Rural Development Government Departments Closing in 0 days TDR #42584946

Tender For Construction Of Adventure Zone At Mechukha

Issued by Government Departments · Shi Yomi, Arunachal Pradesh
Tender Value
1.97 Crore
Estimated cost
Bid Submission
06 Mar 2024
0 days left
EMD
1.97 Lakhs
Bank guarantee accepted
Document Fee
8000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Shi Yomi → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Adventure Zone At Mechukha Construction Of Zipline At Adventure Park, Construction Of Cafeteria At Adventure Park, Construction Of Recreational Hall At Singbir, Cc Path And Waiting Shed At Pilgrimage Site At Sekar

BOQ

Name of Work: DEVELOPMENT & C/O INFRASTRUCTURE FOR ADVENTURE TOURISM CENTRE (ATC) IN ARUNACHAL PRADESH “SH: ADVENTURE ZONE AT MECHUKHA
Sl. No. Item Description
1Construction of Zipline at Adventure Park
2Earthwork in excavation over areas (Not exceeding 30 cm in depth, 1.50 m in width as well as 10 Sq.m. on plan) including disposal of surplus excavated earth lead upto 50 m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed.
3OS
4HS
5Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m
6Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
7Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcementin :b) 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
8Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.c) 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
9Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :b) Walls including attached buttresses, pilasters and their caps andbases and string courses etc. up to floor two level.
10Reinforcement of RCC work including bending, binding and placing in position completeb) Cold twisted bars.
11Centring and shuttering including strutting, propping etc and removal of form work for :
12a) Foundation, footings, bases of columns etc. and mass concrete.
13e) Column, pillars, posts and struts etc.
14b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
15Providing approved best available local wood (Class - B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position.
1625 mm thick wooden plank walling butt jointed with wooden beading 50 x 25 mm including supplying and fixing with necessary nails, screws etc complete.
17Procurement of Zipline equipments
18Zip Line Cable
19Harness
20Helmet
21Carabiner
22Gloves
23Pulley
24Trolley
25Lanyards
26Nylon rope
27Size malleable cable clamps
28Two eye to eye turn buckles
29Rubber tube
30Zipline Brake
31Installation and construction charge for Zipline
32Construction of Cafeteria at Adventure Park
33Devlopment of SiteEarthwork in excavation over areas (Not exceeding 30 cm in depth, 1.50 m in width as well as 10 Sq.m. on plan) including disposal of surplus excavated earth lead upto 50 m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed.
34OS
35HS
36BuildingEarth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m
37Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
38Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcementin :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
39Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
40Providing U clamps with nuts and bolts
41Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :b) Walls including attached buttresses, pilasters and their caps andbases and string courses etc. up to floor two level.
42Reinforcement of RCC work including bending, binding and placing in position completeb) Cold twisted bars.
43Centring and shuttering including strutting, propping etc and removal of form work for :
44a) Foundation, footings, bases of columns etc. and mass concrete.
45e) Column, pillars, posts and struts etc.
46b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
47Providing approved best available local wood (Class - B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position.
48Providing best available local wood (Class - B II) work in frames of false ceiling, partitions and trusses etc, sawn and put up in position.
49Providing corrugated G.I.sheet roofing fixed with galvanised iron J or L hooks, bolts & nuts 8 mm dia with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses.b) 0.63 mm thick GI sheet
50Providing ridges or hips 60 cm overall in plain G.I. sheet fixed with galvanised iron J or L hooks, bolts and nuts 8 mm dia. G.I. limpet and bitumen washers complete. b) 0.63 mm thick GI sheet
5125 mm thick wooden plank walling butt jointed with wooden beading 50 x 25 mm including supplying and fixing with necessary nails, screws etc complete.
52Providing and fixing panelled, glazed or panelled and glazed shutters for doors, windows and clerestory windows including aluminium butt hinges with necessary screws.a) 38mm thick best available local wood class - B I
53Soft wood 25 mm plankings tongued and grooved in flooring including fixing with screw complete.
54Providing and fixing 20 mm thick wooden planks ceiling (frame work for base to be paid separately) with M.S. screws.a) Timber Plank Class - A IV
55Applying priming coat of a mixture of red lead raw linseed oil and turpentine oil in the ratio of 2.80 Kg : 1 Litre : 1 Litre on steel work complete.
56Applying priming coat with ready mixed pink primer of approved brand and manufacture on wood work complete.
57Painting two or more coats (excluding priming coat) with superior ready mixed paint for wood work of approved brand and manufacture in all shades on new work to give an even shade.
58Applying priming coat with ready mixed pink primer approved brand and manufacture on steel work complete.
59Painting two or more coat (excluding priming coat) with superior ready mixed paint for steel work……..
60Providing eve board 25mm thick approved local wood eves boards 23mmwide with necessary moulding etc.
61Construction of Recreational Hall at Singbir
62Devlopment of SiteEarthwork in excavation over areas (Not exceeding 30 cm in depth, 1.50 m in width as well as 10 Sq.m. on plan) including disposal of surplus excavated earth lead upto 50 m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed.
63OS
64HS
65BuildingEarth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m
66Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
67Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcementin :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
68Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
69Providing U clamps with nuts and bolts
70Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :b) Walls including attached buttresses, pilasters and their caps andbases and string courses etc. up to floor two level.
71Reinforcement of RCC work including bending, binding and placing in position completeb) Cold twisted bars.
72Centring and shuttering including strutting, propping etc and removal of form work for :
73a) Foundation, footings, bases of columns etc. and mass concrete.
74e) Column, pillars, posts and struts etc.
75b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
76Providing approved best available local wood (Class - B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position.
77Providing best available local wood (Class - B II) work in frames of false ceiling, partitions and trusses etc, sawn and put up in position.
78Providing corrugated G.I.sheet roofing fixed with galvanised iron J or L hooks, bolts & nuts 8 mm dia with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses.b) 0.63 mm thick GI sheet
79Providing ridges or hips 60 cm overall in plain G.I. sheet fixed with galvanised iron J or L hooks, bolts and nuts 8 mm dia. G.I. limpet and bitumen washers complete. b) 0.63 mm thick GI sheet
8025 mm thick wooden plank walling butt jointed with wooden beading 50 x 25 mm including supplying and fixing with necessary nails, screws etc complete.
81Providing and fixing panelled, glazed or panelled and glazed shutters for doors, windows and clerestory windows including aluminium butt hinges with necessary screws.a) 38mm thick best available local wood class - B I
82Soft wood 25 mm plankings tongued and grooved in flooring including fixing with screw complete.
83Providing and fixing 20 mm thick wooden planks ceiling (frame work for base to be paid separately) with M.S. screws.a) Timber Plank Class - A IV
84Applying priming coat of a mixture of red lead raw linseed oil and turpentine oil in the ratio of 2.80 Kg : 1 Litre : 1 Litre on steel work complete.
85Applying priming coat with ready mixed pink primer of approved brand and manufacture on wood work complete.
86Painting two or more coats (excluding priming coat) with superior ready mixed paint for wood work of approved brand and manufacture in all shades on new work to give an even shade.
87Applying priming coat with ready mixed pink primer approved brand and manufacture on steel work complete.
88Painting two or more coat (excluding priming coat) with superior ready mixed paint for steel work……..
89Providing eve board 25mm thick approved local wood eves boards 23mmwide with necessary moulding etc.
90CC Path & Waiting Shed at pilgrimage site at Sekar
91Devlopment of SiteEarthwork in excavation over areas (Not exceeding 30 cm in depth, 1.50 m in width as well as 10 Sq.m. on plan) including disposal of surplus excavated earth lead upto 50 m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed.
92OS
93HS
94Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
95BuildingEarth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m
96Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
97Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcementin :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
98Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
99Providing U clamps with nuts and bolts
100Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :b) Walls including attached buttresses, pilasters and their caps andbases and string courses etc. up to floor two level.
101Reinforcement of RCC work including bending, binding and placing in position completeb) Cold twisted bars.
102Centring and shuttering including strutting, propping etc and removal of form work for :
103a) Foundation, footings, bases of columns etc. and mass concrete.
104e) Column, pillars, posts and struts etc.
105b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
106Providing approved best available local wood (Class - B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position.
107Providing best available local wood (Class - B II) work in frames of false ceiling, partitions and trusses etc, sawn and put up in position.
108Providing corrugated G.I.sheet roofing fixed with galvanised iron J or L hooks, bolts & nuts 8 mm dia with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses.b) 0.63 mm thick GI sheet
109Providing ridges or hips 60 cm overall in plain G.I. sheet fixed with galvanised iron J or L hooks, bolts and nuts 8 mm dia. G.I. limpet and bitumen washers complete. b) 0.63 mm thick GI sheet
11025 mm thick wooden plank walling butt jointed with wooden beading 50 x 25 mm including supplying and fixing with necessary nails, screws etc complete.
111Providing and fixing panelled, glazed or panelled and glazed shutters for doors, windows and clerestory windows including aluminium butt hinges with necessary screws.a) 38mm thick best available local wood class - B I
112Soft wood 25 mm plankings tongued and grooved in flooring including fixing with screw complete.
113Providing and fixing 20 mm thick wooden planks ceiling (frame work for base to be paid separately) with M.S. screws.a) Timber Plank Class - A IV
114Applying priming coat of a mixture of red lead raw linseed oil and turpentine oil in the ratio of 2.80 Kg : 1 Litre : 1 Litre on steel work complete.
115Applying priming coat with ready mixed pink primer of approved brand and manufacture on wood work complete.
116Painting two or more coats (excluding priming coat) with superior ready mixed paint for wood work of approved brand and manufacture in all shades on new work to give an even shade.
117Applying priming coat with ready mixed pink primer approved brand and manufacture on steel work complete.
118Painting two or more coat (excluding priming coat) with superior ready mixed paint for steel work……..
119Providing eve board 25mm thick approved local wood eves boards 23mmwide with necessary moulding etc.

AI Tender Summary

OUR REF NO 42584946
AUTHORITY Government Departments
TENDER VALUE 1.97 Crore
LAST DATE 06-03-2024
Authority
Authority Name Rural Works Department
Work Description Construction Of Adventure Zone At Mechukha Construction Of Zipline At Adventure Park, Construction Of Cafeteria At Adventure Park, Construction Of Recreational Hall At Singbir, Cc Path And Waiting Shed At Pilgrimage Site At Sekar
Basic Detail
Tender No EE/MKA/RWD (SASCI)/NIT-01/2023-24
Bidding Type Tender
Location
City Shi Yomi
State Arunachal Pradesh
Key Dates
Publish Date 29 Feb 2024
Submission Date 06 Mar 2024
Open Date 07 Mar 2024
Finance
Tender Value 1.97 Crore
Tender Fee 8000
EMD 1.97 Lakhs
Exemption Not Available
Document List
3ddd96b1-c5a4-4f18-a3df-6619b035c353.html
BOQ_1860.xls
SBD.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 29, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 06, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 07, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

3ddd96b1-c5a4-4f18-a3df-6619b035c353.html

xls

BOQ_1860.xls

pdf

SBD.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender