Providing Pole In Long / Mid Span, Restructure Of Old Damage Double Pole And Resagging Of Loose Sapan On Lt/Ht Line Under Jailcamp Section Under Edd Sitarganj (Turnkey Basis) Under The Head Capital (S.I.).
Tender Overview
Project Description
Providing Pole In Long / Mid Span, Restructure Of Old Damage Double Pole And Resagging Of Loose Sapan On Lt / Ht Line Under Jailcamp Section Under Edd Sitarganj ( Turnkey Basis ) Under The Head Capital ( S.I. ) .
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 08-Mar-2024 | Date Extention | Date | 11-Mar-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Annexure-A (Supply of Following Material) |
| 2 | PCc Pole 8.5M |
| 3 | 9 MRT. Long STP 410 SP-33 (BPHD GAL) |
| 4 | MS Angle 65x65x6mm |
| 5 | MS Cahnnel 100x50mm |
| 6 | Holding Clamp for for PCC Pole with N&B |
| 7 | 11 KV Poylmer disc insulator B&S type |
| 8 | 11 KV Poylmer disc insulator with pin |
| 9 | Disc. Fit. B&S type Dog / Racoon 70 KN. |
| 10 | Disc. Fit. B&S type weasel / Rabbit 45 KN. |
| 11 | X Arm angle 65x65x6mm V type 11 KV |
| 12 | Earthing Rod MS 20x2500mm |
| 13 | GI wire 5mm/ 6 SWG. |
| 14 | MS Bolt with washer and nut |
| 15 | Stay Set GI 16x1800mm. |
| 16 | Stay wire GI 7/3.15 mm 7/10 SWG. |
| 17 | ACSR Weasel |
| 18 | F Clamp |
| 19 | LT Clamp for PCC pole with Nut & Bolt |
| 20 | Stay Clamp for PCC Pole with nut & bolt. |
| 21 | X arm holding clamp 150 no. |
| 22 | Suspension clamp for LT XLPE Cable |
| 23 | Stay Insulator |
| 24 | Shacle Insulator 75x90mm without nut & bolt. |
| 25 | Suspension clamp for PCC pole with nut & bolt |
| 26 | Annexure-B (Work Portion) |
| 27 | Erection of earthing rod. |
| 28 | Erection of LT Stay set. |
| 29 | Erectin of 11 KV Stay set. |
| 30 | Erectin of single PCC pole |
| 31 | Erection of SP 33 double pole |
| 32 | Dismentalling of PCC double pole |
| 33 | Dismentalling of 25 KVA DTR |
| 34 | Dismentalling of 63 KVA DTR |
| 35 | Installation of 63 KVA DTR on pole stucture. |
| 36 | Installation of 25 KVA DTR on pole stucture. |
| 37 | Looping & choping tree branches |
| 38 | Cartage of PCC pole 51 to 70 Km. |
| 39 | Cartage SP 33 Pole 51 to 70 Km. |
| 40 | Cartage of Patty material 51 to 70 Km. |
| 41 | Head Load Cartage PCC pole 0 to 01 km. |
| 42 | Head Load Cartage SP33 pole 0 to 01 km. |
| 43 | Fixing of accessories |
| 44 | Re sagging of Loose LT line |
| 45 | Re alligement of tilted pole |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender