| 1 | Dismantling lime or plain cement concrete as direction fully satisfaction of engineer in charge. |
| 2 | Preparation of sub grade excluding cost of earth work as direction fully satisfaction of engineer in charge. |
| 3 | Excavation of foundationin in Mar, Rankar and kankar mixed soilsincluding lift up to 1.5 meter and lead upto 30 meter including filling, watering , ramming , of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directedby Engineer-in-charge upto a distance of 30 meter from the foundation trenches as direction fully satisfaction of engineer in charge. |
| 4 | Centring and shuttringfor CC works including all cost of material labour T&P complete required for propar completion of work as direction fully satisfaction of engineer in charge. |
| 5 | Laying of M-10(1:3:6)cement concrete withstone grit with Mechenical mixing & vibration,curingincluding all cost of material labour T&P etc complete the work as direction fully satisfaction of engineer in charge. |
| 6 | Laying of M-15(1:2:4)cement concrete withstone grit with Mechenical mixing & vibration,curingincluding all cost of material labour T&P etc complete the work as direction fully satisfaction of engineer in charge. |
| 7 | S/ Laying L.D.P.E. 200 micron thick polythine sheet below C.C.Liningas direction fully satisfaction of engineer in charge. |
| 8 | Filling bitumin sealing compound for every groove 14x27mm i/c all cost of labour, material and T&P etc. complete as direction fully satisfaction of engineer in charge. |
| 9 | Laying of C.C. M-20 (1:1.5:3)with all labour, material T&P etc completethe work as direction fully satisfaction of engineer in charge. |
| 10 | S/L khanda stone masonarywork in 1:4 C.M.I/C cost of all material labour & T&P etc per cum |
| 11 | Centring and shutteringfor R.C.C. work including all cost of material labour T&P complete required for propar completion of work as direction fully satisfaction of engineer in charge. |
| 12 | Laying of R.C.C. M-20 (1:1.5:3)with well graded stone grit with manual mixingall labour, material T&P etc completethe work as direction fully satisfaction of engineer in charge. |
| 13 | Cutting,bending,binding placing in position of steel Reinforcement with binding wire and costof steelwith all labour, Taxes, T&P etc. complete required for proper completion of work as direction fully satisfaction of engineer in charge. |
| 14 | Laying sand i/c all labour, material and T&P etc. complete as direction fully satisfaction of engineer in charge. |
| 15 | S/ Laying first class brick work in 1:4 cement morter i/c all labour T&P etc complete as direction fully satisfaction of engineer in charge. |
| 16 | S/ Laying12.5 mm thick 1:4 cement plaster onbrick worki/c all labour T&P etc complete as direction fully satisfaction of engineer in charge. |
| 17 | S/ Laying 12.5 mm thick 1:4cement plaster onkhanda masonary worki/c all labour T&P etc complete as direction fully satisfaction of engineer in charge. |
| 18 | S/ Laying1:3 cement pointing raised onstone masonary worki/c all labour T&P etc complete as direction fully satisfaction of engineer in charge. |
| 19 | S/Fixing of wheel guard stonesize 0.2x0.2x0.75m of C.C.M-20 I/C all labour T&P etc complete as direction fully satisfaction of engineer in charge. |
| 20 | Dry Stone boulder pitching 25-50 Kg weight stone boulder including all cost of material labour T&P etc as direction fully satisfaction of engineer in charge. |
| 21 | Laying and fixing with 1:3 Cement and coarse sand mortar of Hume pipe in proper complete as per direction of Engineer-in-charge. |
| 22 | Painting on pucca works surface Finishing walls with water proofing cement paint of approved make and qualityon new work with two coat to give an even shade. Including supply of all material labour T&P etc.required for proper completion of the work as as direction fully satisfaction of engineer in charge. |
| 23 | Supply and fixing of sign board including labour,materials and all T&P with cutting, welding where necessary for proper complition of work as direction fully satisfaction of engineer in charge. |
| 24 | Supplying and fixing of boundary piller i/c cost of all material labour t&p etc as direction fully satisfaction of engineer in charge. |
| 25 | Cutting heavy under growth and bushes up to 7.5 cm diameter including removal of roots with collection and removal as direction fully satisfaction of engineer in charge. |
| 26 | Earth work in Mar, Rankar and kankar mixed soils in embankment including lead up to 595 M and beyond and lift up to 1.5 M. including dressing making profile and manual compaction but excluding mechanical compaction as direction fully satisfaction of engineer in charge. |
| 27 | Earth work in Mar, Rankar and kankar mixed soils in digging including lead up to 30 M. and lift up to 1.5 M. including dressing making profile and manual compaction but excluding mechanical compaction as direction fully satisfaction of engineer in charge. |