Electrification/Construction/Extension Of H.T. & L.T. Line And Different Capacity Of 11/0.4 Kv S/S In Phc Imiliya Kodar/Stw Khanpur Kurthuwa Block Rehra/Stw Vill Firozpur Block Rehra/Vill Damanpurwa Ujjainikala/Mohammadpur Bajahra Gaura Tulsipur/Vill Sadw
Tender Overview
Project Description
Electrification / Construction / Extension Of H.T. & L.T. Line And Different Capacity Of 11 / 0.4 Kv S / S In Phc Imiliya Kodar / Stw Khanpur Kurthuwa Block Rehra / Stw Vill Firozpur Block Rehra / Vill Damanpurwa Ujjainikala / Mohammadpur Bajahra Gaura Tulsipur / Vill Sadwapur Mishraouliya / Drug Were House Tulsipur / Phc Bankata / Govt. Ayurvaidik Hospital, Bhagwanpur / Phc Mankaura Bhangwanpur / Vill Anita Pathak / Tulsipur Road / Vill And Post Rehra And Hdfc Bank Sadullanagar Under The Head Of Deposit Scheme-2023-24, Under The Giographical Area Of Edd Tulsipur.
BOQ
| Sl. No. | Item Description |
| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich/ Shrawasti to the work site/J.E dump Store (Distance up to 80 km) |
| 2 | ST Pole (11 mtr long) |
| 3 | PCC Poles (8.5 mtr long) |
| 4 | ACSR Weasel Conductor |
| 5 | Different size of AB Cable |
| 6 | Other line materials |
| 7 | 25 KVA T/F |
| 8 | 63 KVA T/F |
| 9 | 100 KVA T/F |
| 10 | Erection of single ST Poles (11 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site |
| 11 | Erection of single PCC Poles (8.5 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site |
| 12 | Erection of sectional double pole sectional PCC pole (8.5 mtr long PCC Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 13 | Earthing of pole. |
| 14 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 15 | Grouting of Poles with 1:4:8CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
| 16 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
| 17 | Laying, Stringing & Sagging of ABC Cable up to proper sag for the following size cable |
| 18 | 3X95+1X70+1x35 sq.mm. |
| 19 | 3X50+1X35+1X16 sq.mm |
| 20 | 1X25+1X16 sq.mm single phase |
| 21 | Construction of 11/0.4 KV S/S for different capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
| 22 | 25 KVA T/F |
| 23 | 63 KVA T/F |
| 24 | 100 KVA T/F |
| 25 | Decentralized Items:-Providing and fixing offollowing materials sanctioned Estimate/Package as per RESSPO U.P.P.C.L. drawing/ norms.(where is required). |
| 26 | MS Nut and bolts. |
| 27 | I-Hook |
| 28 | Top, T-off holding clamp |
| 29 | F-Bracket Nut and bolts |
| 30 | Dropper Angle |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender