Shifting, Loading & Carriage Of 40 Mva T/F From 132 Kv S/S Cantt, Varanasi To 132 Kv S/S Sirathu Under Electy. Trans. Division-Iv, Prayagraj
Tender Overview
Project Description
Shifting, Loading & Carriage Of 40 Mva T / F From 132 Kv S / S Cantt, Varanasi To 132 Kv S / S Sirathu Under Electy. Trans. Division-Iv, Prayagraj
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Feb-2024 | DATE103 | Date | 04-Mar-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | The following work to be carried out for carriageof40MVA T/F from 132kV S/SCantt, Varanasi under ETD-I, Varanasi to 132KV S/S Sirathu under ETD-IV, Prayagraj for its Erection & Commissioning at 132KV S/S Sirathu, Kaushabi |
| 2 | Shifting of main tank of40MVA, 132/33KVpower transformerfrom stacking place to loading point, (Upto 20 meter) turning of tank if required, including all T&P, men and all other works required to complete the job satisfactorlyat 132kV S/S Cantt,Varanasi under ETD-I, Varanasi |
| 3 | Additional Shifting 60 meter @ 5Mtr |
| 4 | Packing of LV,HV & Neutral bushing of transformer |
| 5 | Loading ofnew 40MVA, 132/33KVpower transformertank on trailer/truck including all accessories and jacking the transformer tank for placing the wooden sleeper under the tank and simultaneously lifting the tank by jacking and placing sleepers continuosly under the tank till the wooden platform comes in the alingnment of trailer bed and shifting the tank from wooden plateform to traler bed . removel of rails etc from under the tanke, proper ightening of tank on trailer bed with the help of wire rope and heavey turn buckle for safe transportation at 132KV S/S Cantt Varanasi under ETD-I, Varanasi. |
| 6 | Safe Carriage of 40MVA, 132/33KV make power transformer and accessories from 132KV Varanasi Cantt under ETD-I, Varanasito 132KV Substation Sirathu, Kaushambi on suitable capacity trailer ( multi axel trailer) to be arranged by the contractor at his own cost insurance of tansformer during transit shall be done by the contractor on his own cost. the distance for carriage is approx 300Km Insurance got done by the Contractor and his to be re- imbursed as actual at the time of submission of documents as actual. (Approx Distance-220KM) |
| 7 | Unloading the new 40MVA, 132/33KVpower transformerincluding all accessories from trailer/trucks and their proper stacking at the designatesd place 132 KV Substation Sirathu. The job includes opening of laces, jacking the transformer tank for placing the rails under the tank, shifing it to the wooden sleeper plateform, to be prepared adjacent to the trailer, removing the rails from under the tank towards group by slowly removing the sleepers from under tank for which sleepers shall be arranged by contractor. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender