Ministry Of Road Transport And Highways has published Tender For Consultancy Services For The Preparation Of Feasibility Studies And Detailed Project Report For The Work Of Rehabilitation & Upgradation Of 2/4 Lane Paved Shoulder Of Buldhana- Khamgaon Road Section Of Nh 753E Including Flyover In Botha Fores. Submission Date for this Tender is 26-03-2024. Consultancy Service Tenders in Buldhana Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Key Personnel |
2 | Team Leader cum Senior Highway Engineer |
3 | Senior Bridge Engineer |
4 | Highway cum Pavement Engineer |
5 | Material-cum-Geotechnical Engineer- Geologist |
6 | Senior Survey Engineer |
7 | Traffic and Safety Expert |
8 | Environmental Specialist |
9 | Quantity Surveyor/ Documentation Expert |
10 | Land Acquisition Expert |
11 | Utility Expert |
12 | B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) |
13 | To be filled by Consultant |
14 | To be filled by Consultant |
15 | To be filled by Consultant |
16 | To be filled by Consultant |
17 | Support Staff |
18 | Office Manager |
19 | Typist |
20 | Office Boy |
21 | Night Watchman |
22 | The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For Consultant: Mahindra Bolero or Equivalent (Not more than 2 years old) |
23 | Innova or Equivalent (Not more than 2 years old) (Fixed Costs) |
24 | Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc. |
25 | VI. Office Supplies, Utilities and Communication ( Fixed Costs ) |
26 | Office Supplies Drafting |
27 | Supplies computer |
28 | Running Costs |
29 | Domestic and International Communication |
30 | Office Furniture and Equipment ( Rental ) |
31 | Office Furniture and Equipment |
32 | VIII.Reports and Document Printing |
33 | Monthly Report (3 per month) |
34 | Inception Report & QAP |
35 | Environment and Social Impact Screening Report |
36 | Draft Feasibility Report |
37 | Final Feasibility Report |
38 | Strip Plan with L.A. Reports |
39 | Draft LA and Clearances I Report |
40 | Final LA and Clearances I Report |
41 | Draft Environmental Assessment report & RAP |
42 | Final Environmental Assessment report & RAP |
43 | Draft Detailed Design Report & Drawings etc. |
44 | Draft EMP |
45 | Draft Bidding Documents |
46 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc |
47 | Final EMP |
48 | Final Bidding Documents |
49 | Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each) |
50 | LA & Clearances II Report |
51 | IX Survey and Investigation |
52 | Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer. |
53 | Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology |
54 | B. Investigation (Fixed cost) |
55 | Road and Bridge Inventory |
56 | FWD Test and Pavement Evaluation |
57 | Roughness Survey |
58 | Axle Load Survey |
59 | Material Survey and Investigation |
60 | Sub-grade Investigation |
61 | Traffic Survey |
62 | Socio-economic & Census Survey/ Studies |
63 | Land Acquisition Studies |
64 | Any other investigations/surveys |
65 | C. NET WORK SURVEY AND GPR |
66 | Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority |
67 | GPR Survey for detection of under ground utilities |
68 | Cost of supply and fixing boundary pillars |
69 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
70 | Land acquisition Team including support staff and logistics/transportation |
71 | Ex-Land revenue inspector/officer or equivalent |
72 | EX-kanoogo/Girdwar or equivalent |
73 | Ex-Patwari or equivalent |
74 | typist |
75 | peon |
76 | Estimate of Costfor Expatriate Consultants (INR) Remuneration of Exptriate staff including per diem allowances |
77 | Staff 1 |
78 | Staff 2 |
79 | Staff 3 |
80 | Staff 4 |
81 | Staff 5 |
82 | Staff 6 |
83 | International Airfares (Fixed Cost) Mobilization andDemobilization |
84 | Position 1 |
85 | Position 2 |
86 | Position 3 |
87 | Position 4 |
88 | Inland Travel in Home Country (Fixed Costs) |
89 | Airlines |
90 | Other Miscellaneous expenses (like DA, internal travel expenses other incidentals) |
91 | Income Tax (Expariate)( as per prevaling Norms) |
92 | Other Taxes / Duties (if any) Specify clearly |
93 | Goods & Service Tax( as per prevaling Norms) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy