Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 0 days TDR #42423982

Tender For Construction Of Steel Pipelines And Associated Facilities For Interconnection To M/S Iggl At (I) Ip-03 Jalpaiguri, (Ii) Sv-32 (Baihata Chariali) And (Iii) Rt -Panikhaiti

Issued by Boards / Undertakings / PSU · Kamrup Metro, Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Mar 2024
0 days left
EMD
8.15 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kamrup Metro → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Steel Pipelines And Associated Facilities For Interconnection To M/S Iggl At (I) Ip-03 Jalpaiguri, (Ii) Sv-32 (Baihata Chariali) And (Iii) Rt -Panikhaiti => Limited

BOQ

Name of Work: CONSTRUCTION OF STEEL PIPELINES AND ASSOCIATED FACILITIES FOR INTERCONNECTION TO M/S IGGL AT IP-03 JALPAIGURI FOR GANGTOK SPUR P/L - (PART-A)
Sl. No. Item Description
1SCHEDULE OF RATES : SECTION-A (MAIN LINE WORKS)
2PIPELINE LAYING / INSTALLATION (CARBON STEEL PIPES)
3Receiving and taking over, as defined in the specifications, handing, loading, transportation and unloading of Owner-supplied 3-layer PE coated line pipes along with associated fittings and valves from Owner\"s designated stock-yard to Contractor\"s stock-yard / workshop / work-site including preliminary activities, preparation of drawings wherever required for crossing, etc. including handling, stacking, stringing on the pipeline right-of-use / pipeline route alignment, carrying out inspection of Company-supplied materials, including line pipes, at the time of taking over, laying / installation of coated line pipes, associated fittings (IJ,barred tee etc) and accessories, including execution of all works, taking over, handling, including loading and unloading, arrangement of all additional land required for Contractor\"s storage, fabrication,procurement and supply of all consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline, as per drawings, specifications, other provisions of Contract Document and instructions of Engineer-in-Charge (EIC), including, but not limited to, carrying out following works:
4Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities. Shifting of all obstructions within the ROU / pipeline route alignment, viz. electrical lines / poles, telephone lines / poles, coordination with concerned authorities and obtaining permissions from these authorities.
5Trenching to all depths by excavation in all types of soils except Rocky terrain, chiselling or otherwise cutting different types of pavement, footpath, roads etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline and optical fibre conduit as per the relevant standard / specification etc. [The minimum depth of the top of pipeline shall be 1.0m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per Special Condition of Contract (SCC) / OSID - 141 OISD - 226]. Dewater of trenches if required as per site condition.Note : Additional payment on account of excavation in Rocky Terrain ( Where execavation is not possible by JCB, Poclin, Trencher, Manual etc.and Excevation shall be done byBreaker/Blasting required for execavation) for breaking rock will be donewill be as per SOR item No. A00120 based on actual measurement for Rocky Terrain encountered as certified by the EIC.
6Carrying out repairs of pipe defects / replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects / damages occurring during transportation / handling.
7Stringing of line pipes along ROU including providing straw / sand / soft soil bags, soft padding / sand padding.
8Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding & field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray/Gamma ray as per specifications in piping of all types and thickness and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities & personnel to process, develop, examine and interpret radiographs & other tests as required, carrying out repairs of weld-joints found defective by EIC, carrying out re-radiography and other tests as required on repaired joints, etc. as mentioned in SCC and particular job specifications.
9Installation of carrier line pipe at all crossings viz road, cartrack, pathway, drain, nallah & minor water crossings, etc. at designated depth by open cut (including laying of casing pipe) (except at HDD/ Boring cased crossings which is covered separately elsewhere in this SOR).
10Coating of all weld joints, long radius bends, etc.
11Installation / lowering the pipeline in trench to required depth, placement of PE / PVC warning mat over the pipeline along the complete route, pre-padding and post padding around pipeline (as per standard) with soft soil/sand including supply of padding material/rock shield , PE / PVC warning mat, backfilling with available / borrowed earth, approved excavated material and /or other suitable soil by crowning.
12Supply and installation of slope breakers, bank protection, wherever required and as directed by EIC.
13All tieing-in, including the tie-ins with adjacent section of the pipeline.
14Lowering the pipelines in trench, providing required depth and backfilling over and around the pipeline with available, approved excavated material as per specification and / or other suitable soil approved by EIC.
15Select soil for backfilling, if required, as per specification including supply of graded sand / rock / other types of soil in place of available excavated material and / or other suitable soil, including transportation of such special backfill material over all distances, complete.
16Protective coating of 450 microns thick 2-component high built coal tar epoxy (applied with the help of minimum 3 coats) including supply of coating & other materials duly approved by Owner for all piping valves, fittings, structural steels, etc. for buried installation and inside the valve-pit.
17Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline with required quantity of corrosion inhibitor including pre-testing of designated sections complete as per specification and approved by EIC to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples, etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defect attributable to Contractor (rectification of defects in linepipe material not attributable to Contractor shall be paid separately as per other item of SOR), re-testing after rectification, dewatering after successful completion of hydrotesting of entire section and as approved by EIC.
18Swabbing of the complete pipeline section and the associated facilities being installed to the specified acceptance criteria, carrying out pre-commissioning works, providing assistance during the complete duration of commissioning operations for entire pipeline and making the entire pipeline system ready for commissioning including supply of all equipment, manpower, consumables, pigging and Nitrogen purging and preservation maintaining Nitrogen column of minimum 5% of pipeline volume (payment for supply of Nitrogen shall be paid seperately as per SOR no- B0011000), Materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract Document and instructions of EIC.
19Final clean-up of right-of-use and disposal of debris and surplus material to designated disposal areas and reinstalling the area to its earlier state as per satisfaction of concerned authority and as directed by EIC.
20Preparation of as-built drawings, pipe-books (2 soft copy in AutoCad format in CD, 2 soft-copies in PDF format (in CD) and 4 hard-copies of pipe-book) All the works shall be executed in accordance with the provision of Contract including carrying out all temporary / ancillary / auxiliary works required for the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for precommisioning activities.
21Line pipe laying & installation with radiography@Note: Additional payment for Hydrotest shall be paid seperately as per SOR A00950.
22Specified Size (NB)
23100 (4\"), diff. grades & thickness (applicable for Connectivity cumulative length of mainline upto 500 meters)
24Note: (1) This item shall be applicable for the underground steel main pipeline & underground tap-off points(i.e. including arrangement for making provision for tap-off except hot tapping and their hook-up) on existing / proposed steel main pipeline to Insulating Joint at proposed Receiving / Dispatch Station; (2) All crossings installed by HDD /jacking / boringshall be paid separately as per the rates quoted for the same elsewhere in the SOR.
25Excavation in Rocky Terrain (Execavation by Breaker/Blasting) Note: 1. Where execavation is not possible by JCB, Poclin, Trencher, Manual etc.and Excevation shall be done byBreaker/Blasting required for execavation.
26Supply and installation of Concrete Slab / HT sheeting for Protection of Pipeline against underground HT cables /over head HT lines as per drawing and specification attached with tender document
27INSTALLATION OF CARRIER PIPE CROSSINGS BY HDD METHOD AT CROSSING WITHOUT CASING PIPE in all types of soils i.e. normal soil//murram etc. exceptRocky Terrain
28“Complete work of installation of carrier pipe at crossings (between the limits as defined in approved drawings. Drawing preparation and obtaining the approval on the same is included in the scope of Contractor) by HDD method for roads, nallahs, drains and canals, wherever required, in all types of soilsi.e. normal soil/soft rock/murram etc. except rocky terrain, including \"receiving and taking over\" Owner-supplied 3-layer PE coated line pipes from Owner\"s designated place of issue / dump-site(s) and transportation to Contractor\"s stock-yard / workshop / work-site including all handling loading, unloading, aligning, etc. supply of all Contractor-supplied materials, manpower, equipment, consumable, other resources and acquiring the required land for storage, fabrication, including string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve and repair of pipeline coating with special repair patch materials as per specification, strapping of HDPE conduitwith main pipeline for laying / blowing of OFC cables, pre-testing, etc. of complete string made for crossing access for Contractor, etc. and execution of, but not limited to, following works in accordance with the specifications and instructions of EIC, and as per all provisions of Contract Document.”
29Pre-construction survey based on site-visit, carrying out all additional topographical, hydrological & geo-technical surveys as required for design & construction of crossing, collection of data (if reqd.) from concerned authority including design & detailed engineering and making of crossing drawings for getting their approval from concerned authority / EIC, getting work permit / NOC for crossings as well as utility crossings (if any) encountered during crossings prior to start the execution of work.
30Drilling to required depth including maintenance of drill hole in all types of strata (in all types of soilsi.e. normal soil/soft rock/murram etc. except hard rock), all depth to accommodate the pipeline at all conditions encountered during crossing by approved HDD methods procedure for providing minimum cover specified in code / specification or as decided by concerned authority, whichever is more.
31Backfilling of the ditch / trench including restoration and cleanup of area and all other works including cleaning, final hydrotesting, etc. alongwith mainline works (as mentioned in clause no. A00100 above) required as per specification, approved drawings, calculations, methods and to the satisfaction of EIC and / or as directed by concerned authority.
32Installation of 4\" NB 3LPE Coated Carbon Steel Pipeline by HDD
33Note: (1) The length mentioned in SOR is indicative for all the crossing to be done by HDD & locations shall be decided by GAIL / Consultant prior to start of job depending upon site-condition; (2) Payment for the length of final tied in carrier pipeline string with mainline laid by HDD are inclusive in this above item rate. No any separate payment shall be made under other clauses mentioned elsewhere.
34INSTALLATION OF CARRIER PIPE CROSSINGS BY HDD METHOD AT CROSSING WITHOUT CASING PIPE INROCKY TERRAIN
35“Complete work of installation of carrier pipe at crossings (between the limits as defined in approved drawings. Drawing preparation and obtaining the approvalon the same is included in the scope of Contractor)by HDD method for roads, nallahs, drains and canals, wherever required, inRocky Terrain , including \"receiving and taking over\" Owner-supplied 3-layer PE coated line pipes from Owner\"s designated place of issue / dump-site(s) and transportation to Contractor\"s stock-yard / workshop / work-site including all handling loading, unloading, aligning, etc. supply of all Contractor-supplied materials, ,manpower, equipment, consumable, other resources and acquiring the required land for storage, fabrication, including string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve and repair of pipeline coating with special repair patch materials as per specification, strapping of HDPE conduit with main pipeline for laying / blowing of OFC cables, pre-testing, etc. of complete string made for crossing access for Contractor, etc. and execution of, but not limited to, following works in accordance with the specifications and instructions of EIC, and as per all provisions of Contract Document.”
36Pre-construction survey based on site-visit, carrying out all additional topographical, hydrological & geo-technical surveys as required for design & construction of crossing, collection of data (if reqd.) from concerned authority including design & detailed engineering and making of crossing drawings for getting their approval from concerned authority / EIC, getting work permit / NOC for crossings as well as utility crossings (if any) encountered during crossings prior to start the execution of work.
37Drilling to required depth including maintenance of drill hole in Rocky Terrain, all depth to accommodate the pipeline at all conditions encountered during crossing by approved HDD methods procedure for providing minimum cover specified in code / specification or as decided by concerned authority, whichever is more.
38Backfilling of the ditch / trench including restoration and cleanup of area and all other works including cleaning, final hydrotesting, etc. alongwith mainline works (as mentioned in clause no. A00100 above) required as per specification, approved drawings, calculations, methods and to the satisfaction of EIC and / or as directed by concerned authority.
39Installation of 4\" NB 3LPE Coated Carbon Steel Pipeline by HDD
40Note: (1) The length mentioned in SOR is indicative for all the crossing to be done by HDD & locations shall be decided by GAIL / Consultant prior to start of job depending upon site-condition; (2) Payment for the length of final tied in carrier pipeline string with mainline laid by HDD are inclusive in this above item rate. No any separate payment shall be made under other clauses mentioned elsewhere.
41PERMANENT MARKERS
42Supply, fabrication & installation of following types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction of pedestals & grouting with concrete, cleaning, supply & application of approved colour & quality of primer and paint, stencil letter cutting for numbers, direction, chainage, etc., restoration of area to original condition & performing all works as per drawings, specifications and instructions of EIC.
43Pipeline Warning Signs
44Right-of-way Boundary Markers
45Direction Markers
46Pipeline laying liaisoning with statutory authorities / Permission Issuing Authorities
47Liaisoning with statutory Authority /Permission issuing Authorities for obtaining routine work permit for execution of work and NOC from various Statutory Authority having jurisdiction before/during execution of work and for complyingwith all stipulations/ conditions and recommendation of the said Authority.Required Permission shall be arranged/obtained by the Owner.(Note :- Payment shall be based on the actual length of pipeline laid).
48Statutory Permission For Pipeline Crossing From various Authorities(Railways, NH, SH, Irrigation, PWD Etc.)
49Requirement Statutory permission for pipeline crossing for execution of work of various authorities like (Railways, NH,SH, Irrigation, PWD Etc.) shall be arrange by Contractor (If it is not arrange by Owner).@Note: Statutory fee/demand fee shall be paid/reimburse by GAIL as per actual.
50INSTALLATION OF CARRIER PIPE CROSSINGS BY MOILING METHOD AT CROSSING WITHOUT CASING PIPE
51“Complete work of installation of carrier pipe at crossings (between the limits as defined in approved drawings) by moiling methodfor roads, nallahs, drains and Factory Gates etc., wherever required, in all types of soils,murram. This includes \"receiving and taking over\" Owner-supplied 3-layer PE coated line pipes from Owner\"s designated place of issue / dump-site(s) and transportation to Contractor\"s stock-yard / workshop / work-site including all handling loading, unloading, aligning, etc. supply of all Contractor-supplied materials,manpower, equipment, consumable, other resources and acquiring the required land for storage, fabrication, including string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve and repair of pipeline coating with special repair patch materials as per specification, strapping of HDPE duct as the case may be with main pipeline for laying / blowing of OFC cables, pre-testing, etc. of complete string made for crossing access for Contractor, etc. and execution of, but not limited to, following works in accordance with the specifications and instructions of EIC, and as per all provisions of Contract Document.”
52Pre-construction survey based on site-visit, carrying out all additional topographical, hydrological & geo-technical surveys as required for design & construction of crossing, collection of data (if reqd.) from concerned authority including design & detailed engineering and making of crossing drawings for getting their approval from concerned authority / EIC, getting work permit / NOC for crossings as well as utility crossings (if any) encountered during crossings prior to start the execution of work.
53Drilling to required depth including maintenance of drill hole in all types of strata (in all types of soils, / murram ), all depth to accommodate the pipeline at all conditions encountered during crossing and providing minimum cover specified in code / specification or as decided by concerned authority, whichever is more.
54Backfilling of the ditch / trench including restoration and cleanup of area and all other works including cleaning, final hydrotesting, etc. alongwith mainline works (as mentioned in clause no. A00100 above) required as per specification, approved drawings, calculations, methods and to the satisfaction of EIC and / or as directed by concerned authority.
55Laying of 4\" NB Carrier pipe without casing by Moiling method
56Note: i)The length mentioned in SOR is indicative for all the crossing to be done by Moiling & locations shall be decided by GAIL / Consultant prior to start of job depending upon site-condition.ii) Payment for the length of final tied in carrier pipeline string with mainline laid by Moiling are inclusive in this above item rate. No any separate payment shall be made under other clauses mentioned elsewhere.
57Hiring and deployingof fire tendersalong withaccessories and operating crew. The rates quoted shall be inclusive of all expenses.
58Deployment of Fire Tenders for 12 Hrs
59Hiring and deployingof FINAL HYDRO TEST EQUIPMENT along withaccessories and operating crew. The rates quoted shall be inclusive of all expenses and consumable etc. (Item to be claim seperately for projecttesting by dead weight test& graph), \"\" The payment of this item shall be made in addition to item No A00100 and associated Mainline items. \"
60Deployment and completion of post hdro testing of complete P/L project
61Note: (1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of EIC. The unit rate shall be operated to work out the final payment to the contractor; (2) In each area, quantities given against individual item may be utilised / used for other consumers in same area.
62SCHEDULE OF RATES (SOR): SECTION-B [MECHANICAL (PIPING & TERMINAL WORKS)]
63PLANT PIPING (ABOVE GROUND)
64Complete Carbon Steel Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts, etc., as described below
65Transportation of all piping items from Contractor\"s storage point to work site complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further commissioning / start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications indicated in particular job specification & scope of work indicated in SCC, drawings, specification and instructions of EIC and as per all provisions of the Contract Document.
66Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges, etc. to match with the matching edges of uneven / different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of gasket & stud bolts (Below 4\") & (4\" and Above 4\" shall be paid as per SOR), nuts, U-clamps, etc. as required for completion of job.All fittings installation shall be paid linear meter basis under this item only.
67Handling and installation of all types & size of valves including assembly of valve accessories/ Actuator, (if any) by bolting, threading or welding, supply and insertion of gaskets, nuts & bolts, nipples, tubing etc. at all elevations of pipe sleepers, supports or overhead on racks, equipments nozzle, skid & painting etc. supply of all consumables, manpower, equipment, etc. for completion of all works as per scope of work and as per drawings, specifications and instructions of EIC including servicing / cleaning of valve wherever required.
68Installation of weldolets, sockolets, flanges, vent and drain point connection, etc.,as required.
69Erection including prior cleaning, lifting, placing on pipe sleepers and supports, overhead on racks, skids and at all elevations including installation, design & fabrication of all type of supports / jump-over and carrying out connected activities for all types of valves including supply & fixing of gaskets, studs / bolts, nuts wherever required for all sizes, leveling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie-in with existing piping / facilities, etc. tapping for inline instruments like pressure gauges, thermowells, sample connection, etc.
70Design and Residual Engineering
71Preparation of bill of material(BOM)
72Preparation of Construction, Fabrication, GAD, isometric and As-built drawings
73Carrying out all Non-destructive testing as required except Radiography.
74Surface preparation before application of primer by means of sand blasting including supply of approved quality of sand, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of EIC.
75Painting of entire system (including aboveground all pipes fittings, flanges & accessories) suitable for Normal corrosive area environment including supply of approved paints & primers, application of primer & paints, identification lettering / numbering, color-coding, etc. as specified including rub-down & touch-up of shop primer or scrapping of shop primer wherever required by Company and providing scaffolding for all heights, etc.
76Cleaning and flushing by water / compressed air, testing of the systems including hydrostatic, pneumatic and any other types of testing as specified, draining, drying by compressed air / other methods approved by Company.
77Precommissioning & making operational all piping system and equipments.
78Commissioning Contractor scope shall provide all necessary assistance in term of supply of manpower, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.
79Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start-up.@Note: For Below 2\" Carrying out all Non-destructive testing as required are including in this SOR Items.
802\" and below ( Sch-60/Sch-80/Sche160/XXS/XS)
8112\" and Above( Above 19.3 mm)
824\" NB Piping different grades & thickness
83INSTALLATION OF VALVES
84INSTALLATION OF ABOVE GROUND FLANGED VALVES (BALL / PLUG / CHECK / GATE / GLOBE) AS PER DETAILS GIVEN BELOW:
85Size - 2.0 Inch, Rating - 150#/300#/600#
86INSTALLATION OF ABOVE GROUND BUTT WELDED/SOCKET WELDED MANUAL VALVES (BALL / PLUG / CHECK / GATE / GLOBE) AS PER DETAILS GIVEN BELOW:
87Size - 12.0 Inch, Rating - 150#/300#/600#
88Size - 4.0 Inch, Rating - 150#/300#/600#
89Size - 2.0 Inch, Rating -150#/300#/600#
90Size - 3/4 Inch, Rating - 800#
91INSTALLATION OFABOVEGROUNDGAS ACTUATED VALVESAS PER DETAILS GIVEN BELOW
92Size - 4 Inch,
93SUPPLY OF ASSORTED PIPE, VALVES , FITTINGS AND FLANGES
94Complete work of supply of pipes, valves, fittings and flanges including all taxes, duties, transportation and inspection charges but not limited to, the following items in accordance with relevant specifications indicated inscope of work , drawings, specification and instructions of EIC and as per all provisions of the Contract Document.
95Handling including lifting, transportation from Contractor Stores to Contractor\"s workshop for fabrication and/ or to work-site for field fabrication and erection for all piping items supplied by Contractor.
96CARBON STEEL (CS) PIPES
97CS Pipes 2\" NB Sch XS API 5L, Gr.B, Seamless, BE / A 106 Gr.B.
98CS Pipes 3/4 \" NB Sch 160 , A 106 Gr.B.
99VALVES
100Supply of Butt/Socket Welded- Female (SW) Ends Ball Valves as perPMS and Data Sheet
101Size - 2 Inch, 600#, BW Ends, Design Standard - BS EN 1SO 17292, Floating type, Full Bore Ball Valve, Lever Operated
102Supply of Plug Valves as per PMS and Data Sheet
103Size - 2 Inch, 600#, Flange Ends, Design Standard - BS EN 1SO 15761,
104Supply of Sockolet conforming to MSS-SP-97, Material - ASTM A105 and as per details given below:
10512\" x 3/4\", 6000#
1064\" x 3/4\", 6000#
107Supply of Weldolet conforming to MSS-SP-97, Material - ASTM A105 (CHARPY)-As per attached QAP in Tender and as per details given below:
10812\" x 2\", Thk/Sch - XS
109Nipple
110Supply of Nipple 3/4 inch, ASTM-106, Sch- XXS ( One side Threaded(NPT)-Male, One side socket welded)- Length : 150MM
111Supply of Stud & Bolts As per ASME B16.50 & 3.2 Certification
112Size- 4\" #600, L -146.05 MM, Thk. 22.22 MM, NO OF STUD & BOLT-8,STD-STUD WITH 2 HEXAGONAL NUT, STUD MATERIAL AS PER ASTM-A193GrB-7,NUT MATERIAL AS PER ASTM-A194Gr2H, HOT DIP GALV.
113Size- 12\" #600, L -222.25 MM, Thk. 31.75 MM, NO OF STUD & BOLT-20, STD-STUD WITH 2 HEXAGONAL NUT, STUD MATERIAL AS PER ASTM-A193GrB-7,NUT MATERIAL AS PER ASTM-A194Gr2H, HOT DIP GALV.
114Note: Quantity may vary as per actual
115Supplyof Gasket& 3.2 Certification
116Size- 4\", GASKET ,TYPE--SP. WND, SS316 with WITH GRAPHITE FILLER +CAF,600#,
117Size-12\", GASKET ,TYPE--SP. WND, SS316 with WITH GRAPHITE FILLER +CAF,600#,
118RADIOGRAPHY
119Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing / hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressly mentioned but required to perform the work as per specifications and instructions of EIC (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor\"s welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the EIC for acceptance whose decision shall be final and binding.
120Radiography 2\" NB
121Radiography 4\" NB
122Radiography 12\" NB
123RECEIVING & TAKING OVER, HANDLING, TRANSPORTATION OFPIPES , FLANGES , FITTINGS , VALVES/ FILTERING/ METERING SKIDS/PRS/PIG TRAPS & OTHER EQUIPMENTSETC (TERMINAL / MAINLINE MATERIAL/ SURPLUS MATERIAL) - ANYWHERE IN INDIA
124The Contractor shall receive and take over, Handling including lifting, Owner-supplied bare / 3 LPE Coated line pipe / Ball Valves ,Flanges , Fittings, filtering, metering, prs skid, pig traps and any other material from GAIL\"s designated store, inspection of material at dispatch point as well as destination point and its transportation to work-site(including transit insurance) / return of project surplus / sparable material from Project site / Contractor\"s store to GAIL\"s store / warehouse including loading on trucks / trailers, transportation, unloading & stacking on wooden sleepers at Contractor\"s own stock-yard near work-site(s) / GAIL store (as applicable), including arrangement of truck / trailers / cranes / other material/ machinery / manpower / consumables.
125Transportation by Trailer Fix up to 0-50 KM (Weight up to 18 Ton) per trip
126Transportation by Truck Fix up to 0-50 KM (Weight up to 3 Ton) per trip
127Transportation by Truck Fix up to 0-50 KM (Weight up to 10 Ton) per trip
128Transportation by Trailer Capacoty 18 Ton (40\" L X 8.6\" W X 7\" H) Beyond 50 KM in addition to SOR Item No. B005010.
129Transportation by Truck (Weight up to 3 Ton) Beyond 50 KM in addition to SOR Item No. B005020.
130Transportation by Truck (Weight up to 10 Ton) Beyond 50 KM in addition to SOR Item No. B005030.
131Note: (1) Transportation up to 50KM shall be paid by SOR no. B005010/B005020/B005030. Beyond 50KM transportation shall be paid by SOR no. B005040/B005050/B005060.(2) The nominal quantity of pipes, fittings and valves must be accommodated with other material like M-skid, PRS, Pig Launcher / receiver etc. if feasible.(3) The quantities given in above item no. are tentative only and shall not be considered to be binding. The quantities may be increased, decreased or deleted as per the actual site requirement and instructions / recommendations of Owner. The unit rate shall be operated to work out the final payment to the Contractor; (4) Above price shall be exclusive GST but inclusive of all type of toll taxes & duties, transit insurance during transportation & other insurance, etc. including all financial & commercial implication as per the tender document.(5) The weightage of material may be varies as part load or full load as per the project requirement, Bidder to be quoted the price accordingly.
132FIRE EXTINGUISHERS (Portable)
133Supply, installation and commissioning of the following fire extinguishers:
134CO2 (10 Kg) considered1 no. for each locations
13510 kg capacity DCP fire extinguisher (portable) considered1 no. for each locations
1366 kg capacity DCP fire extinguisher (portable) considered1 no. for each locations
1374 Nos. Sand Buckets with stand & canopy considered 1 set for each location
138INSTALLATION OF FILTERING/ METERING/ PRSSKID/ ANALYZERAND SCRAPER TRAPS
139Installtion ofabove ground owner suppliedFiltering , Metering , PRS Skid, Analyzer,Pig traps and other equipmentat work site up to mechanical completition in all respect, inclusive of shifting within campus and painting suitable for Normal Corrosive Environment at all elevation , fixing of foundation bolts, welding wherever required, aligning, grouting, hooking-up,enabling works as required and completing in all respect as per drawings, specification and instruction of EIC.Contractor scope also include to provide commissioning assitance during pre-commissing / commissioningof filtering skid/metering skid /PRS/pig trap and other equipments. Note:Instalation and commssioning of Instrumentation items such asGas Chromatograph (GC) &metering panel(flow computer panel), cable laying are seperately covered under Instrumentation SOR
140Installation ofabove ground Filtering/ Metering/ Pressure Reducing Skid/Analyzer up to mechanical completion in all respect inclusive of painting suitable for Normal Corrosive Environment at various loactions.
141PADDING FOR PIPE SUPPORTS (4 Inch and Above)
142Preparation, Fabrication and erection of padding for pipe supports (for all sizes/ thickness) by owner supply material(pipes). Welding shall be done by approved welder as per Approved WPS of Station piping with Root 6010 & Hot pass 7018 .
143CS Structural Steel
144NITROGEN SUPPLY
145Supply of Nitrogen for preservation ofPipeline/ purging of pipeline / hookup & shut downactivities .
146Note: (1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of EIC. The unit rate shall be operated to work out the final payment to the Contractor; a(2) Quantities given against individual item may be utilised / used for other consumers in same area.
147SCHEDULE OF RATES (SOR): SECTION-C [CIVIL / STRUCTURAL & ARCHITECTURAL]
148FENCING & GATE
149Supplying, fixing and tensioning in position 2.5mm(12gauge), 2 ply, 4 points, GI Barbed wire designation A-1 conforming to IS:278 in horizontal rows and cross diagonals for compound wall \"Y\" shaped overhang etc. with necessary GI staples, clips and pins, GI straining bolts and binding wire with all labour and materials etc. complete as per drawings, specifications and directions of Engineer-in-Charge.(The barbed wire shall be measured in linear length of the barbed wire actually fixed).
150Supplying,fabricatingandfixinginpositionstructuralsteellineposts, straining posts, struts for \"Y\" shaped overhang etc. conforming to IS:2062 over brick/stone Masonry/ RCC compound walls/ columns, cutting to required size as per drawings and specifications, welding where necessary, embedding in position, holding to correct level and line, any auxiliary structure for dummy supports, drilling holes and painting as per painting specification attached with tender, cutting brick/rubble/concrete surfaces if necessary, grouting with M20 grade concrete including cost of grout with all labour and material etc. complete as per drawings, specifications and directions of Engineer-in- Charge.( All materials including cement shall be supplied by contractor)For Normal Industrial Environment.
151Supplying, fabricating and fixing G.I. chain link fencing with 3.15mm dia. wire, 50x50mm diamond mesh chain link fence fabric conforming to IS:2721 fixed to steel/RCC posts/struts above ground level, including supply of chain link fencing fabric, stretcher bars, staples, etc. required for fixing the fencing, fixing of chain link fencing between straining posts, fixing of bottom of fencing to a concrete sill beams by means of hairpin beams by means of hairpin staples, including supply and fixing line wires, completeasperdrawings,specificationsanddirectionsofEngineer-in- Charge.
152Providing andfixinginposition Steel Entrance Gatesconsisting ofMC- 75 framework for shutters, 20mm square M.S. vertical bars welded to the framework@100mmc/c,3mmthickM.S.sheetboxing,locking arrangement, 25mm thick, 75mm dia M.S. wheel with ball bearing includingfixingthegatetoRCC/masonrybyM.S.hingearrangement (75mmx75mmx6mm M.S.angles,bolt,washers)andM.S.holdfast groutedwithM-15gradeconcrete,providingandfixingM.S.pivot,50mmx50mmx6mmM.S.Teebenttoshapeandembeddedinroad surfacefor gate openingtrack,gate stopper,paintingthe gate with approvedshadeandqualitysyntheticenamelpaint(twocoats)anda coatofapprovedqualityprimer,ensuringsmoothoperationofthegate etc. all complete as per attached standard drawing.
153PAVER BLOCK Flooring
154Supplying and placing in position as per approved pattern of Cement Concrete Inter locking paver block 80 mm thick of approved shape, rough finish, M-25 strength of approved brand laid over the sand bed of minimum 100 mm thick. The CC interlocking blocks to be of uniform Grey colour or as approved by EIC complete in all respects , as per technical specifications and directions of the Engineer-in-chargeNote :-1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such paver blocks,sand,earth work in excavation in cutting earth in all conditions, shutteringwith all bye works and sundry works.2.To be read with in conjunction with Particular Job Specification3.Supply of all materials and providing labour, tools and tackles are in contractor’s scope
155RCC HUME PIPE CULVERT
156Providing, laying, jointing and testing RCChume pipes of 500mm dia. and np3 class for culverts, road crossing, incl. excavation in all strata up to an average depth of 1 m cutting, collars jointing in 1:2 cement mortar etc. complete as per specifications and as directed by the engineer-in charge.
157SAND FILLING
158Supplying and filling approved SAND of specified quality under floors, in foundations, plinths, tank foundations etc. for all depths and heights including cost of sand,royalties, transportation to site for all leads and lifts,including loading, unloading, spreading in layers of loose thickness not exceeding 150 mm,watering,ramming,compacting with mechanical compactors and/or other equipment to the specified levels to achive 85% relative density as per IS:2720 Part XIV,including preparation of subgrade to the required slope,providing testing apparatus and testing the degree of consolidation all complete as per drawings, specifications and direction of Engineer-in-charge.The rates shall be inclusive of the cost of all labour,material,equipments etc. all complete .
159DEMOLITION OF R.C.C./BRICKS/STONE MASONRY/STEEL WORK
160Site clearance by demolition of R.C.C./Brickwork/Stone Masonry/Stone Soling, Flexible pavements etc. along with removing the debris and disposal of unserviceable material to any lead and staking of serviceable materials, handing over serviceable material to concerned department if requiredas per technical specifications and direction of Engineer-in-charge.Note:1. Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies, leads, loading/unloading, transportation, water, electric power, illumination etc. complete in all respects as per scope of work, detailed construction drawings, technical specifications and direction of Engineer-in-charge. 2.Demolition of RCC/PCC/Brick Masonry/Road will be paid in NET CUMas demolished.
161EARTH WORK IN FOUNDATION
162Earth work in Excavation below ground level for all kinds of works in ALL TYPES OF SOIL except Rocky Tarrainas classified in specification for a depth upto 1.5m including removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, levelling, grading and ramming of bottoms, dewatering of accumulated water from any source and keeping the surface dry for subsequent works and disposal or stacking of excavated material within a lead of 100m, as directed including providing temporary supports to existing service lines like water pipes, sewage pipes, electric overhead and underground cables etc. all complete.Note: For Rocky Tarrain excavation in foundation job separate payment shall be made as per SOR available in tender.
163For depth beyond 1.5m and upto & inclusive of 3.0m except Rocky Tarrain.Note: For Rocky Tarrain excavation in foundation job separate payment shall be made as per SOR available in tender
164Backfilling after execution of the WORK to proper grade and level with selected materials from available excavated soil from spoil heaps, including re-excavating the deposited soil excavated earlier, breaking clods, laying at all depths and heights in layers of thickness not exceeding 15 Cms. watering, rolling and ramming by manual methods/ mechanical compactors to achieve 90% laboratory maximum dry density, dressing, trimming etc. in foundations, plinths, trenches, pits etc. all complete.
165PLAIN & REINFORCED CEMENT CONCRETE:
166Providing and laying PLAIN CEMENT CONCRETE for all depths below and upto plinth level in foundations,drains, fillings, non-suspended floors, pavements & ramps or any other works etc. including shuttering, tamping, ramming, vibrating, curing, shuttering etc. all as specified in any shape, position, thickness and finishing the top surface rough or smooth as specified and directed all complete for concrete of nominal mix 1:4:8 by volume (1 Cement: 4 Coarse Sand: 8 Crushed Stone Aggregates/Gravels with 40mm and down size graded crushed stone aggaregates.
167Providing and laying REINFORCED CEMENT CONCRETE OF M-25 GRADE with 20mm and down size graded crushed stone aggregates/gravel in SUB-STRUCTURE of all types e.g. foundations, footings, raft, beams, slabs, pile caps, retaining walls, jambs, counterforts, buttresses, trenches, manholes,pipeencasement, catchpits, drains, RCC pits, equipment/machine foundations, pedestals, pipe sleepers, columns, plinth beams, suspended floors, beams, staircases, landings, steps, brackets etc. (including single pour concreting upto 250m3), including cost of admixtures if used,providing pockets, openings, recesses, chamfering etc., wherever required, vibrating, tamping, curing and rendering if required to give a smooth and even surface etc. all complete (excluding the Cost of Reinforcement and Shuttering) for all depths below and upto plinth level in any shape, position and thickness etc. all complete as specified, shown and directed.
168CENTERING AND SHUTTERING
169Providing and fixing CENTERING AND SHUTTERING in foundations, footings, raft beams, slabs, pile caps, retaining walls, jambs, counter-forts, buttresses, trenches, equipment/machine foundations, pedestals, abutments, pipe sleepers, columns, plinth beams, lintels, suspended slabs, beams, staircases, landings, steps, non-circular tunnels/bunkers/silos/ shafts/ hoppers/liquid storage structures etc. including shuttering for single pour concreting, strutting, bracing, propping etc., keeping the same in position during concreting and removal of the same after specified period etc. for Straight/ Inclined Shuttering, keeping necessary provision for inserts, projecting dowels, anchor bolts or any other fixture etc. all complete and as specified and directed.
170i)For all depths below and upto & inclusive of plinth level.
171ii) For all heights above plinth level.
172REINFORCEMENT
173Supplying and placing in position HIGH STRENGTH DEFORMED STEEL BARS REINFORCEMENT (conforming to IS:1786, Grade Fe 415), for R.C.C. work including transporting the Steel, straightening, cleaning, decoiling, cutting, bending to required shapes and lengths as per details, binding with contractor\"s own 16 SWG black soft annealed binding wire at every intersection, supplying and placing with proper cover blocks, supports, chairs, overlaps, welding, spacers, fanhooks etc. for all heights and depths etc. all complete as directed.
174STRUCTURAL STEEL WORKS
175Supplying, transporting, storing, fabricating in position and testing/examining bolted and/or welded STRUCTURAL STEEL WORKS at all levels and locations including all builtup sections/compound sections made out of rolled sections and/or plates/bent plates in trusses, purlins, wind ties, wind girders, columns, portals, racks, frameworks, crane gantries, surge girders, bracings, floor beams, lifting beams, monorails, platforms, staircases (excluding chequered plates and gratings), ladders, stoppers, brackets, side runners, sagrods, supports for equipment and technological accesories and process piping, hand railings, posts, conveyor galleries, trestles, towers, masts, junction houses etc., cutting to required size, straightening/bending if required, edge preparation, cleaning, preheating, bolting/welding of joints, (including sealing the joints of box sections with continuous welding), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, including preparation and submission of detailed fabrication drawings and applying primer after fabrication as perspecification (for normal corrosive environment), etc. allcomplete
176MISCELLANEOUS STEEL WORKS
177Supplying, fabricating and erecting in position at all levels and locations bolted, clamped and/or welded GRATING (fabricated as perstandards) made out of M.S. flats/M.S. flats with M.S. rounds in walkways, platforms, stair treads etc. including cutting to required size, shape, making holes, notches, openings of required size, nosing, straightening if required, making the edges smooth, removing the burrs, fabricating clamps, fixing, welding, preparation and submission of fabrication drawings and preparing the surfaces for painting, surface cleaning, wire brushing, removal of mill scale, dust, rust, oil or grease and applying one shop coat of Red Oxide Zinc Chromate Primer after fabrication etc. all complete as specified and directed.
178BRICK MASONRY
179Providing and laying BRICK MASONRY WITH BRICKS OF CLASS 7.5 in cement mortar 1:6 (1 Cement : 6 Sand) in one or more brick thickness and in any shape (excluding circular/curved brick masonry) at all depths and height including the cost of materials, labour, scaffolding/ staging, sampling & testing, soaking of bricks, cutting and laying of bricks, providing recesses, making openings of any shape & size, finishing the joints flush below ground level and raking out the joints above ground level, sealing the gap between masonry and soffit of beam/slab, embedding the fittings & fixtures, curing, etc. all complete as per specifications.
180External WallsOrdinaryplaincementplasterAverage18mmthick1:4(1cement: 4 sand). Cement supplied by the Contractor at their cost.
181Internal WallsOrdinaryplaincementplasterAverage12mmthick1:4(1cement:4 sand). Cement supplied by the Contractor at their cost
182Supplying and filling of Bouldors
183Supplying and filling of various sizes and type of boulders as per site requirement or as per direction of EIC.Rate involves supply, transportation, unloading at site, laying, etc. to complete the work in all respect.
184Note: (1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of EIC. The unit rate shall be operated to work out the final payment to the contractor; (2) In each area, quantities given against individual item may be utilised / used for other consumers in same area.
185SCHEDULE OF RATES (SOR): SECTION-D [CATHODIC PROTECTION WORKS]
186CATHODIC PROTECTION SYSTEM (TCP)
187All works shall be carried out as per approved drawings and specifications. Work shall include design / residual engineering, preparation of CP schematic drawing, supply, installation, testing and commissioning of complete CP system, all related civil work, including providing foundations, supply of all materials as specified in SCC, instruments, consumables, touch-up epoxy paint as required, including supply of paint, tools, tackles, labor, transportation for satisfactory completion of work and as per directions of EIC. In addition to the items mentioned below the Contractor\"s scope shall include connecting the new pipelines to existing pipelines/cathode-points of TR units by means of jumpering/bonding.
188Complete Detailed Survey,Engineering, Supply, laying, installation, termination, testing & commissioning of Cathodic Protection system complete Civil Works and all material and labour as per specifications, drawings and instruction of EIC. Work to be completed in all respects.
189Supply, laying & testing of 600 / 1100V grade single core, stranded tinned copper conductor cables, XLPE insulated / PVC sheathed, armoured as per IS of following sizes. The work shall include excavation for cable trenching at min. 1.2 m below GL in all types of soil including rock, backfilling of cable in trenches, lugging, ferrulling, making termination as per drawings & specification. Supply of all tools, tackles, consumables, etc. for completion of work, in all respect and as per directions of EIC.
19025 mm2
19110 mm2
1926 mm2
193Making cable to pipe connections by thermit welding for following cables, including excavation for exposing pipe, removal of coating / wrapping, thermit welding recoating of the area of weld by epoxy filling, holiday testing, backfilling, supply of all tool, tackles, consumables thermit weld kits & labour for satisfactory completion of work.
1946 mm2 Cables
19510 mm2 Cables
19625 mm2 Cables
197Supply & installation of test station as per enclosed drawings and technical specifications. Work shall include all related civil works including foundation, termination of cables inside the test stations along with lugs & ferules sealing of cable entry space with bitumen compound supply of all materials, consumables, tools, tackles, etc. for satisfactory completion of work and as per directions of EIC.
198Supply & installation of 20 Kg Zn anode at a depth of 1.5 - 2.0m on all type of soil including rock alongwith 10m tail cable of 25mm2 high conductivity, tinned, stranded copper conductor, 650 / 1100V grade, XLPE insulated, armoured, PVC sheathed for grounding electrical surges in the pipeline at HT crossings. The work includes excavation, laying of Zn anode of minimum 20 Kg weight, backfilling & all related civil work, complete in all respects. The work shall also include anode to tail cable connection, cable laying and termination inside the test station.
199Supply & installation of 5 Kg Mg anodes after pre-packaged with chemical backfill as per enclosed drawing. The anodes will have to be buried at a depth of 1.5 to 2m on all types of soil including rock at approved location. The work shall include all earth work, laying of anodes & cables in position and termination of cable inside test stations with lugs, shunt & variable resistors, supply of all tools, tackles, consumables, labour transportation of materials, etc. required for satisfactory completion of work and directions of EIC.
200Supply, installation, testing and commissioning of spark-gap arrestors across insulating joints.
201Supply and Installation of pipe to cable connection by Pin Brazing Encapsulation method
202Note: (1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of EIC. The unit rate shall be operated to work out the final payment to the contractor; (2) In each area, quantities given against individual item may be utilised / used for other consumers in same area.
203SCHEDULE OF RATES (SOR): SECTION-E [ELECTRICAL WORKS]
204Supply, installation, testing, commissioning of Street Lighting Fixture suitable for 250W HPMV or Equivalent LED Lamps on Lighting Poles (5mtr Height) with aluminium paint complete with mounting bracket, flameproof control gear box, internal cable from fitting to junction box, flameproof fittings etc. including civil foundation with pipe inserts for cables and connecting work, with all material and labour as per specifications, drawings and instruction of EIC. Work to be completed in all respects.
205Supply, installation, testing & commissioning of the complete earthing system, earth electrodes/pit, earth main ring, earthing of metering skid, electrical equipments, instrument panels, field instruments, process equipments & pipes / flanges including all associated civil work with all material & labour as per specification & drawings approved by the company. Each earthing system shall include the following.
20665mm dia 3 Mtr. Long GI PIPE Electrode with 6mm thick chequered plate cover, display board etc
207600x600x3mm copper plate Electrode with 6 mm thick chequered plate cover, display board etc
208GI Strip (50X6) mm
209GI Strip (25X6) mm
2101C 25 Sq.mm PVC insulated Cu Conductor
21110 SWG GI wire
212GI Wire, Copper wire, wire rope and all balance earthing material including copper strip (50 mmX 2 mm thick) jumper for flanges etc.as per the specification.
213Supply, laying, installation, termination, testing, commissioning of 1100 Volt PVC insulated, PVC sheathed and armoured / unarmoured cables in trenches, excavated underground / trays, pulling through pipes and its proper sealing including underground trench and supply of hume pipes for road crossing, etc. as required as per specifications and drawings approved by the company.
2144C X 6 Sqmm Cu conductor XLPE Insulated Armoured Power Cable of 1100V Grade
2153C X 2.5 Sqmm Cu conductor XLPE Insulated Armoured Power Cable of 1100V Grade
216Supply, installation Cable Route Marker complete in all respects.
217Note: (1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of EIC. The unit rate shall be operated to work out the final payment to the contractor; (2) In each area, quantities given against individual item may be utilised / used for other consumers in same area.
218SCHEDULE OF RATES (SOR): SECTION-F [INSTRUMENTATION WORKS]
219Supply, Calibration and Installation of instrumentation items listed below:(For details, refer instrumentation specifications)
220Pressure Gauge of different Range and rating as per site requirementEngineering , Design, Supply, testing, installation, erection and commissioning. Also supply of erection material like SS316 tube, SS316 fittings, manifold, mounting stand and all other required material. Bourdon type with 2-way manifold, direct mount, 150mm dial, wetted part SS316, IP 65 rated, blow out protection and shatter proof heavy duty glass. range (0-150 Kg/cm2)
221Temperature Gauge - skin type, direct mount as per site requirementSupply, testing, installation, erection and commissioning. Also supply of erection material like SS armoured capillary, mounting stand and all other required material. Skin type, direct mount, 150mm dial, wetted part SS316, IP 65 rated and shatter proof heavy duty glass. ( Refer the Data Sheet attached in Technical Volume)
222Valve Junction Bob - Gas Over Oil Actauted Valve (GOOV) of different size and rating as per site requirementInstallation ofvalve junction box and their accessories inclusive of supply of necessary cable glands, terminals and complete with cabling, glanding, termination and earthing followed by testing and commissioning of complete gas over oil actuated valve.
223Gas Detection System (GDS)Design, Engineering,Power consumption, Supply, configuration, testing, installation, erection and commissioning of gas detection system including point gas detectors,control unit and junction boxes. Gas detector control unit shall be installed inside the local control panel. Supply, Laying of cable inside the cable trench, cable tray for hardwired signals and power cables from gas sensors to gas detectors control unit including glanding, termination, ferruling, dressing etc. at both ends.Supply of cable trays, installation and erection of cable trays and, supply of erection materials, cable ferrules, cable lugs, cable tie.
224IR type, Flame proof, IP-65, housing material SS316 without display, range 0-100% LEL point hydrocarbon gas detector.
225Hooter, electronic multi-tone,IP-65, Ex\"d\" and epoxy coated aluminium housing material.
226Beacon, electronic stroboscopic type,IP-65, Ex\"d\" and epoxy coated aluminium housing material.
227Manual Call Point (MCP), electronic, 24 VDC power, IP-65, Ex\"d\" and GRP/aluminium housing material
228Junction box
229Cables, Cables Trays and Junction boxesSupply, laying, installation, erection of signals cable from pressure transmitters, temperature transmitter to junction boxes, junction boxes to local control panel (LCP) and LCP panel to RTU including glanding, termination, ferruling, dressing etc. at both ends.Laying of cable from remote operated valve junction box to local control panel (LCP) and LCP panel to RTU including glanding, termination, ferruling, dressing etc. at both ends.Supply of cable trays, cables glands, junction boxes, erection materials, cable ferrules, cable lugs, cable tie.Installation and erection of cable trays and junction boxesPreparation of cable trench for burying cable, excavation, restoration of trench and compacting. Supply and laying of bricks and sand, pipes at all the crossings etc.
2301P X 1 .5 Sq. mm Over all Screened
2311Q X 1 .5 Sq. mm Over all Screened
23212P X 0 .5 Sq. mm Individual Screen & Over all Screened
2333C X 2 .5 Sq. mm Power cable
234Serial communication cable, Modbus RS - 485, PVC Sheathed, 4 pair
235Junction Box\"Flameproof Junction box as per specification with Plug and suitable forcable entries of single pair and multi pair cable as per the Instrument cable schedule
236Cable Trays (60 mm wide x 30 mm height)
237Cable Trays (100 mm wide x 30 mm height)
238Multi cable Transit (MCT) block with stay plate and module as per the approved datasheet
239Canopy
240Metering skid with PRS Testing & Commissioning assistance (For instrumentation part )Testing & Commissioning oftelemetry interface panel (TIC) , Gas Chromatograph (GC) &metering panel(flow computer panel) either in field or in control room , Laying of cables from skid JB to metering panel and /or GC panel/TIC and metering panel and /or GC panel to RTU including glanding, termination, ferruling, dressing etc. at both ends and commissioning assistance.Supply of cable trays if any, installation and erection of cable trays, cable ferrules, cable lugs, cable tie.Making of cable trench, excavation, restoration of trench, supply and installation of bricks and sand, pipes at all the crossings etc., arrangement of nitrogen cylinders (for skid testing), PSV testing (through authorised agency).
241Note: (1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of EIC. The unit rate shall be operated to work out the final payment to the contractor; (2) In each area, quantities given against individual item may be utilised / used for other consumers in same area.
242SCHEDULE OF RATES (SOR): SECTION-G [TELECOM WORKS]
243System design, Inspection & factory testing, FAT, SAT, training, installation, commissioning, Trial run, pre-factory tests, packing, forwarding and supply of all goods including commissioning spares & documentation, pre-commissioning activity for telecom
244Supply,of 24 Fibre Composite armoured Optical Fibre Cable drum (6 fibre G-655 & 18 fibre G-652)and Blowing of Optical Fibre Cable inside HDPE Duct All activities pertaining to Blowing of Optical Fibre Cable in same pipeline trench directly (after testing drum at site), through CS / HDPE conduits along the pipeline also at crossing cable, sealing using all materials required, including laying of warning mats, etc. as per direction of EIC
245Supply of jointing closure 24 Fiber, 2 way including all accessories (3M, Siemens, Raychem make only)
246Supply of 40mm ID permanently lubricated HDPE telecom duct as per technical specifications including manufacturing, factory testing, inspection, packaging, forwardingtransportation, insurance, receipt and storage at site and Laying of HDPE Telecom Duct: Laying of 40mm HDPE Ducts in same pipeline trench direct buried or cased crossing through CS / HDPE conduit in all type of soil & terrain, excavated as required, padding, backfilling, etc. including supply of HDPE Duct accessories required including plastic couplers, end plugs, cable sealing plugs, end caps, etc. suitable & sufficient for above supplied ducts, cleaning and sealing of ducts at the end laid drum lengths, preparation and supply of cable blowing pit at each Km jointing of HDPE conduit, testing OD HDPE Duct and accessories after laying preparation of report and final drawing and documents as per specification, joint location marking, erection accessories, as-built, etc.
247Telecommunication Site Work
248Supply and laying of GI Pipe (4\") at crossings for protection of OFC / HDPE duct
249Splicing, Jointing of Optical Fiber Cable (Including Supply and Installation of jointing pits including sand, etc. & joint markers)
250Supply of FTC with pig tails other accessories for termination of OFC - 24 Fibre in the Telecom Room
251Installation of FTC & Wire mesh, termination of OFC on FTC / DDF inside telecom room, splicing with steet fibre, fibre test, OTDR test, power testing of laid OFC, identification of fault, rectification, earthing, final testing and commissioning, preparation of reports, etc. work complete in all respect with all necessary accessories for all location till final Handing Over and Taking Over by Owner of laid OFC.
252Note: (1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of EIC. The unit rate shall be operated to work out the final payment to the contractor; (2) In each area, quantities given against individual item may be utilised / used for other consumers in same area.
253Total amount excluding GST for Part-A
254GST (CGST&SGST/UTGST or IGST) in percentage (%) on Net Total Amount

AI Tender Summary

OUR REF NO 42423982
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 07-03-2024
Authority
Authority Name Gas Authority Of India Limited
Work Description Construction Of Steel Pipelines And Associated Facilities For Interconnection To M/S Iggl At (I) Ip-03 Jalpaiguri, (Ii) Sv-32 (Baihata Chariali) And (Iii) Rt -Panikhaiti => Limited
Basic Detail
Tender No GAIL/NOID/CNP/PJ/LMC/LAY/23-71
Bidding Type Tender
Location
City Kamrup Metro
State Assam
Key Dates
Publish Date 22 Feb 2024
Submission Date 07 Mar 2024
Open Date 08 Mar 2024
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 8.15 Lakhs
Exemption Not Available
Document List
224ca231-edc6-459f-9c11-0bc5eaa8d8f5.html
BOQ_204359.xls
TechPart1.pdf
TechPart2.pdf
TechPart3.pdf
TechPart4.pdf
TendComm.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 22, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 07, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 08, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

224ca231-edc6-459f-9c11-0bc5eaa8d8f5.html

xls

BOQ_204359.xls

pdf

TechPart1.pdf

pdf

TechPart2.pdf

pdf

TechPart3.pdf

pdf

TechPart4.pdf

pdf

TendComm.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders