Ghaziabad Municipal Corporation has published Tender For Request For Proposal For Selection Of Master System Integrator (Msi) For Implementation Of Intelligent Traffic Management System (Itms) In Ghaziabad City. Submission Date for this Tender is 10-06-2024. Customised Software Development Tenders in Ghaziabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Mar-2024 | Date Externed | Date | 18-04-2024 |
2 | 18-Mar-2024 | Correction Corrigendum | Other | 18-04-2024 |
3 | 16-Apr-2024 | Date | Date | 18-05-2024 |
4 | 18-May-2024 | date extend | Date | 10-06-2024 |
FileName | File Description | File Size |
fb7dbd8e-8e35-4b69-9617-2ab1ed3c41c3.html | Tender Notice | 0 KB |
BOQ_1553415.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
V1.pdf | Tender Document | 0 KB |
V2.1.pdf | Tender Document | 0 KB |
V2.3.pdf | Tender Document | 0 KB |
V2.pdf | Tender Document | 0 KB |
V3.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | CCTV SurveillanceSolution at 41 Junctions (As per RFP Specification) |
2 | Camera Type1 (Box/Bullet Camera Wide Range) with IR illuminator |
3 | Camera Type2 (PTZ Camera)- At Junctions with IR illuminator - (PTZ location assuming higher side at 3 lane junction-30, later may be reduce or interchange as per actual input by user/ police) |
4 | PTZ Joystick Controller |
5 | 6 Mtr Pole with Cantilever for Fixed Box Camera with Foundation |
6 | Std Pole for PTZ Camera Mounting with Foundation |
7 | Industrial grade manageable 8 port poe Switch |
8 | Junction Box |
9 | 1 KVA online UPS with 30min Backup |
10 | Site Infra (Civil Work i.e Trenching, Cable Laying, Cat6 Cable, Power Cable, GI/HDPE Pipe, Fiber) |
11 | Electricity Meter(58-41= 17 surplus) |
12 | Extra Item If need in this work (Only for providing rate for the items, not including in this work) |
13 | ATCS(30 three Arm Junction & 11 four arm Junction) -with using existing Traffic lights/Poles (As per RFP Specification) |
14 | ATCS Controller |
15 | Vehicle Detection DENSITY |
16 | Countdown timer (EN Certified) - Used Existing (1 per arm)QTY134 |
17 | Galvanized Cantilever poles - Used Existing (1 per arm) QTY 134 |
18 | Galvanized Standard Poles - Used Existing (2 per arm)QTY 134 |
19 | Traffic Light Aspects -Red - Used Existing (3 per arm)QTY 402 |
20 | Traffic Light Aspects - Green-Straight Arrow - Used Existing (3 per arm) QTY 402 |
21 | Traffic Light Aspect - Green Left Arrow - Used Existing (3 per arm) QTY 402 |
22 | Traffic Light Aspects - Green Right Arrow - Used Existing (3 per arm)QTY 402 |
23 | Traffic Light Aspects? Amber -Used Existing (3 per arm) QTY 402 |
24 | Pedestrian lamp heads? Stop Man - Used Existing (2 per arm) QTY 268 |
25 | Pedestrian lamp heads? Walk Man - Used Existing (2 per arm)QTY 268 |
26 | Junction Box - Used Existing (Per Junction) QTY 41 |
27 | Power Cable for Traffic Lights lumsum - Used Existing (Per Junction) QTY 41 |
28 | 1 KVA online UPS with 30 min Backup for ATCS Junction - Used Existing (1 Per Junction) QTY 41 |
29 | Traffic Enforcement - ITMS Hardware |
30 | RLVD System per lane ( Camera & Application) |
31 | ANPR system per lane (Camera, Application with IR illuminator ) Standard in city assume 2 Lane at each arm |
32 | LPU |
33 | Speed solution device based atHighways intersection i.e. Entry/ exist point - Total 16 Location as identified by User/ Ghaziabad Police Department |
34 | Speed Monitoring system with device |
35 | ANPR Camera with Application (assume 3 Lane) |
36 | Pole with cantilever along Switch, UPS with Junction Box |
37 | LPU |
38 | PA & ECB System |
39 | IP based PA System; Switchable, Multi Zone, PA Speakers, voip/Amplifier with Built-in Digital signal Processor (PA system location assuming higher side at 3 arm junction-30, later may be reduce or interchange as per actual input by user/ police) |
40 | ECB System (Emergency Call Box) |
41 | Cat 6 Cable |
42 | Power Cable |
43 | System software and Application licenses - Analytics for surveillance, Traffic (including AI) |
44 | DB License & Virtualization |
45 | Network Management System (NMS) or Enterprise Management System Software (Total Node Sensor Approx 3000+) |
46 | Video Management Software |
47 | Video Management Softwarewith failover |
48 | Video Traffic Analytics Software (including AI) |
49 | (nohelmet, Triple Riding, Wrong Way, No Parking, Red-Speed )These use case will be deployed on each ANPR Lane |
50 | Video Surveillance Analytics Software (including AI) |
51 | (Animal Detection, Smoke /Fire, Crowd Detection, littering,Help detection)Any three use cased will be deployed on each Surveillance Camera and Solid Waste surveillance Camera) (use case may vary) & ATCS Software - Central |
52 | RLVD License -Central |
53 | ANPR license – Central |
54 | Speed Detection Software(software+ License) - Central |
55 | E-Challan Application ?Central with NIC portal |
56 | Traffic Monitoring and Management System - Central |
57 | DB License & Virtualization |
58 | Video Summarization System (VSS) |
59 | Facial Recognition System (FRS) |
60 | Intelligent Video Analytics (IVA) |
61 | SOLID WASTE MANAGEMENT -ICT Enabled Solid Waste Management |
62 | Solid Waste Management Application Software Development and Commissioning of Integrated SWM Application (web/mobile Compatible), SMS integration, Geocoding/ Geofencing/ Survey of sites (Offices/ dumping grounds/stations/ bins), asset tracking including cameras, weigh bridge and MSI application for Project health checkup/audit and complain Redressal system. This is Master view for Staff and Administrators. |
63 | Dust bin tag/sensor RFID(Location /Qty may be change as per end-user input) |
64 | Dust bin Tracking System Web portal |
65 | Other Accessories (Electric and Network Cabling Infrastructure) |
66 | Integration with existing Weighbridge |
67 | Integration with all the solution in ICCC |
68 | Surveillance Camera (Bullet) for Weighing Points |
69 | Surveillance Camera (Bullet) for MRF |
70 | Surveillance Camera (Bullet) for Transfer Points |
71 | Std. Polefor Reader & camera with switch (8Port) & Junction box & UPS |
72 | Installation and Commissioning of above solution |
73 | Training Charges for Above Solution |
74 | Environmental Sensor |
75 | Environmental Sensor |
76 | EMS System web portal |
77 | Variable Messaging Board with Pole & Structure |
78 | Command Control Room (Hardware Component) |
79 | 70" (diagonally) with LED Light Source complete configuration - Main Control Room (4X3) Cube (12 screen) |
80 | Video Wall Controller & Application |
81 | Workstations |
82 | IP Based MFP Printer |
83 | LED Screen |
84 | Video Conferencing System |
85 | Surveillance System (Camera) for Control Room for 8 CCTV with NVR solution |
86 | Biometric access control system |
87 | IP PBX with required license & System, ACD and Call & Recording license with system, IP Phones with 5 head set |
88 | UPS with 1 Hr Battery backup - 20 KVA |
89 | IP PA Console |
90 | Network Component (Servers in City Control Room) |
91 | L3 Switch 24port –Manageable |
92 | Routers |
93 | Core Switches |
94 | Firewall and IPS/IDS |
95 | 24 Core rack mounted LIU with all accessories including fibber, patch card etc. |
96 | Central antivirus security |
97 | Patch Cord (1 Mtr.) |
98 | Patch Cord (3 Mtr.) |
99 | 24 Port Patch Panel (Fully Loaded) |
100 | 42U Network Rack |
101 | Load balancer and ddos |
102 | Next Generation Firewall |
103 | KVM Switch |
104 | Cloud Infra |
105 | L3 Switch 24port –Manageable |
106 | Routers |
107 | ICCC Component |
108 | Integration (Surveillance, Solid-waste, ITMS, Environment & other internal application) |
109 | Application ICCC Integrated command and Control Center Application as per the RFP requirement |
110 | Hardware (Including Server + IT Infrastructure+Non-IT Infrastructure + Utilities etc.) |
111 | Control Room Infra & Network Connectivity |
112 | Furniture for Operator Desks |
113 | Furniture for Manager"s Desk |
114 | Furniture for Meeting Table and Chairs |
115 | Furniture for Contact Center Operator Desks |
116 | Furniture for Security Room Desks |
117 | Furniture for "Technical Support Team Desks |
118 | Furniture for War Room |
119 | VESDA/ Fire Alarm & Suppression System |
120 | Network Connectivity (Junction, Entry /Exit, and solid waste location network connectivity) |
121 | Network connectivity from field to CC ( Junction, Entry /Exit, and solid waste location)- Setup Cost |
122 | Internet Bandwidth at CC@30 Mbps for multi purpose use. Setup Cost |
123 | Row, Incremental Fiber Cost- Customer Scope |
124 | Onsite ( 5 Years) |
125 | O & M(5Yrs) Project Manpower (ITMS Expert, Surveillance Expert, Pantry Staff, Electrical and Plumbing Team) |
126 | Manpower Cost |
127 | Project Manager (5 Yrs) |
128 | CCC Manager (5 Yrs) |
129 | Solution Support Personnel at CCC (5 Yrs) |
130 | Operators (5+4+3) In three Shift (5 Yrs) |
131 | Initial Project Implementation Manpower (5 Yrs) |
132 | Disaster Recovery Centre (For 1 year) The Data will be directly stored on Cloud Server |
133 | Storage (only 100% for E- Challan) |
134 | Storage for Other Apps |
135 | Cloud Installation & Set-up (One time) |
136 | Network Cost for 5 Yrs |
137 | Network connectivity from field to CC ( Junction, Entry /Exit, and solid waste location)- for 5 yrs |
138 | Internet Bandwidth at CC@30 Mbps for multipurpose use - 5 Yrs |
139 | Extra Item If need in this work (Only for providing rate for the items, not including in this work) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail