|
| 1 | Design, Procurement, Fabrication, Testing, Launching, Certification & Trial Run at Supplier’s Yard of Steel Pontoon (size 30 m length x 8 m width), Floating shore connecting Walkway with HDPE Floater (9m x 2m x 0.80m height Handrail), Fenders, Winches, Bollards, Towing Post, Stays & Ladders, Mooring Rope, Anchor System, Crew cabin,Life Saving appliances (15 Nos. Lifebuoys and 60 Nos. Life jackets, Life Line Rope 30m, 2 nos First Aid Kit), 1 number of portable dry powder fire extinguishers of 9 liter capacity for all classes of fire, GI roofing, complete including painting, testing and certification by IRS/ IIT/ classification society all inrespect as per the terms & conditions of the tender at the below mentioned locations: |
| 2 | Berhampore Gopal Ghat |
| 3 | Berhampore Ghat Opposite (Khagra Ghat) |
| 4 | Lalbagh (Sadar Ghat) |
| 5 | Khosbagh Ghat (Lalbagh Court Ghat) |
| 6 | Majherchar |
| 7 | Saptorshi Ghat |
| 8 | Guptipara |
| 9 | Transportation, Launching, Installation, Anchoring, Testing & Commissioning at site (each location) of Steel Pontoons (size 30 m length x 8 m width), Floating shore connecting Walkway with HDPE Floater (9m x 2m x 0.80m height Handrail), Fenders, Winches, Bollards, Towing Post, Stays & Ladders, Mooring Rope, Anchor System, Crew cabin,Life Saving appliances (15 Nos. Lifebuoys and 60 Nos. Life jackets, Life Line Rope 30m, 2 nos First Aid Kit), 1 number of portable Dry powder fire extinguishers of 9 liter capacity for all classes of fire, GI roofing complete including painting, testing and certification by IRS/ IIT/ classification society all inrespect as per the terms & conditions of the tender at the below mentioned locations:Includes insurance and other services required to convey the Goods to the Final Destination (ITB 14.8 (a) (iii)) |
| 10 | Berhampore Gopal Ghat |
| 11 | Berhampore Ghat Opposite (Khagra Ghat) |
| 12 | Lalbagh (Sadar Ghat) |
| 13 | Khosbagh Ghat (Lalbagh Court Ghat) |
| 14 | Majherchar |
| 15 | Saptorshi Ghat |
| 16 | Guptipara |
| 17 | General Upkeep and Maintenance for smooth operation/utilization of complete offshoreunit consisting of Steel Pontoon & Floating shore connecting Walkway with HDPE Floater at the location for a period of 02 years as per the requirement of Section VII – Paragraph 15 |
| 18 | Berhampore Gopal Ghat |
| 19 | Berhampore Ghat Opposite (Khagra Ghat) |
| 20 | Lalbagh (Sadar Ghat) |
| 21 | Khosbagh Ghat (Lalbagh Court Ghat) |
| 22 | Majherchar |
| 23 | Saptorshi Ghat |
| 24 | Guptipara |