| 1 | Loading, Carriage and unloading of poles from store to work site or vice-versa. |
| 2 | Erection of Double pole structure by digging of pit by hydra. |
| 3 | Erection of Four pole structure by digging of pit by hydra. |
| 4 | Grouting of pole with cement brick ballast and coarse sand as per standard specification. |
| 5 | Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 6 | Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paintincluding cost of Ist Class enamel paint. |
| 7 | Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications. |
| 8 | Dismentalling of Damaged S.T. Pole of very Critical Position with the help of crane after remaving all the accessories from damged pole and its all related wotk including digging of pit or by cutting with gas cutter. |
| 9 | Fabrication/modification of MS Item as per requirement of site. |
| 10 | Fixing of MS Channel (100x50x6) mm 2.4 / 2.8/ 0.35 mtr. Long/T-off channel. |
| 11 | Making 33 KV/11 KV Straight Through joint including digging of pit upto 1.1 Mtr. Depth. |
| 12 | Taking out 33kv and 11 kV 3x70 to 3x300 XLPE Cable/LT Cable except service cable from cable drum before laying and transportation of the cables from store to work site or vice-versa. |
| 13 | Laying ofXLPE cables of all sizes except service cables in above digged trench covering with bricks and back filling or in RCC/RBC trench constructed by PWD/UPBCL as per standard specification and upto Pole. (RoW/ Road cutting permission charges/land use charges/ Road restoration charges shall be bear by contractor) |
| 14 | Making indoor/outdoor joints of 33KV/11KV 3x300 sqmm. Cable where the cable is being laid. Jointing Kit will be provided by the Department. |
| 15 | Mounting of cable box on pole, cable support structure with handling of concerning cable and proper fixing (With G.I. pipe of 3 metre). |
| 16 | Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 17 | Making of H.T. Jumpers from 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 18 | Mounting of 33 kV Pin Insulator |
| 19 | Erection of 11 kV Disc Fitting with disc string |
| 20 | Supply and Fixing concrete Stone Route marker of 300 mm width x 150 mm thick x 650 mm height embedded in earth at least 300 mm below and 350 mm above ground level at every 100 m along the length of the cable with RCC concreting as per standard specification. |
| 21 | Dismantling of M.S. Channel/X-arm/Guarding angle |
| 22 | Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
| 23 | Dismentalling of binding wire from insulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixedconductor & rolling into bundles. |
| 24 | Loading, Carriage and unloading of ACSR Dog/Panther Conductor from store to work site or vice-versa. |
| 25 | Laying, Stringing & Tensioning of ACSR Dog Conductor for making jumpers on riser. |
| 26 | Erection of Bracing set |
| 27 | Making H.T. Section points by brackets, clamps & insulator, Tightening of Line, binding of conductor & proper connection. |
| 28 | Dismentalling of jumpering from cable box to line, cable support switchgear panels. |
| 29 | Connecting of newly erected network with KESCo mains including testing, commissioning and energization of the same completely. |
| 30 | Carriage of all concerning stock materialfrom KESCo Store to site or vice-versa. |