| 1 | CENTRALIZED MATERIALS |
| 2 | STP Pole 11 mtrs long |
| 3 | X-Arm M.S. Angle(65*65*6)mm V-Type 11KV |
| 4 | M.S.Channel (125*65*1300)mm T-Off |
| 5 | ACSR Weseal Conductor |
| 6 | 11KV Disc Insulator with fitting |
| 7 | 11KV Pin Insulator with Pin |
| 8 | Stay Complet ( Stay rod 16*1800mm, Stay wire 5 kg, Stay clamp, bolt & nut with grouting) |
| 9 | Earthing Complete |
| 10 | Top Channel |
| 11 | Cross Brasing Angle |
| 12 | G.I. Wire 6SWG |
| 13 | GAURDING ANGLE |
| 14 | DE-CENTRALIZED MATERIALS |
| 15 | X-Arm holding clamp,T-Off,Top,Dropper with nut & bolt |
| 16 | Danger Board with nut &bolt |
| 17 | F-Bracket with nut &bolt |
| 18 | Barbed wire |
| 19 | PG Clamp |
| 20 | Various type nut &bolts |
| 21 | Alluminium Paint |
| 22 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 23 | Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 24 | Erection of Sectional Four Pole Structure of ST pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works. |
| 25 | Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works with by jumpering with E bracket & Pin Insulator. |
| 26 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 27 | Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 28 | Earthing of Poles |
| 29 | Erection of Garding with garding Angel & GI wire |
| 30 | Painting Pole with Alluminium Paint |
| 31 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of weasel Conductor, binding with insulators & jumpering. |
| 32 | Erection of Cross Bracing Angle |
| 33 | Installation of Danger Board with clamp nut & bolt |
| 34 | Installation of Barbed Wire arround pole. |
| 35 | Installation of PG Clamp on double pole & four pole structure. |
| 36 | Tree Cutting |