Name of Work:Nagar Panchyat Garatuha me Gandhi nagar me rajendra bhundela to chandrasekhar ke makan se CC ka niraman karya.
Sl. No.
Item Description
1
Earth work in cutting or in Filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20\") in depth and earthwork in embankment to be in 20 cm(8\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5fts) lifts and 30 m. (100\") lead. The earth from cutting to be used in making filling or to be deposited as spoil banks within 30 metres (100 fts) distance as directed by Engineer-in-charge.
2
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401.
3
Cement concrete with 4 cm (1.5\")gauge approved stone ballast, approved coarse sand and cement in the proportion of 8 : 4 : I including supply of all materials, labour and T & P etc. required for proper completion of the work. SI No. 281
4
Providing & Laying CC in ratio 1:1.5: 3with cement, sand & 20mm grit in causeway surfaceI/C all cost of material, labour, T&P etc., as required for proper completion of work in causeway top surface.
5
Cleaning the Nala with slug including labour Transportation etc complete all work as per direction of Engineer in charge.
6
R.C.C work with cement approved coarse sand and 2 cm. (3/4\") gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour& T&P etc. required for proper completion of the work. Binding wire cost being included in the item. S.I. No-284 (for slab)
7
Mild steel or iron work in plain work such as reinforced concrete/brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks, and authorized over lapping shall be measured. Si no-504
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.