Tender For Repair/Replacement Of Water Supply Lines, Control Valves, Lt Panels, Repair To Pump Sets, Dg Sets And Chlorine System, Cleaning Of Oh Tank Including Testing Of Water Samples At Pallanwala Under Ge (South) Akhnoor (Second Call)., Jammu-Jammu And Kashmir

Military Engineer Services-MES has published Tender For Repair/Replacement Of Water Supply Lines, Control Valves, Lt Panels, Repair To Pump Sets, Dg Sets And Chlorine System, Cleaning Of Oh Tank Including Testing Of Water Samples At Pallanwala Under Ge (South) Akhnoor (Second Call).. Submission Date for this Tender is 16-03-2024. Diesel Generators Tenders in Jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

42479981
Corrigendum : Tender For Repair/Replacement Of Water Supply Lines, Control Valves, Lt Panels, Repair To Pump Sets, Dg Sets And Chlorine System, Cleaning Of Oh Tank Including Testing Of Water Samples At Pallanwala Under Ge (South) Akhnoor (Second Call).
Open Tender
Indian
Jammu And Kashmir
Jammu
16-03-2024

Tender Details

Repair / Replacement Of Water Supply Lines, Control Valves, Lt Panels, Repair To Pump Sets, Dg Sets And Chlorine System, Cleaning Of Oh Tank Including Testing Of Water Samples At Pallanwala Under Ge ( South ) Akhnoor ( Second Call ) .

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 09-Mar-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 16-03-2024

Key Value

Document Fees
INR 500 /-
EMD
INR 26000.0 /-
Tender Value
INR 13 Lakhs /-

BOQ Items

Name of Work: REPAIR/REPLACEMENT OF WATER SUPPLY LINES, CONTROL VALVES, LT PANELS, REPAIR TO PUMP SETS, DG SETS AND CHLORINE SYSTEM, CLEANING OF OH TANK INCLUDING TESTING OF WATER SAMPLES AT PALLANWALA UNDER GE (SOUTH) AKHNOOR. (SECOND CALL)
Sl. No. Item Description
1Excavation in trenches, not exceeding 1.50 mtr wide and not exceeding 1.50mtr in depth; not exceeding 10 Sqm on plan and not exceeding 1.50 mtr in depth and getting out, in any type of soil, for laying pipe line etc, complete all as specified and as directed by Engineer-In-Charge. Note :-The quoted rate shall be deemed to have included necessary "trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete complete including necessary all tools, tackles etc.
2Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25Cm, complete all as specified and directed by Engineer-In-Charge.
3Removing excavated materials/ soils, not exceeding 50mtrs and depositing where directed at a level not exceeding 1.50mtrs, complete all as specified and directed by Engineer-In-Charge.
4Disconnecting and liftingthe existing non functional submersible pump set with dismantling existing bend from non return valve, removing and lifting out submersible pump sets of any description and capacity and in any position alongwith existing column pipe of 80mm dia and submersible cable of any size from borewell of 150/200mm (approx 30mtr depth of pumpset from GL).
5Lowering down, commissioning back to tube well of submersible pump sets with lowering pipe, flange or any type and any size of any depth with pump set of any capacities by manual or mechanical means including making necessary electric connections with LT panel or starter and testing on full load after repairs, complete all as specified and directed by Engineer-In-Charge. Note: (i) Cost of tools and plants for taking out, minor spare parts such as nuts, bolt, washers, lubricants shall be deemed included in quoted rate.
6Dismantling and strip opening of submersible pump and motor of any description and in any position, transporting to workshop for servicing, overhauling, cleaning,greasing,removing andreassembling the pump and motor with proper alignment of both pump and motor, fixing in position connecting to existing system and testing at site on full load to the entire satisfaction of the Engr-in-charge for thesubmersible pump 10 HP, 3 phase, 415volts,50Hz AC Supply. Note : (I) The replacement of defective non functional parts shall be measured and paid for separately under respective item of sch A. (ii) The rate of above item shallbe deemed to include transportation cost of pump/motor to workshop and return to work site as approved by Engr-in-charge for necessary repair, alignment and testing of pump and motor at workshop. (iii) Any damage to pump during trasportation from work shop to site of wrok due to any mean like jerks,shocks etc caused due to mis-handling shall be contractor"s responsibilityand no extra for re-repair to above specification shall be admissible from the Deptt. (iv) Cost of tools and plants for taking out, minor spare parts such as nuts, bolt, washers, lubricants shall be deemed included in quoted rate.
7Supply only following parts of submersible motor of any description of capacity 10 HP all as specified and as directed by Engr-in-charge. (a) Gun metal bush
8(b) Rubber bush
9(c) Brass thrust plate
10(d) CI thrust bearing
11(e) CI thrust casing
12(f)Water seal
13(g) CI lower/upper housing of shaft
14(j)Rotor sleeve
15Supply and fixing in replacement of the following parts of submersible pump of any description 10 HP capacity complete all as specified and as directed. (a) Coupling set with key of stainless steel
16(b) Discharge outlet CI
17(c) Stage casing CI
18(d) Gun metal sand guard
19(e) Gun metal neck ring
20(f) Gun metal impeller
21Repair to impeller of submersible pump of any description by breazing, welding, metalling, turning and polishing ofcapacity 10 HP all as specified and as directed.
22M&L for rewinding of submersible motor 10 HP with PVC insulated copper winding wire of existing size and approved make after taking down burnt winding, cleaning of slots with CTC solution, transportation at site, fixing in position and testing complete all as specified and as directed.
23M&L in replacement for GI Bend suitable for 80 mm bore column pipe heavy duty flanged and drilling at both the ends with having arrangement of mounting pressure gauge complete all as specified & as directed.
24Replacement for column pipe 80 mm bore heavy duty ISI marked conforming to IS-1239 and having length ofcolumn pipe 3.0 metreboth end flanged , complete all as directed by Engr-in Charge . Make- Tata/Jindal/Swastik
25Repalcement of rusted/unserviceable nut,bolts & washers of column pipes of submersible motor of any size/capacity, complete all as directed by Engr-in Charge
26M&L in repalcement of rusted/unserviceable MS clamp of suitable size withnut,bolts & washers complete for hanging of submersible pump set with column pipes in bore well any size/cap all as directed by Engr-in Chrge
27M&L in repalcement of rusted/unserviceable MS cap of suitable size as casing cover of bore well all as specified and directed by Engr-in-Charge
28Replacement of old unserviceable/ damaged battery with new storage cell lead acid type 12 Volts, 150 AH including lead terminals and copper thimble for making necessary connections, complete all as specified and as directed by Engineer-In-Charge. Make - Exide/ Luminous/ Amaron.
29Carryout periodical maintenance of DG set capacity 40 KVAMake : "Greaves" by calibration of fuel injection pump including dismantling of radiator, radiator fan, water pump assembly, air cleaner, rocker cover housing rocker, oiling and greasing to movable spare parts such as bearing etc, replacement of old defective air filter, fuel filter, oil filter, insulation cover/ asbestos rope of exhaust pipe with new and manufacturer specified air filter, fuel filter and oil filter, insulation cover/ asbestos rope of exhaust pipe tightening the screws of hose and hose pipe set, strip opening of alternator cleaning of stator and field coils, rotor assembly, and apply one coat of varnishing using ‘H’ class varnish and complete service work as required at site, re-assembling the engine/ alternator in existing position, and testing on completion installed at Pump House Pallanwala completeall as directed by Engineer-In-Charge. Note: New spare parts will be measured and paid separately as supply only under the respective items.
30Supply only following new spare parts required for repair of DG Set capacity 40 KVA :- (a) Piston with piston pin, connecting rod and lock assembly complete.
31(b) Cylinder liner with liner ring assembly complete.
32(c) Piston ring set.
33(d) Main Bearing.
34(e) Connecting rod bearing of 6-pairs.
35(f) Small end bearing
36(g) Major overhauling gasket set with "O" ring set.
37(h) Head valve inlet and exhaust.
38(j) Main Oil seal (Front and Rear).
39(k) Hose pipe with clips and joint set.
40(l) Fuel Filter.
41(m) Oil Filter.
42(n) Air cleaner filter
43(o) V-Belts
44(p) 4 nos high pressure copper tubes of required size from FIP to injectors
45Repair to Cam Shaft assembly of diesel engine capacity suitable for 40 KVA DG set, by metal filling, cutting, grinding, polishing as required size including required material, tools and plant, complete all as specified and as directed by Engineer-In-Charge.
46Repair to Crank Shaft assembly of diesel engine capacity suitable for 40 KVA DG set, by metal filling, cutting, grinding, polishing as required size including required material, tools and plant, complete all as specified and as directed by Engineer-In-Charge.
47Replacement of old damaged/ unserviceable Enginetemperature gauge with new Engine temperature gauge suitable for DG set of capacity 40 KVA, complete all as specified and as directed by Engineer-In-Charge.
48Calibration, repair, checking of fuel injector nozzle assembly of DG set capacity 40 KVA, transport to workshop including replacement of injector nozzle cap, barrel and small spares required for smooth functioning of injector nozzle, complete all as specified and as directed by Engineer-In-Charge.
49Supply only copper lead cable 2 mtrs long, multi-stranded, with copper thimble for making necessary connections at both ends, suitable for 12 Volts including copper nuts, bolts and washers, complete all as specified and as directed by Engineer-In-Charge.
50Repair, calibration, checking and pressure testing of fuel injector pump assembly of DG set capacity 40 KVA including replacement of damaged/ defective parts, cups, barrel plunger and washers including transportation for workshop for repair and return to work site and re-fixing as directed, testing whole assembly after necessary repair and fixing in engine, calibrating in MICO test bench as per manufaturer specification all as directed for 40 KVA DG Set, complete all as specified and as directed by Engineer-In-Charge. Note: (a) Cost of cleaning, welding, spare parts major and minor repair and special tools and plants required for dismantling and refixing with engine will also deemed to be included in quoted rate.
51Disconnecting electric connections from alternator, capacity 40 KVA, decoupling of engine and alternator, separaing from base plate, and transporting to workshop for repairs and return back to it"s original position after repairs including loading and unloading, by mechenical means, replacing defective spare parts with new spare parts, including any type of machine work required at site/ workshop to compete the repair including complete servicing all as required at site, re-assembling in existing position complete and testing on completion all as specified and as directed by Engineer-In-Charge Note: (a) Cost of cleaning, welding, all spare parts as required, and special tools and plants required for dismantling of alternator will deemed to be included in quoted rates.
52Replacement of old damaged/ unserviceable carbon bush with new carbon bush suitable for alternator of DG set capacity 40 KVA, complete all as specified and as directed by Engineer-In-Charge.
53Replacement of old damaged/ unserviceable carbon bush holder with new carbon bush holder suitable for alternator of DG set capacity 40 KVA, complete all as specified and as directed by Engineer-In-Charge.
54Replacement of old damaged/ unserviceable electronic rectifier/ Automatic Voltage Rectifier with new electronic rectifier/ Automatic Voltage Rectifier suitable for DG set capacity 40 KVA, complete all as specified and as directed by Engineer-In-Charge.
55Replacement of old damaged/ unserviceable slip ring assembly with new slip ring assembly suitable for DG set capacity 40 KVA, complete all as specified and as directed by Engineer-In-Charge.
56Replacement of old damaged/ unserviceable solenoid switch with new solenoid switch suitable for self starter capacity 12 Volts, complete all as specified and as directed by Engineer-In-Charge.
57Carryout periodic maintenance of DG set capacity 25 KVAMake : "Greaves" by calibration of fuel injection pump including dismantling of radiator, radiator fan, water pump assembly, air cleaner, rocker cover housing rocker, oiling and greasing to movable spare parts such as bearing etc, replacement of old defective air filter, fuel filter, oil filter, insulation cover/ asbestos rope of exhaust pipe with new and manufacturer specified air filter, fuel filter and oil filter, insulation cover/ asbestos rope of exhaust pipe tightening the screws of hose and hose pipe set, strip opening of alternator cleaning of stator and field coils, rotor assembly, and apply one coat of varnishing using ‘H’ class varnish and complete service work as required at site, re-assembling the engine/ alternator in existing position, and testing on completion installed at Pump House Kachiryal completeall as directed by Engineer-In-Charge. Note: New spare parts will be measured and paid separately as supply only under the respective items.
58Supply only following new spare parts required for repair of DG Set capacity 25 KVA :- (a) Piston with piston pin, connecting rod and lock assembly complete.
59(b) Cylinder liner with liner ring assembly complete.
60(c) Piston ring set.
61(d) Main Bearing.
62(e) Connecting rod bearing of 6-pairs.
63(f) Small end bearing
64(g) Major overhauling gasket set with "O" ring set.
65(h) Head valve inlet and exhaust.
66(j) Main Oil seal (Front and Rear).
67(k) Hose pipe with clips and joint set.
68(l) Fuel Filter.
69(m) Oil Filter.
70(n) Air cleaner filter
71(o) V-Belts
72(p) 4 nos high pressure copper tubes of required size from FIP to injectors
73Calibration, repair, checking of fuel injector nozzle assembly of DG set capacity 25 KVA, transport to workshop including replacement of injector nozzle cap, barrel and small spares required for smooth functioning of injector nozzle, complete all as specified and as directed by Engineer-In-Charge.
74De-assembling of radiator for cleaning and repair, using ‘K’ oil and radiator cleaning solution hydro-chloric acid by pressure of pump/ caustic soda with wire brush and necessary welding/ brazing of water tubes/ fins, whichever is required for cleaning and repairing for 25 KVA DG Set, complete all as specified and as directed by Engineer-In-Charge.
75Repair, calibration, checking and pressure testing of fuel injector pump assembly of DG set capacity 25 KVA including replacement of damaged/ defective parts, cups, barrel plunger and washers including transportation for workshop for repair and return to work site and re-fixing as directed, testing whole assembly after necessary repair and fixing in engine, calibrating in MICO test bench as per manufaturer specification all as directed for 25 KVA DG Set, complete all as specified and as directed by Engineer-In-Charge. Note: (a) Cost of cleaning, welding, spare parts major and minor repair and special tools and plants required for dismantling and refixing with engine will also deemed to be included in quoted rate.
76Supply only engine oil/ lubricant, 20 W 40 grade, suitable for diesel engine of DG set of any capacity and any make, complete all as specified and as directed by Engineer-In-Charge.
77Supply only coolant fluid suitable for radiator of DG sets of any capacity and any make, complete all as specified and as directed by Engineer-In-Charge.
78Supply and fixing in replacement of self starter assembly 12 volt suitable for 40KVA DG set, complete all as specified and as directed by Engineer-In-Charge.
79Disconnecting electric connections from alternator, capacity 25 KVA, decoupling of engine and alternator, separaing from base plate, and transporting to workshop for repairs and return back to it"s original position after repairs including loading and unloading, by mechenical means, replacing defective spare parts with new spare parts, including any type of machine work required at site/ workshop to compete the repair including complete servicing all as required at site, re-assembling in existing position complete and testing on completion all as specified and as directed by Engineer-In-Charge Note: (a) Cost of cleaning, welding, all spare parts as required, and special tools and plants required for dismantling of alternator will deemed to be included in quoted rates.
80Replacement of old damaged/ unserviceable carbon bush with new carbon bush suitable for alternator of DG set capacity 25 KVA, complete all as specified and as directed by Engineer-In-Charge.
81Replacement of old damaged/ unserviceable carbon bush holder with new carbon bush holder suitable for alternator of DG set capacity 25 KVA, complete all as specified and as directed by Engineer-In-Charge.
82Replacement of old damaged/ unserviceable electronic rectifier/ Automatic Voltage Rectifier with new electronic rectifier/ Automatic Voltage Rectifier suitable for DG set capacity 25 KVA, complete all as specified and as directed by Engineer-In-Charge.
83Replacement of old damaged/ unserviceable slip ring assembly with new slip ring assembly suitable for DG set capacity 25 KVA, complete all as specified and as directed by Engineer-In-Charge.
84Replacement of old damaged/ unserviceable solenoid switch with new solenoid switch suitable for self starter capacity 12 Volts, complete all as specified and as directed by Engineer-In-Charge.
85Replacement of old damaged/ unserviceable submersible cable with new submersible cable, flat, PVC insulated and PVC sheathed copper conductor, multi-stranded, 25.0 Sqmm, 3-core, conforming to IS: 694/1990 including making connection to both ends i.e. motor side and starter side with jointing materials, complete all as specified and directed by Engineer-In-Charge.
86Replacement of old damaged/ unserviceable submersible cable with new submersible cable, flat, PVC insulated and PVC sheathed copper conductor, multi-stranded, 16.0 Sqmm, 3-core, conforming to IS: 694/1990 including making connection to both ends i.e. motor side and starter side with jointing materials, complete all as specified and directed by Engineer-In-Charge.
87Cleaning of overhead water tank, capacity 50,000 Gallons, height/ staging 18.85mtrs, by scraping with mild steel wire brush and removing all the silt, dirt, algae, sludge etc from the surfaces of walls and floor including removal the same to a distance not less than 50mtrs, washing the cleaned surface with bleaching powder solution thoroughly and applying two coats of lime wash on internal surfaces of reservoir, also applying two coats of cement paint of external surfaces of tank with staging after preparation of surfaces, and writing the particulars such as capacity of tank, date/ due date of tank cleaning in bold letters, on table size not less than 60cmx40cm, painted with black and white synthetic enamel paint on external surface, including painting with one coat black synthetic enamel paint to external surfaces of flow pipes with valves any type as connected with overhead water tank and making flow signs with white synthetic enamel paint, complete all as specified and directed by Engineer-In-Charge. Note :- Necessaryscaffolding and staging work, ladders etc alongwith Saftey Harness and other tools and plants required to complete the entire job shall be deemed to be included in the quoted rates of the item and nothing extra shall be paid extra on this account.
88Cleaning of UG Sump, 50000 Gln capacity by disconnecting all electric connections from LT panel, starter, removing pipe line from discharge side, taking out submersible/ centrifugal pump with motor along with column pipe by mechanical or manual method, scraping all mud, algae, silt, sludge and other dirts by mild steel wire brush floor including removal the same to a distance not less than 50mtrs and re-assembling/ lowering down submersible/ centrifugal pump with motor, column pipe and making all electric and water supply connection to the existing lines/ system, also applying two coats of cement paint of external surfaces of tank with staging after preparation of surfaces, including writing the particulars such as capacity of tank, date/ due date of tank cleaning in existing letter sizes, on table size not less than 60cmx40cm, painted with black and white synthetic enamel paint on external surface, complete all as specified and as directed by Engineer-In-Charge. Note :- Necessaryscaffolding and staging work, ladders etc alongwith Saftey Harness and other tools and plants required to complete the entire job shall be deemed to be included in the quoted rates of the item and nothing extra shall be paid extra on this account.
89Replacement old un-serviceable Sluice Valve with new Sluice Valve, cast iron, Class PN 1.6, size 80mm bore pipe, flanged type, conforming to IS: 14846-2000, ISI marked with stainless steel spindle, brass nuts and iron wheel head including jointing material such as rubber fibre board packing ring and nuts, bolts and washers of suitable size for vertical or horizintal fittings, complete all as specified and as directed by Engineer-In-Charge.
90Replacement old un-serviceable Sluice Valve with new Sluice Valve, cast iron, Class PN 1.6, size 100mm bore pipe, flanged type, conforming to IS: 14846-2000, ISI marked with stainless steel spindle, brass nuts and iron wheel head including jointing material such as rubber fibre board packing ring and nuts, bolts and washers of suitable size for vertical or horizintal fittings, complete all as specified and as directed by Engineer-In-Charge.
91Replacement old un-serviceable Sluice Valve with new Sluice Valve, cast iron, Class PN 1.6, size 150mm bore pipe, flanged type, conforming to IS: 14846-2000, ISI marked with stainless steel spindle, brass nuts and iron wheel head including jointing material such as rubber fibre board packing ring and nuts, bolts and washers of suitable size for vertical or horizintal fittings, complete all as specified and as directed by Engineer-In-Charge.
92Replacement old un-serviceable gate valve with new gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed for 50mm bore pipe line, complete all as specified and as directed by Engineer-In-Charge.
93Supplying, laying in replacementof and jointing,testing, commissioning Tubes, "medium grade" galvanised, 15mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches, complete all as specified and as directed by Engineer-In-Charge.
94Supplying, laying in replacementof and jointing,testing, commissioning Tubes, "medium grade" galvanised, 20mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches, complete all as specified and as directed by Engineer-In-Charge.
95Supplying, laying in replacementof and jointing,testing, commissioning Tubes, "medium grade" galvanised, 25mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches, complete all as specified and as directed by Engineer-In-Charge.
96Supplying, laying in replacementof and jointing,testing, commissioning Tubes, "medium grade" galvanised, 40mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches, complete all as specified and as directed by Engineer-In-Charge.
97Supplying, laying in replacementof and jointing,testing, commissioning Tubes, "medium grade" galvanised, 50mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches, complete all as specified and as directed by Engineer-In-Charge.
98Supplying, laying in replacementof and jointing,testing, commissioning Tubes, "medium grade" galvanised, 80mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches, complete all as specified and as directed by Engineer-In-Charge.
99Supplying, laying in replacementof and jointing,testing, commissioning Tubes, "medium grade" galvanised, 100mm bore, ISI marked including all fitting such as bends, tees, elbows, unions, short pieces, connectors, back nuts, etc, laid in trenches, complete all as specified and as directed by Engineer-In-Charge.
100S&F in replacement of a submersible pumpof cap to draw the water 20000 glns proppel through submersible motor of cap 7.5 HP deliver at a head of 110/125 meter with 10/12 staging .
101S&F in replacement of a submersible motor of cap 10 HP to draw the water 30000 glns couple with a pump 10/12 staging deliver at a head of 110/125 meter with 10/12 staging .
102Supply and distributeCalcium hypochlorite 65%-70% Chlorine content calcium based granular disinfectant for water treatement to Pump House at AKHNOOR and outer station. (Product shall be as per Generic BIS specification as decided by Procurement Agency/ Accepting Officer.) NOTES:- (i) Approval of chemical (Calcium hypochlorite) shall be given after verification of test certificates of chemical of various manufactures and other factors like chemical and safety and health hazard aspects of usage of chlorination (ii) The brand/make of the chlorination of chemical must be stated before procurement and certified by govt laboratory that it is free from the technical strength stahbility health safety and operation point of view this product is used for drinking water applications for consumption by humans and the brand /make of calcium hypochlorite is suitable for drinking water chlorination and its sample has been tested by Govt Laboratory. (iii) The sample bucket/drum shall be produced by contractor for approval of Accepting Officer and the chemical contained in Bucket/Drum shall be got tested independenly by the Contrcator before Bulk supply from IIT College/NIT College/Govt Engneering college/ or any other NABL lab valid for such tests of water disinfactant, After verification of indepedent tests so carried out shall be compared at par of required BIS generic specification. (iv) The cost of sapmle bucket/drum for testing purpose and transporation to Lab as cited lab shall be borne by the Contractor and nothing shall be admissible on this account.
103Disconnecting to all electric connections from LT panel and motor for repair of motor starter of 05-10 HP, star-delta starter, automatic unmanned type suitable for centrifugal/ submersible pumps, transportation to workshop and re-installation the same at site after necessary repair/ replacement of old defective/ damaged spare parts such as contactors, relays, of existing makes and specifications, complete all as specified and directed by Engineer-In-Charge. Note: (i) Cost of new spare parts will be measured and paid separately under respective items. (ii) Cost of tools and plants, minor spare parts such as copper wire, lubricants and transportation to workshop shall be deemed included in quoted rate.
104Supply only following new spare parts required for replacement for repair of motor starter capacities 5 HP to 10 HP, star-delta starter, automatic type suitable for submersible pumps :-(a) Contactor, triple pole, capacities 10 amps to 15 amps.
105(b) Globe indicator set (RYB)
106(c) Overload relay
107(c) Overload relay
108(d) Single phase protection relay.
109(e) Toggle button having on/ off position
110(f) Digital voltmeter, range 0-500 Volts, size 96mmx96mm, suitable for LT panels
111(g) Digital ammeter, range 0-500 Amps, size 96mmx96mm, suitable for LT panels
112Collection of water from Pallanwala Pump House & Kachiryal Pump Houseto carry out the following water tests from Indian Institute of Integrative Medicine, Jammu or any other reputed / recognized Institute:- 1:- Heavy metals and Minerals parameters of water: (a) Iron as "Fe" (b) Manganese as "Mn" (c) Zinc as "Zn" 2:- Physical parameters of water: (a) Alkalinity (b) Calcium (c) Chloride (d) Magnesium (e) Oil and Greese (f) pH value (g) Total Suspended Solids (h) Total Hardness (j) Total Dissolved Solids (k) Turbidity Note : (i)The testing of water is required to be carried out from Govt approved Lab and intimate portability for drinking purpose for the troops and families in Akhnoor mil stn. (ii)Collection of water from tubewell in sterilized bottle obtained from Govt Lab jointly and submit the sample on same to Lab as directed by Engr-in-Charge. (iii)Collection of water reports and submitted to office after testing all as directed by Engr-in-Charge and Result sheet of above tests shall be submitted in Duplicate to the entire satsifaction of GE during submission of work done..
113SPECIAL NOTE FOR DG SETS AND VOLTAGE STABLIZER"S REPAIRS/PUMPS: The contractor will submit a copy of Memorandum of under standing from OEMs ( or authorized dealers) to the Engr-in-Charge for the respective E/M installations before start of repair work. The details of OEMs are as under:- (a)DG Set (i) Kirlosker Green/Cummins(ii) Crompton Greaves (iii)Sudhir (iv) Mahindra (b)Servo Voltage Stablizer (i)Vinitek(ii)Electric field (iii) V-Guard (c)Submersible and Centrifugal Pumps (i)Kirloskar(ii)KSB (iii) Jyoti
114Amount of Schedule of credit of for Rs 92,530.00 shall be deducted from quoted amount.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail