resume operations of the station, loading of cascade on the truck, transportation (including transit insurance) as per PESO guidelines, shifting to bidder’s testing facility and sending the cascade back after retesting to Owner"s CNG station, Certification ofCascade, loading on the original location, refitting, leak testing at site, re-commissioning etc as per scope of work & technical specifications of the tender document. Refurbishment, Retesting and Certification of CNG Storage Cascade of 8800-9400 WL ltrs water capacity including mandatoryhydrostatic stretch test of CNG cascade cylinders as per The Gas Cylinder Rules 2016(Latest Amendment/Version if any), IS:8451 2009, PESO guidelines and other prevailing Codes & Standards as per scope of work & technical specifications mentioned in the tender document. Third Party Inspection Agency to be deployed by Contractor for quality Control, Certification and Inspection. |
6 | Shifting of spare CNG cascade of 3000/ 4500/ 9360 ltrs water capacity from Owner"s stores/ yard to CNG Stations after dismantling of original Cascade at CNG Station. Scope includes loading, transportation & unloading, arranging transit insurance of spare cascade, necessary tubing/ modification work, refitting, leak testing, commissioning of spare cascade, testing, commissioing to make spare cascade fully operational for the testing duration of original cascade.; Shifting of spare CNG cascade of 3000/ 4500 /8800-9400 ltrs water capacity from CNG station to Owner"s stores/ yard after replacement and making fully operaional of original Cascade at CNG Station. |
7 | List of Spare Parts - 3000/ 4500 WL |
8 | ADAPTOR 1/4" NPTM X 1/4" NPTF |
9 | END PLUG 1/4" NPTM |
10 | ADAPTOR WITH O"RING & B/U RING(FRONT) 3 1/4" -8UN 2A X T4 S2 (F) AS PER IS 3224:2004 (1" BS 431) As per drawing and documents given in Tender Doc. |
11 | Plug, Size : ¾" OD, SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
12 | Plug Size : ½" OD, SS Material Grade TP316 / TP316L as per ASTM A269 (Rated pressure : 5000 PSI @ 70°F Temperature : 0°F to 400°F) |
13 | FERRULE(fron and back),SS316,3/4IN OD,SIZE:: 3/4 IN TYPE: SWAGE LOCK |
14 | FERRULE(fron and back),,SS316,1/4IN OD, SIZE:: 1/4 IN TYPE: SWAGE LOCK |
15 | FERRULE,SS316, 3/8" OD, SIZE:: 1/4 IN TYPE: SWAGE LOCK |
16 | SS -316 NUT 3/8 OD, CNG CYL 75WL, MAKE: PARKER/SWAGELOK |
17 | SS -316 NUT 3/4 OD, CNG CYL 75WL, MAKE: PARKER/SWAGELOK |
18 | SS -316 NUT 1/2 OD, CNG CYL 75WL, MAKE: PARKER/SWAGELOK |
19 | SS-316 UNION 3/4 OD, CNG CYL 75WL, MAKE: PARKER/SWAGELOK |
20 | SS-316 STRAIGHT REDCR 3/4" X 1/2 "OD. SS-316, CNG CYL 75WL, MAKE:PARKER/SWAGELOK |
21 | 3/4" OD-2 Way Fitting (90° ELBOW) |
22 | Male Connector 3/8" OD x 1/4" NPTM |
23 | MALE CONNECTOR 3/4" OD x 1/4" NPT |
24 | Cylinder Valve (PRD) with Burst Disc/ Fusible Plug Vanaaz make |
25 | Bull Nose Connector 3/4" OD |
26 | SS Tube 3/4" OD x 0.095"Thk (Annealed ASTM A-269), Sandvik/ Parker/ Tubacex Make |
27 | SS Tube 1/2" OD x 0.083"Thk (Annealed ASTM A-269), Sandvik/ Parker/ Tubacex Make |
28 | SS Tube 1/4" OD x 0.035"Thk (Annealed ASTM A-269), Sandvik/ Parker/ Tubacex Make |
29 | SS Tube 3/8" OD x 0.035" Thk. (Annealed ASTM A 269) |
30 | 3/4" OD-3 Way Fittings |
31 | 3/4" OD-4 Way Fittings |
32 | Straight Reducer Turned 3/4" OD x Machined 1/4" OD |
33 | Male Connector 1/4" OD x 1/2" NPTM |
34 | Two Valve Monifold Block 1/2" NPTF Inlet & Outlet |
35 | Manifold, 2-way, 1/2" Female-NPT, SS316, 250Kg.Cm2Op. pr. |
36 | Glycerine Filled Pressure Gauge (4" Dial) (0-400 kg/cm2) End Con. 1/2" NPTM |
37 | Non Return Valve 3/4" OD |
38 | Safety Relief Valve (Pressure not exceeding 20% above maximum allowable working pressure of the system) 1/4" OD Tube |
39 | 3/4" OD -2 Way Ball Valve (Panel Mounting) |
40 | Female Bulk Head Connector 1/4" OD x 1/4" NPT (F) |
41 | Bleed Valve 1/4" NPT |
42 | Straight Reducer 3/4" OD x 3/8" OD TUBE |
43 | Cylinder Valve knob for 75WL Capacity Cylinder |
44 | SS Female Bulk Head Connector 1/4" OD X 1/4" FNPT |
45 | Male Connector 1/4" OD x 3/4" NPTM |
46 | Male Connector 3/8" OD x 3/4" NPTM |
47 | Male Connector 1/4" OD x 3/8" NPTM |
48 | Male Connector 1/4" OD x 1/4" NPTM |
49 | Male Connector 1/2" OD x 3/8" NPTM |
50 | Male Connector 3/8" OD x 3/8" NPTM |
51 | List of Spare Parts - 9360WL |
52 | Equal Cross,1/2" OD |
53 | Equal Tee, 1/2" OD |
54 | Male Connector, 1/2" OD X 1/4" NPTM |
55 | Equal Tee, 1/4" OD |
56 | Male Connector, 1/4" OD X 1/2" NPTM |
57 | Plug for Unused port, 1/4" NPTM |
58 | Male Connector, 1/4" OD X 1/4" NPTM |
59 | Male Connector, 1/2" OD X 1/4" NPTM |
60 | Equal Tee, 3/4"OD |
61 | Unequal Tee, 3/4"OD X 1/2" X 3/4" OD |
62 | Ball Valve, 3/4"OD |
63 | Ball Valve, 1/2" OD |
64 | Male Connector, 1/2" OD X 1/2" NPT |
65 | Valve Manifold,3 Way with vent & Isolation (1/2 NPTF X 1/2 NPTF X 1/4 NPTF) |
66 | Pressure Gauge, /2" NPTM, 4"Glycerine filled, Dial Range 0-400 Bar |
67 | Male Connector,3/4"OD x 1/2" NPTM |
68 | SRV, 1/4"OD 1/4" NPTM with 1/2 OD 1/4"NPTF Connector |
69 | Equal Cross, 3/4"OD |
70 | Male Connector,3/4" OD X 1/4" NPTM |
71 | Cylinder Valve,EMER |
72 | Temp Gauge, 1/2" NPTM, 4"Glycerine filled, Dial Range 0-400 Bar |
73 | Male Connector,3/4" OD X 3/8" NPTM |
74 | p014508 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail